You are on page 1of 7

Series 200 Configuration Tool Report

Company Name: s Create Date: 2023-01-19T22:46:03-0500


Project Name: s Bill of Materials #217856
PV Module Data:
Module brand: AU Optronics Length: 65.67 inches Frame color: Silver
Model: PM220P00_220 Width: 39.37 inches Module Clamp Color: Silver
Rated power @ STC: 220 W Depth: 1.57 inches Weight: 44.1 pounds

Environmental Requirements:
Wind Speed Standard: IBC 2018 Tilt: 0 degrees
Snow Load: 0 psf Existing Terrain: N-S Slope: 0 degrees
Wind Speed: 90 mph End Clamp Preference: Universal
Topographic Condition: Standard

Array Information:
Number of rows per array: 4 High (Landscape) Grounding Method: UL 2703 Listed
Number of columns per array: 10 columns Foundation Option: Standard Pier
Number of arrays: 1 arrays Bracing: Standard
Minimum Height of Leading Edge: 48 inches Vertical Pipe: 1.5 inches
Module Overhang: 16 inches Microinverter Attachment Kits: No

Proposed Bill of Materials:


Part Number Description Qty
232-02542 SNAPNRACK, GROUND RAIL, 172IN, SILVER 20

242-02070 SNAPNRACK, ULTRA RAIL MID CLAMP, SILVER 60

242-02215 SNAPNRACK, UNIVERSAL END CLAMP 40

242-09004 SNAPNRACK, BONDING PIPE CLAMP ASSEMBLY FOR 1-1/2IN 40

232-01043 SNAPNRACK, GROUND RAIL END CAP, BLACK 40

242-02101 SNAPNRACK, GROUND LUG ASSEMBLY, 6-12 AWG 1

172-05818 HOLLAENDER, 5EXT-8, SINGLE SOCKET TEE, 1-1/2IN, AL-MG 14

172-05803 HOLLAENDER, 17-8, SINGLE ADJUSTABLE SOCKET TEE, 1-1/2IN, AL-MG 26

172-05808 HOLLAENDER, 62-8, PLUG END, 1-1/2IN, AL 18

Links to Relevant Information can


be found on our website
www.snapnrack.com/resources/

SnapNrack PV Mounting System ? www.snapnrack.com ? +(877)732-2860 ? 775 Fiero LN, Suite 200. San Luis Obispo, CA 93401 1 of 2
s (2.1.4) 2023-01-19T22:46:03-0500

STANDARD OPTIONS:
Maximum E-W post spacing: 97 inches
Adjusted E-W post spacing: 97 inches
N-S post spacing: 96 inches
Rails per Column: 2
Total Array Length: 54.8 feet
E-W exterior post distance: 48.5 feet
E-W exterior rail distance: 52.2 feet
Rail Span (RS): 96 inches
Rail Overhang (RO): 31.5 inches
Total Number of Modules: 40
Front Pier Depth: 30 inches
Back Pier Depth: 30 inches

Front Post: Back Post:


Per Array: 7 posts Per Array: 7 posts
Pier Diameter: 12 inches Pier Diameter: 12 inches
Above grade: 48 inches Above grade: 48 inches
Total length: 78 inches Total length: 78 inches
Total quantity: 7 posts Total quantity: 7 posts
Total feet of pipe: 45.5 feet Total feet of pipe: 45.5 feet

Horizontal: Brace A: Brace C: Brace D:


Per Array: 2 Per Array: 7 Per Array: 3 (Every 3rd Bay) Per Array: 3 (Every 3rd Bay)
Length: 54.8 feet Length: 107 inches Length: 108 inches Length: 108 inches
Total quantity: 2 Total quantity: 7 Total quantity: 3 Total quantity: 3
Total feet: 110 Total feet: 63 Total feet: 28 Total feet: 28

NOTE: All pipe lengths are estimated to be slightly long. Pipe fittings will slightly reduce length of cross braces, and terrain variations may
effect lengths as well. Pipe is typically purchased from a plumbing supply in 21 foot sections. It is important to make sure the pipe is threaded
on both ends and includes a coupler. Use this coupler to connect pipe sections together for the Horizontal Pipe.

