1. PURPOSE
Risk analysis - control process to eliminate or minimize risks to workers, employees, who work
directly with daily hazards on the construction site.
2. SCOPE OF APPLICATION
Scope of application: All jobs are on the list of tasks that require risk analysis before construction at
the site of the Company.
Analysis - risk control of the work given is mandatory and very necessary. Any non-compliance
detected at the construction site will be forced to stop immediately and be sanctioned according to
the Company's regulations.
3. DEFINITIONS AND ABBREVIATIONS
3.1 Definitions: 13 types of risks on the construction site.
3.1.1 Physical risks:
Is the risk related to physical problems, human health and problems of natural conditions such as
rain, sun, wind, storm, light ...
3.1.2 Chemical risks:
Risk related to explosives, corrosive substances, substances easily absorbed or digested into the
human body.
3.1.3 Biological risks:
Risk is related to bacteria, fungi, and insects that cause infectious diseases.
3.1.4 Risk of machinery - equipment:
Risk is related to the transmission of machinery causing such as cutting, stabbing, crushing,
crushing, grinding, rubbing, compressing, vibrating, discharging, high-pressure beam and
Page 1 / 5
Code: QT-01-HSSE
RISK ANALYSIS – CONTROL
Version: 02
PROCEDURE
Date of issue: 06/2021
equipment that has not been tested on durability, origin, service life as well as the equipment's
bearing capacity.
3.1.5 Electrical risks:
Risk is related to leakage of electricity from the construction electrical system as well as unsafe
electrical equipment such as electric shock, electric discharge, electric arc …
3.1.6 Risk of falling:
Risks associated with people slipping, falling, falling into deep holes, and objects falling from
above.
3.1.7 Risk of first aid – emergency exit:
Risks related to alarm systems, first aid rooms, first aid techniques and emergency exits of the
construction area as well as the construction site.
3.1.8 Sanitary risks:
Risks related to the premises, equipments and site’s waste.
3.1.9 Risk of information:
Risks related to communication mistakes, errors in announcing, and work communication between
the assignor and the receiver.
3.1.10 Risk of welfare:
Risk which is related to equipments of employees, workers, facilities such as gathering point,
personal hygiene area, rest and eating area in order to resuscitate during work.
3.1.11 Animal risk:
Is a risk related to insects, poisonous animals, ferocious animals that attack the human body.
3.1.12 Human risk:
Risk is related to employee's attitude, behavior, working skills, experience, age and understanding.
3.1.13 Security risks:
Is the risk related to security and order control, access control on the construction site.
3.2 Acronyms:
− Company : Newtecons Investment Construction Joint Stock Company;
− HSSE : Health, Safety, Security, Environment.
4. REFERENCES:
− ISO 9001;
− ISO 14001;
− ISO 45001.
Page 2 / 5
Code: QT-01-HSSE
RISK ANALYSIS – CONTROL
Version: 02
PROCEDURE
Date of issue: 06/2021
5. CONTENT
5.1 Flowchart:
Risk anylysis
3. Site supervisor
Not
approve
6. Sign off HSSE Supervisor
Approve
Page 3 / 5
Code: QT-01-HSSE
RISK ANALYSIS – CONTROL
Version: 02
PROCEDURE
Date of issue: 06/2021
5.2 Details:
Before starting a job on the List of Risk Analysis of Mandatory Work Items
Determine the BM-001-HSSE, Site Supervisor will hold a meeting with HSSE Supervisor,
1 sequence of Subcontractor on construction measures, from that submit the steps to
work steps perform the work and analyze the risk for this job according to the form BM-
002-HSSE.
Identify risk
2 hazards in each For each step in the work order, corresponding risks can be identified (risks
defined above), the risks will be listed in detail in the BM- 002-HSSE.
step
Depending on the R.A.F index, Site Supervisor will give appropriate control
measures:
• Exclusion: Isolate the hazard from the construction area, avoid contact
with them (when R.A.F ≥ 12)
• Replace: Replace new equipment, manpower, more suitable to avoid
4 Control risks (when R.A.F ≥ 12)
measures • Technique: Changing construction methods, working methods,
changing designs. (when R.A.F ≥ 12)
• Management: Worker safety training, inspection and licensing in work
areas (when R.A.F ≥ 12)
• Behavior: Create good links with employees through behavior (when
R.A.F <12)
• Discipline: Using company regulations and directives to handle
violations (when R.A.F <12)
Page 4 / 5
Code: QT-01-HSSE
RISK ANALYSIS – CONTROL
Version: 02
PROCEDURE
Date of issue: 06/2021
After finishing the risk analysis, Site supervisor will submit HSSE
Supervisor for approval. If it is qualified, the Site supervisor and the
6
Sign off Subcontractor will disseminate them to workers, who directly perform the
above risk analysis to implement in the correct order and responsibility. If
not, Site Supervisor will return to step 02 to redefine the risks in order to
take appropriate precautions.
Determine the While working according to analized steps, HSSE Supervisor will check the
7
sequence of comparison between the actual work and the risk analysis to ensure the work
work is done correctly.
6. APPLIED FORM:
No. Name Code Storing place Storing duration
Site Managing With project
1 Job Safety Analysis BM-001-HSSE
Board document
Site Managing With project
2 Risk assessment BM-002-HSSE
Board document