Name of Business Partner: M/s WIPL 1 = Untidy area minor issues sets pool example
Location: Ch. No. 198 FLO Date: 09.02.2023 2 = Restricted access, unacceptable trash, disorderly
Area name: Structures (MJB, Flyovers, ROB) (CH 189+200 to CH 232+100),Casting y Area owner: Mr. Shashwato Chakraborty 3 = Rule or procedure violation, potential injury
Brief description of Job: Pier cap construction AIC Name AIC 03 4 = Unsafe condition, serious injury potential
Weather : Clear Priority Matrix : Severity 1 &2 – Low Risk , Severity 3 Medium Risk & Severity 4 and 5 – High Risk Actions
Unsafe conditions
Sub-Location
Unsafe acts
Good Citizens
Housekeeping
Traffic Safety
Owner's EIC
Violations X
Working at
Scaffolding
Excavation
Supervisor
Number of
Violations
Explosion
Electrical
Handling
Partner's
Preventive Actual Date of
Violators
guarding
Material
Machine
Business
Fire and
Severity
Severity
Description Corrective action
Others
Height
S No Responsible Person Target Date Status Verified by Observation Pic Compliance Pic
4&5
P&M
PPE
Action/s completion
Training to be
Ch. 198 FLO Mr. Shashwato Excavated area to be hard barricaded and conducted for
1 Excavated area found without barricading Mr. IB Tiwari 0 0 1 4 4 1 0 0 0 0 0 1 0 0 0 0 0 0 1 0 increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
Chakraborty warning sign boards to be provided
awareness
Training to be
Observed improper stacking of materials Ch. 198 FLO Mr. Shashwato conducted for
2 Mr. IB Tiwari 0 0 1 2 2 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 Proper stacking of materials to be followed increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
Chakraborty
awareness
Training to be
2nos of Workmen found without PPEs Ch. 198 FLO Mr. Shashwato conducted for
5 Mr. IB Tiwari 0 2 1 3 3 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 Ensure availability of job specific PPEs increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
Chakraborty
awareness
Training to be
Improper access arrangements provided for Mr. Shashwato conducted for
6 Ch. 198 FLO Mr. IB Tiwari 0 0 1 4 4 1 0 1 0 0 0 0 0 0 0 0 0 0 1 0 Proper access arrangements to be provided increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
accessing working platform Chakraborty
awareness
Training to be
Mr. Shashwato Ensure inspection by competent person and conducted for
7 Scaffolding found without inspection tag Ch. 198 FLO Mr. IB Tiwari 0 0 1 4 4 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
Chakraborty inspection tag
awareness
0 4 7 24 24 4 0 2 0 0 1 1 1 1 0 0 1 0 5 2
% of Good Citizen 0%
Number of Violations 7
Average Severity Index 3.43
Number of Severity 4 & 5 Violations 4
Number of Workers Observed
4
Number of People on Site 4
% of Workers Observed 100.00