Total: Concrete Estimate:


Total Posts: 14 Cubic Yards: 1.3
Total Pipe 1.5 IN: 336 feet 60 lb Bags of Concrete: 65
Total Pipe 2 IN: NA feet

SnapNrack PV Mounting System ? www.snapnrack.com ? +(877)732-2860 ? 775 Fiero LN, Suite 200. San Luis Obispo, CA 93401 2 of 2
REVISION:
MODULE MOUNTING HARDWARE G 12/1/2013 NSSE UPDATE DR
SNAPNRACK UNIVERSAL END CLAMP H 2/26/2018 PZSE UPDATE DR
I 8/6/2020 PIPE TEE MJA
NOTE: (FOR END OF ROW) J 8/31/2021 PZSE UPDATE MKW
5
TYPICAL ARRAY TORQUE 5 16 " SS CLAMPS MODULE WITH 16 " STAINLESS
(FOUR MODULES SILVER HEX BOLTS HARDWARE USING WEDGE CLAMP
SHOWN) TO 10-16 FT-LBS
TORQUE 5 FOR MODULES WITHOUT AN UNDERSIDE
16 " SS
LIP USE SNAPNRACK TOP MOUNT END
BLACK HEX BOLTS CLAMPS
TO 7-9 FT-LBS
A

RAIL SHOWN
BEFORE MODULES
ARE INSTALLED SNAPNRACK PIPE CLAMP

SECTION A-A A HORIZONTAL PIPE SUPPORTS RAILS


1
1 2 " STEEL PIPE

MODULE AND RAIL ATTACHMENT DETAILS

ISO VIEW OF RACKING ASSEMBLY HOLLAENDER SINGLE SOCKET


NOTE: TEES CONNECT HORIZONTALS
TORQUE 5 16 " SS SILVER HEX TO VERTICAL POSTS
BOLTS TO 10-16 FT-LBS - 5EXT-8 FOR 1.5" VERTICAL POSTS
SNAPNRACK - 5-89 FOR 2" VERTICAL POSTS
5
MID CLAMP TORQUE 16 " SS BLACK HEX (WITH ADDITIONAL 1/4"x1" SS
ASSEMBLY, TYP. BOLTS TO 7-9 FT-LBS SELF-DRILLING FASTENER)

THREADED PIPE
MODULE MID CLAMP
COUPLERS TO
ASSEMBLY
SNAPNRACK MATCH PIPE SIZE
GROUND RAIL

SNAPNRACK UNIVERSAL SNAPNRACK


END CLAMP (SHOWN) CHANNEL NUTS 1 1
1 2 " STEEL PIPE FOR 1 2 " STEEL PIPE FOR
OR SNAPNRACK TOP
MOUNT END CLAMP MODULE END HORIZONTAL MEMBERS BRACING MEMBERS
1
CLAMP
1 2 " STEEL PIPE ASSEMBLY
HOLLAENDER SINGLE ADJUSTABLE
SOCKET TEES CONNECT ANGLED
BRACES TO VERTICAL PIPES
SNAPNRACK - 17-8 FOR 1.5" VERTICAL POSTS
5 1
RAIL END CAP 16 "
X 1 2 " SS HEX BOLTS - 17-98 FOR 2" VERTICAL POSTS
WITH SS SPLIT LOCK WASHERS
SNAPNRACK PIPE 1
1 2 " OR 2" STEEL PIPE
CLAMP ASSEMBLY FOR VERTICAL MEMBERS

PIPE TO RAIL CONNECTION EXPLODED PIPE TO RAIL CONNECTION PIPE FITTING DETAILS

Sunrun South LLC DESIGNER: B.ARBUCKLE SCALE:


DNS DRAWING NUMBER: DESCRIPTION: REV

J
595 MARKET STREET, 29TH FLOOR SAN FRANCISCO, CA 94105 USA
PHONE (415) 580-6900 FAX (415) 580-6902
DRAFTER: M.WATKINS SNR-DC-00202 SERIES 200 SYSTEM DETAILS
DATE:
Solar Mounting Solutions THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY
REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE
APPROVED BY: B.ARBUCKLE 8/31/2021
WRITTEN CONSENT OF SUNRUN SOUTH LLC.
SEE ENGINEERING TABLES FOR REVISION:
SNAPNRACK UNIVERSAL MODULES SNAPNRACK G 12/1/2013 NSSE UPDATE DR
PIER DEPTHS AND SPAN END CLAMPS (SHOWN) MID CLAMP H 2/26/2018 PZSE UPDATE DR
LIMITATIONS. OR SNAPNRACK TOP ASSEMBLIES I 12/18/2020 PZSE UPDATE MKW
J 8/31/2021 PZSE UPDATE MKW
MOUNT END CLAMPS
UNLESS OTHERWISE SPECIFIED
IN ENGINEERING DOCS,
THE FOLLOWING
HOLLAENDER SINGLE ADJUSTABLE SOCKET TEES
VALUES APPLY. HORIZONTAL A CONNECT ANGLED BRACES TO VERTICAL PIPES
1.5" PIPE - 17-8 FOR 1.5" VERTICAL POSTS
MAX RAIL LENGTH (RL) IS 214": - 17-98 FOR 2" VERTICAL POSTS
MAX RAIL SPAN (RS) = 144"
MAX RAIL OVERHANG (RO) = 35"
BRACE C
(1.5" PIPE)
MAXIMUM MODULE WEIGHT IS
65 LBS VERTICAL POST
(1.5" OR 2" PIPE)
SNAPNRACK
CHANNEL NUT

SNAPNRACK
HOLLAENDER SINGLE SOCKET TEES
PIPE CLAMP
BRACE D BRACE A CONNECT HORIZONTALS TO VERTICAL POSTS
(1.5" PIPE) (1.5" PIPE) - 5EXT-8 FOR 1.5" VERTICAL POSTS
- 5-89 FOR 2" VERTICAL POSTS
(WITH ADDITIONAL 1/4"x1" SS DETAIL A
SELF-DRILLING FASTENER)
ISO VIEW OF RACKING ASSEMBLY
DETAILED VIEW OF PIPE TO RAIL AND BRACING INTERFACE

MAX RAIL OVERHANG (RO)


PIPE SPAN (PS)
MAX RAIL LENGTH (RL)

RAIL SPAN (RS)

ARRAY TILT ANGLE


MAX 48"
ABOVE 6" MAX
GRADE 6" MAX @ BRACE
C AND D
BRACE C AND D: SEE TABLE
4" MAX @ BRACE A FOR CONDITIONS WHEN THESE
PIER DEPTH BRACES ARE REQUIRED AND
MINIMUM FREQUENCY.
ALTERNATE BRACE
ORIENTATION AS SHOWN
MAX PIPE OVERHANG (PS)/4
ARRAY SIDE VIEW ARRAY BACK VIEW

Sunrun South LLC DESIGNER: B.ARBUCKLE SCALE:


