3. RO-RO BERTH STRUCTURE
APRON PAVEMENT
Work Execution
20
3. RO-RO BERTH STRUCTURE
MOORING POST WORK
Work Execution
22 Sand reclamation
a. Preparation Works
23 Sand reclamation
b. sand filling application works.
24
25
26
27
28 Coping concrete WSW-6
29 Coping concrete WSW-6
please also include in the list of materials, work support materials, such as working
platform for pier heads and coping, hanging bracket, etc, with considering to planning
of work sequence.
Please provide detail drawing for Bracket A and Bracket B, and platform system for
Pierhead Works.
Need to be clarified clearly for Bracket B, in associated with bracket for Coping Work
platform.
Please mention also in the work sequence, Welding steel plate works and rebar
welding works.
After Installing rebar pier head (Phase II), next step was Installing Support for casing
Coping concrete (stage I) and continued with Place anchor deck slab, please clearly
clarified corelation between that 3 step above.
Step Launching and stressing of PC deck slab, please include the required
timeframe based on the pierhead step 2 concrete curing time before it can be loaded
by the PC deck slab, as well as the process requirements that must be carried out
before stressing the PC deck slab.
Welding plate work on SPP and Diagonal Strut Member need to be mentioned also
in this work step
Please show in the drawing steel frame that has been mentioned in related with steel
frame for coping.
On the drawing has note “PIER HEAD”, need to be clarified, step of casting concrete
pier head or for other purpose.
Need to be added the drawing of:
- Bracket A
- Bracket B
- Bracket D1000
- Section of staging platform by considering dismantling process.
- Side formwork supporting system
- Dimension of staging platform by considering work space area.
- Casting concrete Pierhead procedure.
- Step work installation of Precast Concrete Fender.
- Staging platform system for casting concrete Pierhead stage II.
- Detail overlapping of formwork for Pierhead stage II to stage I.
Please mention what type of maintenance will be carried out on the concrete surface
in STAGE I to get the proper concrete rough surface
Please provide clear drawing, drawing that has provided was blur, difficult to read.
Please provide drawing which shows crane position, coping position, crane working
radius.
Need to provide drawing of support system for phenol board on gap between precast
concrete.
On image of stages of coping concrete casting between pierhead and coping was not
monolith, but if see rebar arrangement drawing of pier head no. PKG5-CRB-033,
rebar of pierhead was continue till coping, mean pierhead and coping was monolith,
please clarify.
Please clarify image drawing beside image of Illustration of in-situ Concrete for
Coping Concrete.
Please provide Work Sequence of PC Deck Slab Work.
Working radius on PC Deck Slab Installation image was 38 m, but on Lifting Plan
working radius calculation for 34 m, please clarify.
Grouting material should obtain to the Engineer approval before apply on site.
For the second phase casting concrete of Apron Pavement that plan to be directly
pouring, by passing through to the first phase apron concrete, please for casting still
use concrete pump, same as first phase casting concrete to avoid any damage
possibility on first phase apron concrete.
Please provide work sequence and image drawing of Anchorage Slab Fabrication.
For shape of Precast Coping Concrete, please consider actual position PCCSP on
site, in order precast can applicable, although actual PCCSP on site, a little irregular.
Please provide image drawing of formwork system for In-Situ Concrete for Land Side
Coping
Please describe what kind of treatment will apply to dowel bar, in order the dowel bar
can function as planned.
Please provide work sequence and image drawing of Anchorage Slab Fabrication.
Please provide image drawing of formwork system for In-Situ Concrete for Land Side
Coping
Please describe what kind of treatment will apply to dowel bar, in order the dowel bar
can function as planned.
For shape of Precast Coping Concrete, please consider actual position SPSP on
site, in order precast can applicable, although actual SPSP on site, a little irregular.
Please provide image drawing of bottom formwork stage to cover the actual
irregularities of the SPSP on site.
Silt and clay content change to less than 10% as per amended specification.
Add “Trailer” in the equipment list in order to transferring precast segments from
fabrication yard to the loading area
Curing work will be carried out after completed the casting works using approved
curing compound, polyethylene sheet, wet hessian and fresh water continuously.
Once the block casted, concrete treatment will be implemented to protect the blocks
during extreme heat or heavy rain by cover the blocks using a blue sheet.
