Piles

TOP VIEW

Galv.Steel ladder h= 6m

Steel walk way w=100cm , h=100cm


made by square steel pipes size 5cm
Steel gouger plate size 5 mm

I Section steel Beams size 200 mm

Piles Distribution
Tow Outlet Pipes line To Tow Sedimentation
tanks Carbon Steel t =10 mm D=500mm
Steel Channel 200mm, D=8m @ 2,5 Tow
Levels (top & bottom )

Carbon Steel Sheets t =15 mm for 1st level &


t=12 mm for 2nd& 3nd level , D=8m , Deformed
Alum Inlet Pipe line PPR D=50mm
and Painted by Non toxic epoxy type with 3 Layers
from Alum Dosing pump Station
for Interior faces as T.D.S properties of Epoxy
Type and origin & outer faces by oil paint 3 layers .

I Section Beam size 250 mm,Circular deformed @


D=8m Center line Inlet Pipe line Carbon Steel t =10 mm
Top under I section beam Ø16mm @20cm c/c L=1m D=600mm from L.L. pump Station

Re.Concrete Raft Foundation D= 8,5 m h=50cm


(1\1,5\3) conc.mix ,30MPa, sulphate resistant Compacted Sub Base type B ,
cement with Ø16mm @20cm Tow way # top & h=50cm ( 95% Compacting )
bottom ) and Painted by Non toxic epoxy type with
3 Layers for Interior & outer faces as T.D.S Side Section
properties of Epoxy Type and origin.