Professional Documents
Culture Documents
GTD CF Acceptace Criteria
GTD CF Acceptace Criteria
a Base Structure
● S.R.Report
● Bottom Flatness Report ( Should be with in 0.05/mtr)
b Gauge pins & Bushes
● Material Test report
● Hardness Report
● Dimensional report
c Templates
● Gap Inspection Report with gauge Pin
d Visual Inspection
● visual Inspection as per GTD Checklist & should be filled by supplier.
e CMM Inspection report
● Refer following tolerances if not specified in customer std. for CMM
● Take reference from Tooling Holes & Vertical reference pad.
● CMM Inspection should be carried out as per procedure given by GTD.
● CMM Report should be submitted in GTD format .