Please provide the traffic management during the work activity; also provide the
phase of the works on your method statement based on work sequences.
The activity will be conducted before the pavement works which means the
temporary road must be compacted to achieve the stability with the required
maximum load
Please provide the exact equipment and the capacity of the Truck Mounted Crane,
Warehouse and material distribution with detailed Safety approach
Please provide the delivery and distribution material, storage protection, perimeter
fencing
Translate PIC
Untuk Daftar Tenaga Kerja, harap diperhatikan perencanaan urutan
pekerjaan (flowchart) terkait dengan jumlah tenaga kerja yang dibutuhkan
(metode dari mas fian).
Berikan gambar detail untuk Braket A dan Braket B, dan sistem platform
untuk Pierhead Works.
Perlu diklarifikasi dengan jelas untuk Braket B, terkait dengan braket untuk
platform Coping Work.
Sebutkan juga dalam urutan pekerjaan, Pekerjaan las pelat baja dan
pekerjaan las tulangan.
Pekerjaan pelat las pada SPP dan Diagonal Strut Member perlu
disebutkan juga dalam langkah pekerjaan ini
Rasen
Tolong tunjukkan dalam gambar rangka baja yang telah disebutkan terkait
dengan rangka baja untuk coping.
Pada gambar tersebut terdapat catatan “PIER HEAD”, perlu diperjelas, Rasen
langkah pengecoran pier head beton atau untuk tujuan lain.
Perlu ditambahkan gambar dari:
- Braket A
- Braket B
- Braket D1000
- Bagian platform pementasan dengan mempertimbangkan proses
pembongkaran.
- Sistem pendukung bekisting samping
- Dimensi platform pementasan dengan mempertimbangkan area ruang
kerja.
- Prosedur Pengecoran Pierhead beton.
- Langkah kerja pemasangan Fender Beton Pracetak.
- Sistem platform pementasan untuk pengecoran beton Pierhead tahap II.
- Detail tumpang tindih bekisting untuk Pierhead tahap II hingga tahap I.
Pekerjaan las pelat baja perlu disebutkan pada item urutan pekerjaan.
Rasen
Harap berikan gambar yang jelas, gambar yang disediakan buram, sulit
dibaca.
Rasen
Harap berikan gambar gambar sistem bekisting untuk In-Situ Concrete for
Land Side Coping
Mohon dijelaskan perawatan apa yang akan diterapkan pada dowel bar,
agar dowel bar dapat berfungsi sesuai rencana.
Abib
Harap berikan gambar gambar sistem bekisting untuk In-Situ Concrete for
Land Side Coping
Mohon dijelaskan perawatan apa yang akan diterapkan pada dowel bar,
agar dowel bar dapat berfungsi sesuai rencana.
Abib
Tidak ada pernyataan yang jelas tentang tingkat produktivitas dari setiap
Abib
kegiatan.
Tidak ada sketsa atau gambar sederhana untuk aplikasi settlement plate
Abib
untuk memahami metodologinya.
Untuk menunjukkan rencana tanggul dalam pernyataan metode.
Setelah balok dicor, akan dilakukan perawatan beton untuk melindungi Rasen
balok dari panas yang ekstrim atau hujan lebat dengan menutup balok
menggunakan lembaran biru.
Harap berikan jadwal konstruksi terperinci (urutan dan durasi) yang sesuai
dengan penawaran Anda termasuk bahan manufaktur, pengiriman, jadwal
peralatan dan jadwal tenaga kerja sesuai dengan kapasitasnya untuk Febrian
evaluasi kami.
Harap berikan manajemen lalu lintas selama aktivitas kerja; berikan juga
fase pekerjaan pada pernyataan metode Anda berdasarkan urutan
pekerjaan.
Kegiatan tersebut akan dilakukan sebelum pekerjaan perkerasan yang
berarti jalan sementara harus dipadatkan untuk mencapai stabilitas Rasen
dengan beban maksimum yang dibutuhkan
Harap berikan peralatan yang tepat dan kapasitas Derek yang Dipasang di
Truk, Gudang, dan distribusi material dengan pendekatan Keselamatan
yang terperinci
Tolong Perlihatkan Bagan Alir Drainase Stormwater
Jeje
Jeje
Reffering to page 38
Already added to the method Mas Mba minta tolong dicek lagi yaa revisiku, takut salah:(
Reffering to page 76