ITEM DESCRIPTION UNIT

1.0 SITEWORKS
1.1 MOBILIZATION
1.2 EARTHFILL RIVER WASH SAND Cu.m
Cu.m
1.3 SOIL TREATMENT SOLIGNUM SOILGUARD L
1.4 LABOR SKILLED /DAY
LABOR /DAY
2.0 FORM WORKS
2.1 COCO LUMBER 2x2x10 pcs
pcs
2x3x12 pcs
pcs
2.2 PHENOLIC BOARD 3/4 (Crocodile) pcs
pcs
pcs
1/2 (Crocodile) pcs
2.3 STEEL DECK 1.2mm /m
/m
1.0mm /m
/m
2.4 MISC. ITEMS #16 G.I. WIRE KL/ROLL
#18 G.I. WIRE KL/ROLL
ASSORTED COMMON NAIL Kg
UNIT COST

5-10% CONSTRUCTION COST


1,100.00
1,300.00
665
550
750

150
140
170
180
950
1020
1100
750
860
700
700
600
1,575
2100
77