DNS DRAWING NUMBER: DESCRIPTION: REV
SERIES 200 STANDARD INSTALLATION,
J
595 MARKET STREET, 29TH FLOOR SAN FRANCISCO, CA 94105 USA
PHONE (415) 580-6900 FAX (415) 580-6902
DRAFTER: M.WATKINS SNR-DC-00201
DATE:
8/31/2021 CONCRETE PIERS
Solar Mounting Solutions THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY
REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE
WRITTEN CONSENT OF SUNRUN SOUTH LLC. APPROVED BY: B.ARBUCKLE
SEE ENGINEERING TABLES FOR REVISION:
SNAPNRACK UNIVERSAL MODULES SNAPNRACK G 12/1/2013 NSSE UPDATE DR
PIER DEPTHS AND SPAN END CLAMPS (SHOWN) MID CLAMP H 2/26/2018 PZSE UPDATE DR
LIMITATIONS. OR SNAPNRACK TOP ASSEMBLIES I 12/18/2020 PZSE UPDATE MKW
J 8/31/2021 PZSE UPDATE MKW
MOUNT END CLAMPS
UNLESS OTHERWISE SPECIFIED
IN ENGINEERING DOCS,
THE FOLLOWING
HOLLAENDER SINGLE ADJUSTABLE SOCKET TEES
VALUES APPLY. HORIZONTAL A CONNECT ANGLED BRACES TO VERTICAL PIPES
1.5" PIPE - 17-8 FOR 1.5" VERTICAL POSTS
MAX RAIL LENGTH (RL) IS 214": - 17-98 FOR 2" VERTICAL POSTS
MAX RAIL SPAN (RS) = 144"
MAX RAIL OVERHANG (RO) = 35"
BRACE C
(1.5" PIPE)
MAXIMUM MODULE WEIGHT IS
65 LBS VERTICAL POST
(1.5" OR 2" PIPE)
SNAPNRACK
CHANNEL NUT

SNAPNRACK
HOLLAENDER SINGLE SOCKET TEES
PIPE CLAMP
BRACE D BRACE A CONNECT HORIZONTALS TO VERTICAL POSTS
(1.5" PIPE) (1.5" PIPE) - 5EXT-8 FOR 1.5" VERTICAL POSTS
- 5-89 FOR 2" VERTICAL POSTS
(WITH ADDITIONAL 1/4"x1" SS DETAIL A
SELF-DRILLING FASTENER)
ISO VIEW OF RACKING ASSEMBLY
DETAILED VIEW OF PIPE TO RAIL AND BRACING INTERFACE

MAX RAIL OVERHANG (RO)


PIPE SPAN (PS)
MAX RAIL LENGTH (RL)

RAIL SPAN (RS)

ARRAY TILT ANGLE


MAX 48"
ABOVE 6" MAX
GRADE 6" MAX @ BRACE
C AND D
BRACE C AND D: SEE TABLE
4" MAX @ BRACE A FOR CONDITIONS WHEN THESE
PIER DEPTH BRACES ARE REQUIRED AND
MINIMUM FREQUENCY.
ALTERNATE BRACE
ORIENTATION AS SHOWN
MAX PIPE OVERHANG (PS)/4
ARRAY SIDE VIEW ARRAY BACK VIEW

Sunrun South LLC DESIGNER: B.ARBUCKLE SCALE:


DNS DRAWING NUMBER: DESCRIPTION: REV
SERIES 200 STANDARD INSTALLATION,
J
595 MARKET STREET, 29TH FLOOR SAN FRANCISCO, CA 94105 USA
PHONE (415) 580-6900 FAX (415) 580-6902
DRAFTER: M.WATKINS SNR-DC-00201
DATE:
8/31/2021 CONCRETE PIERS
Solar Mounting Solutions THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY
REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE
WRITTEN CONSENT OF SUNRUN SOUTH LLC. APPROVED BY: B.ARBUCKLE
REVISION:
G 12/1/2013 NSSE UPDATE DR
H 2/26/2018 NSSE UPDATE DR
I 8/5/2020 FLANGE DETAIL DR
J 8/31/2021 GROUND SCREW MKW

VERTICAL POST, TYP.

VERTICAL POST INSTALLED


INTO GROUND SCREW AND
HARDWARE TIGHTENED PER
MANUFACTURER SPECIFICATIONS
VERTICAL POST, TYP.
VERTICAL POST, TYP.
6" MAX GRADE, TYP.

