Professional Documents
Culture Documents
NONE NONE
BPOM RI
Linen
X Table Cloth Napkin
X Cover Chair Accounting
Set Up Instruction LS X COD
X Set up based on coordination TV LED depan Headtable (43 inc) CL CASH
X stage Operator Table and Chair (4 Chairs) GL
X LCD & Screen (2) X Mic Headtable (3) Security
X Block Note & Pencil X Mic Meja Operator (3) parking space
X Podium BREAKDOWN
X Headtable (6 Chairs) Coffee Break Rp 40.000/Pax
X Mineral Water & Candies Lunch/Dinner Rp 130.000/Pax
X Please prepare IBM Tables's for Bazar in front of Ballroom 1 (3 Tables)
X Dahlia (Roundtable)
Deposit required,Rp. Rp - Date Receipt #
Base Charge # pax/roomAdditional
Amount
Charge ( Total amount in Rupiah )
DATE Total Amount Due
= Rp - Rp -
Total Minus Deposit
Rp -
Cash
Total Base Charge Rp - A&P
Cc: GM, EAM, SMM, FOM, FBM, Chef, CA, EHK, Asst Chief Engineering, HRM
Ria Irwandi Masri Tio Eko S Febbi Alice Maria Veronica R Terra Bendrik P
SSE DOSM CHEF FBM FC EAM GM