Safety Risk Field Audit Description of Severity rating:

Name of Business Partner: M/s WIPL 1 = Untidy area minor issues sets pool example

Location: Ch. No. 198 FLO Date: 09.02.2023 2 = Restricted access, unacceptable trash, disorderly

Area name: Structures (MJB, Flyovers, ROB) (CH 189+200 to CH 232+100),Casting y Area owner: Mr. Shashwato Chakraborty 3 = Rule or procedure violation, potential injury

Brief description of Job: Pier cap construction AIC Name AIC 03 4 = Unsafe condition, serious injury potential

5 = Immediate serious injury potential, stop activity immediately and correct

Mr. Jinka Penchalaiah. Mr. Ayush


Audit Team : Kumar.Mr. IB Tiwari. Mr. Ajay
Kumar Saini. Mr. Dharani Kumar

Audit Time : 11.00 to 12:00 Hours

Weather : Clear Priority Matrix : Severity 1 &2 – Low Risk , Severity 3 Medium Risk & Severity 4 and 5 – High Risk Actions

Unsafe conditions
Sub-Location

Unsafe acts
Good Citizens

Housekeeping

Traffic Safety
Owner's EIC

Violations X

Working at

Scaffolding
Excavation
Supervisor

Number of
Violations

Explosion

Electrical

Handling
Partner's
Preventive Actual Date of

Violators

guarding

Material
Machine
Business

Fire and
Severity

Severity
Description Corrective action

Others
Height
S No Responsible Person Target Date Status Verified by Observation Pic Compliance Pic

4&5

P&M

PPE
Action/s completion

Training to be
Ch. 198 FLO Mr. Shashwato Excavated area to be hard barricaded and conducted for
1 Excavated area found without barricading Mr. IB Tiwari 0 0 1 4 4 1 0 0 0 0 0 1 0 0 0 0 0 0 1 0 increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
Chakraborty warning sign boards to be provided
awareness

Training to be
Observed improper stacking of materials Ch. 198 FLO Mr. Shashwato conducted for
2 Mr. IB Tiwari 0 0 1 2 2 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 Proper stacking of materials to be followed increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
Chakraborty
awareness

2nos of Workmen found engaged in height Training to be


Ch. 198 FLO Mr. Shashwato conducted for
3 work without full body harness Mr. IB Tiwari 0 2 1 4 4 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1 Ensure adequate fall protection arrangements increasing Mr. IB Tiwari 11.02.2023 - close
Chakraborty
awareness

Observed improper routing of electrical Training to be


Mr. Shashwato conducted for
4 cables Ch. 198 FLO Mr. IB Tiwari 0 0 1 3 3 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 Ensure proper routing of electrical cables increasing Mr. IB Tiwari 11.02.2023 - close work is completed,electrical cable is removed
Chakraborty
awareness

Training to be
2nos of Workmen found without PPEs Ch. 198 FLO Mr. Shashwato conducted for
5 Mr. IB Tiwari 0 2 1 3 3 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 Ensure availability of job specific PPEs increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
Chakraborty
awareness

Training to be
Improper access arrangements provided for Mr. Shashwato conducted for
6 Ch. 198 FLO Mr. IB Tiwari 0 0 1 4 4 1 0 1 0 0 0 0 0 0 0 0 0 0 1 0 Proper access arrangements to be provided increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
accessing working platform Chakraborty
awareness

Training to be
Mr. Shashwato Ensure inspection by competent person and conducted for
7 Scaffolding found without inspection tag Ch. 198 FLO Mr. IB Tiwari 0 0 1 4 4 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 increasing Mr. IB Tiwari 11.02.2023 - close Work is completed
Chakraborty inspection tag
awareness

0 4 7 24 24 4 0 2 0 0 1 1 1 1 0 0 1 0 5 2
% of Good Citizen 0%
Number of Violations 7
Average Severity Index 3.43
Number of Severity 4 & 5 Violations 4
Number of Workers Observed
4
Number of People on Site 4
% of Workers Observed 100.00

Total Number of Violations Closed 0


Number of 4S & 5S Closed 0