22nd May 2023

The Engineer / Civil,


Sri Lanka Port Authority,
Galle.

Dear Sir,

Request Rectifying Issues in Warehouse no. 2

We have noticed below major issues in warehouse no. 2.


1. There is a phase unbalance in power supply, due to that we are unable to operate the cable
engine with SLPA supplied power.
2. There is a water seeping through the wall between Bay-9 and Bay-10 which leads
electrical switches to short circuit & wet the floor inside warehouse.
Appreciate, if you arrange to rectify above issues soon, as we schedule to commence cable
offloading operation with the ship on the beginning of June 2023.

Thank you

K D Thanthirige
Asst. Manager
Galle Submarine Cable Depot Private Limited

Copies:

1. Mr. Senavirathna - Resident Manager / SLPA


2. Mr. Bandara – GM/GSCDPL