You are on page 1of 1

CODE 1

SUPPLIER DOCUMENT REVIEW


PERMISSION TO PROCEED DOES NOT CONSTITUTE ACCEPTANCE OR
APPROVAL OF DECISION DETAILS, CALCULATION, ANALYSIS TEST
METHODS OF MATERIALS DEVELOPED OR SELECTED BY SUPPLIER
AND DOES NOT RELIEVE SUPPLIER FROM FULL COMPLIANCE WITH
CONTRACTUAL OBLIGATIONS.
✔ 1. WORK MAY PROCEED
2. REVISE AND RESUBMIT IN ACCORDANCE WITH COMMENTS, WORK
MAY PROCEED SUBJECT TO INCORPORATION OF CHANGES
INDICATED.
3. REVISE AND RESUBMIT, (MAJOR COMMENTS) WORK MAY NOT
PROCEED.
4. REJECTED, (REASON TO BE SPECIFIED ON THE DOCUMENT).
5. HOLD FOR A SPECIFIC REASON (TO BE SPECIFIED ON THE
DOCUMENT).
P.O. NO. 220D10 ORIG. Ahmed Elghazaly
EQUIP. TAG. DATE 22/02/2021
ENPPI SUPP. DOC. NO. D-0127 REV 3