Piles

TOP VIEW

Galv.Steel ladder h= 5m

Steel walk way w=100cm , h=100cm


made by square steel pipes size 5cm
Steel gouger plate size 5 mm

I Section steel Beams size 200 mm

Piles Distribution
Tow Inlet Pipes line from Tow Sedimentation
tanks Carbon Steel t =10 mm D=500mm
Steel Channel 200mm, D=8m Tow Levels
(top & bottom )

Carbon Steel Sheets t =15 mm for 1st level &


t=12 mm for 2nd& 3nd level , D=8m , Deformed
CL2 Inlet Pipe line PPR D=50mm
and Painted by Non toxic epoxy type with 3 Layers
from CL2 Dosing pump Station
for Interior faces as T.D.S properties of Epoxy
Type and origin & outer faces by oil paint 3 layers.
.
I Section Beam size 250 mm,Circular deformed @
D=8m Center line
Top under I section beam Ø16mm @20cm c/c L=1m
Re.Concrete Raft Foundation D= 8,5 m h=50cm
(1\1,5\3) conc.mix ,30MPa, sulphate resistant cement Compacted Sub Base type B ,
with Ø16mm @20cm Tow way # top & bottom ) and h=50cm ( 95% Compacting )
Painted by Non toxic epoxy type with 3 Layers for
Interior faces as T.D.S properties of Epoxy Type Side Section
and origin. & outer faces by oil paint 3 layers.