You are on page 1of 9

Aspen In-Plant Cost Estimator Version: 41.

0
Estimate Base: 1st Quarter 2022 (IEE: 50.0)
Run Date: 13JUL23-11:28:34

Aspen In-Plant Cost Estimator


is a Product of: * * * * * * * * * * * * * * * * * * * *
Aspen Technology, Inc. * Throughout this report *
Worldwide Headquarters: * the Symbol "USD" *
20 Crosby Drive * represents U.S. DOLLARS *
Bedford, MA 01730 * * * * * * * * * * * * * * * * * * * *
U.S.A.
Telephone: 781-221-6400
Fax: 781-221-6410
Web: http://www.aspentech.com
Support: esupport@aspentech.com
U N I T S O F M E A S U R E D A T A S H E E T

=====================================================================================
: : SYSTEM BASE : USER : CONVERSION OF : USER : CONVERSION OF :
:TYPE : UNITS OF MEASURE : SPECIFIED : INPUT FROM : SPECIFIED : OUTPUT FROM :
:NO. : (I-P) -(METRIC) : INPUT UNIT : METRIC UNITS : OUTPUT UNIT : METRIC UNITS :
=====================================================================================

1 INCHES - MM
2 FEET - M
3 MILES - KM
4 MESH - MESH
5 SF - M2

6 SY - M2
7 CF - M3
8 CY - M3
9 GALLONS - M3
10 BARRELS - M3

11 BAGS - BAG-50KG
12 LBS - KG
13 TONS - TONNE
14 LB/FT - KG/M
15 LB/YD - KG/M

16 LB/BATCH- KG/BATCH
17 PCF - KG/M3
18 PSIG - KPAG
19 IN HG - KPA
20 IN H2O - PA

21 MM HG - PA
22 PSF - KN/M2
23 FPM - M/H
24 MPH - KM/H
25 RPM - RPM

26 CFM - M3/H
27 CFH - M3/H
28 CFM/SF - M3/H/M2
29 GPM - L/S
30 GPH - M3/H
U N I T S O F M E A S U R E D A T A S H E E T

=====================================================================================
: : SYSTEM BASE : USER : CONVERSION OF : USER : CONVERSION OF :
:TYPE : UNITS OF MEASURE : SPECIFIED : INPUT FROM : SPECIFIED : OUTPUT FROM :
:NO. : (I-P) -(METRIC) : INPUT UNIT : METRIC UNITS : OUTPUT UNIT : METRIC UNITS :
=====================================================================================

31 LB/H - KG/H
32 TPH - TONNE/H
33 TPD - TONNE/H
34 V - V
35 KV - KV

36 A - A
37 KA - KA
38 W - W
39 KW - KW
40 KVA - KVA

41 TONS-REF- KW
42 BTU/H - W
43 MMBTU/H - MEGAW
44 BTU/H/SF- W/M2
45 BTU/LB - KJ/KG

46 CPOISE - MPA-S
47 CSTOKE - MM2/S
48 BD FT - M3

-------------------------------------------------------------------------------------

BASE UNITS OF INPUT =METRIC BASE UNITS OF OUTPUT =METRIC

SPECIAL INPUT UNITS: SPECIAL OUTPUT UNITS:


-------------------- --------------------
TEMPERATURE = DEG C TEMPERATURE = DEG C
PIPE SIZING = MM PIPE SIZING = MM
DRIVER POWER = KW DRIVER POWER = KW
IN-MM ABBREV.= MM IN-MM ABBREV.= MM
FT-M ABBREV.= M FT-M ABBREV.= M
=====================================================================================
1
#1#TV-1 VT - 2

EQUIPMENT ITEM DESIGN DATA SHEET

STORAGE

NO. ITEM VALUE SPECIFIED UNITS VALUE USED UNITS


BY USER BY SYSTEM

EQUIPMENT DESIGN DATA


1. Liquid volume 1601.0 M3 1601.0 M3
2. Design gauge pressure 20.00 KPAG 20.00 KPAG
3. Design temperature 25.00 DEG C 25.00 DEG C
4. Operating temperature 25.00 DEG C
5. Fluid specific gravity 0.7000 0.7000

SHELL DATA
6. Shell material CS CS
7. Diameter option OD
8. Vessel diameter 13.00 M
9. Vessel height 12.19 M
10. Roof type CONE CONE

MECHANICAL DESIGN DATA


11. Weld efficiency 85.00 PERCENT
12. Thickness Average 8.000 MM
13. Corrosion allowance 3.000 MM

THICKNESSES REQUIRED
14. Circumferential stress thickness 6.102 MM

NOZZLE AND MANHOLE DATA


15. Nozzle ASA rating 150 CLASS
16. Nozzle material A285C
17. Nozzle A Quantity 14 14
18. Nozzle A Diameter 50.00 MM DIAM 50.00 MM DIAM
19. Nozzle A Location S S
20. Nozzle B Quantity 3 3
21. Nozzle B Diameter 300.0 MM DIAM 300.0 MM DIAM
22. Nozzle B Location S S
23. Number of manholes 2 2
24. Manhole diameter 600 MM 600 MM