OPTIONAL: 4" TYP. HEIGHT


FORM TOP OF PIER 4" ABOVE GRADE
OPTIONAL: TYPICAL ABOVE GRADE
FORM TOP OF PIER 4" WITH 8" SONATUBE
TYPICAL ABOVE GRADE 4" TYP. HEIGHT
WITH 8" SONATUBE ABOVE GRADE
VERTICAL POST, TYP.
5 FEET
TO "CLEAR" SLOPED GRADE, GROUND SCREW,
TYP. GROUND SCREW AMERICAN GROUND ATTACH SPEED RAIL OR EQUIVALENT
DEPTH SCREW MODEL 3 (76MM) FLANGES TO BOTTOM OF VERTICAL SUPPORT
OR EQUIVALENT POSTS OR WELD 0.25" PLATE TO BOTTOM OF
VERTICAL POSTS TO CREATE FLANGE SURFACE
GROUND SCREW
LENGTH, VARIES
EXISTING STRUCTURE:
ROOF SURFACE
CONCRETE PAD
PIER DEPTH GROUND SCREW
CONCRETE PIERS
PIER DEPTH CONCRETE PIERS OTHER COMPATIBLE STRUCTURE
CONCRETE: 2,500
PSI MIN. CONCRETE: 2,500
PSI MIN. (S200 SPAN TABLES NOT APPLICABLE TO
ROOF MOUNT INSTALLATION. SITE SPECIFIC
ENGINEERING MAY BE REQUIRED)

SHEATHING, TYP.

RAFTER, TYP.
PIER DIAMETER PIER DIAMETER SECURE FLANGES
12" MIN, TYP. 12" MIN, TYP. TO SURFACE USING
GROUND SCREW DETAIL FLANGE MOUNT DETAIL APPROPRIATE HARDWARE
STANDARD PIER DETAIL STANDARD PIER DETAIL ON SLOPED GRADE
TO RESIST PULL OUT
FORCES OF 800 LBS

Sunrun South LLC DESIGNER: B.ARBUCKLE SCALE:


DNS DRAWING NUMBER: DESCRIPTION: REV

J
595 MARKET STREET, 29TH FLOOR SAN FRANCISCO, CA 94105 USA
PHONE (415) 580-6900 FAX (415) 580-6902
DRAFTER: M.WATKINS SNR-DC-00206 SERIES 200 FOUNDATION DETAILS
DATE:
Solar Mounting Solutions THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY
REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE
APPROVED BY: B.ARBUCKLE 8/31/2021
WRITTEN CONSENT OF SUNRUN SOUTH LLC.
REVISION:
A 2/26/2018 NEW SHEET DR

1
1-2" THREADED PIPE COUPLER. PIPE COUPLER
SHALL NOT OCCUR IN THE OVERHANG (CANTILEVER)
NOR SHALL IT OCCUR IN THE BACKSPAN OF THE
CANTILEVER WHICH IS DEFINED AS THE CLOSEST
ADJACENT SPAN TO THE CANTILEVER. PIPE COUPLER
SHALL BE LOCATED NO CLOSER THAN (PS)/6 FROM
A POST NOR FURTHER THAN (PS)/3 FROM A POST.
OVERHANG BACKSPAN
HORIZONTAL PIPE

(PS)/6 <X<(PS)/3
POST, TYP.

6" MAX @ BRACE FOOTING, TYP.


C AND D ROUGH GRADE

BRACES PER
CONFIGURATION
TABLES

OVERHANG ARRAY BACK VIEW

Sunrun South LLC DESIGNER: B.ARBUCKLE SCALE:


DNS DRAWING NUMBER: DESCRIPTION: REV

A
595 MARKET STREET, 29TH FLOOR SAN FRANCISCO, CA 94105 USA
PHONE (415) 580-6900 FAX (415) 580-6902
DRAFTER: D.RYAN SNR-DC-00204 SERIES 200 PIPE SPLICE DETAIL
DATE:
Solar Mounting Solutions THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY
REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE
APPROVED BY: B.ARBUCKLE 2/26/2018
WRITTEN CONSENT OF SUNRUN SOUTH LLC.

You might also like