WEIGHT DATA
25. Shell 28600 KG
26. Nozzles 210 KG
27. Flanges 120 KG
28. Base plate 8300 KG
29. Structural steel 11700 KG
30. Total weight 48900 KG

VENDOR COST DATA


31. Material cost 146255 DOLLARS
32. Field fabrication cost 91636 DOLLARS
33. Fabrication labor 1478 HOURS
34. Shop labor cost 13954 DOLLARS
35. Shop overhead cost 15494 DOLLARS
36. Office overhead cost 45448 DOLLARS
37. Profit 43814 DOLLARS
38. Total cost 356600 DOLLARS
39. Cost per unit weight 7.292 USD/KG
40. Cost per unit liquid volume 222.7 USD/M3

L/M
:---MATERIAL--:*** M A N P O W E R ***: RATIO :
: USD : USD MANHOURS :USD/USD :
EQUIPMENT&SETTING : 356600. : 0. 0 : 0.000 :
PIPING : 0. : 0. 0 : 0.000 :
CIVIL : 0. : 0. 0 : 0.000 :
STRUCTURAL STEEL : 0. : 0. 0 : 0.000 :
INSTRUMENTATION : 0. : 0. 0 : 0.000 :
ELECTRICAL : 0. : 0. 0 : 0.000 :
INSULATION : 0. : 0. 0 : 0.000 :
PAINT : 0. : 0. 0 : 0.000 :
-------------------------------------------------------------------
SUBTOTAL : 356600. : 0. 0 : 0.000 :

INSTALLED DIRECT COST 356600. INST'L COST/PE RATIO 1.000


=====================================================================
APPENDIX A

DETAILED BULK MATERIAL AND FIELD MANPOWER LISTING

TOTAL PROJECT
LICENSED FOR USE BY **
A - 1.01
PROJECT:
0101 Main Area - Main Area

============================================================================================================
=======================
: : : : : : : : :
MAT'L : MANPOWER :
: CODE:CT: ORIGIN : I D : I T E M :MAT'L: D E S C R I P T I O N :QUANT. UNITS:
COST : MH COST :
: :NO: : : : : : :
USD : USD :

============================================================================================================
=======================

121 VT 2 ATMOSPHERIC STORAGE TANK EQUIP & FIELD FABRIC. 1.0 ITEM(S)
356600 0 0
48900 KG

============================================================================================================
================

A - 1.01 0101 Main Area - Main Area


LICENSED FOR USE BY **
PROJECT:

SYSTEM INPUT LISTING VERSION 50.0A 13JUL23 11:28:34 PROJID


1 2 3 4 5 6 7 8
12345678901234567890123456789012345678901234567890123456789012345678901234567890
1* ICOST ITEM DX+ARCH R PROJID
2* T 1 129 4425
3* T 2 US USDDOLLARS U.S. DOLLARS 1 METRIC
4* T 3
5* T 4
6* T 5 US
7* M1 C MM KW
7* M1 C MM KW
8* CD1 1 PRIME CONTRACTOR
9* CD2 1
10* CD3 1
11* CS ENG 1 1 1 1 Main
12* CS PURCH 1 1 1 1 1 1 1 1 1
13* CS INSTL 1 1 1 1 1 1 1 1 1
14* W1 GENRL 1
15* U01TITLE Main Area Main Area 1 1 1
16* U02
17* U03PIPE -0
18* U04
19* U05STEEL 0
20* U06
21* U07
22* U08
23* U09
24* U10AREA GRADE 15 15
25* Q 2 2
26* DVT CS STORAGE #1#TV-1
27* 1VT S14 50 S3 300
28* 4VT 1601 20 25
29* 6VT 2 600
30* 8VT .7 CONE
1 2 3 4 5 6 7 8
12345678901234567890123456789012345678901234567890123456789012345678901234567890
LICENSED FOR USE BY **

PROJECT:

JOB DATA SHEET

DATE: 13JUL23 TIME: 11:28:34


RUN OPTION: ITEM PROJID: PROJID

I T E M QUANTITY
------------------------------------ --------

INPUT RECORDS 30

UNIT AREAS 1

SUB UNIT AREAS 0

EQUIPMENT ITEMS: MULTI-LINE (D) 1

EQUIPMENT ITEMS: SINGLE LINE (E) 0

ACTIVITIES TO 'SPAN' 0

------------------------------------ --------

SYSTEM USAGE CHARGE (SYSTEM USAGE UNITS) 33.80

*** CONGRATULATIONS - NO DIAGNOSTIC MESSAGES ***