JABATAN KERJA RAYA MALAYSIA

KERJA-KERJA PENGGANTIAN 29 UNIT LIF DAN LAIN-LAIN KERJA


BERKAITAN DI APARTMENT A,
PANGKALAN TLDM LUMUT, PERAK

NO. KONTRAK: JKR / IP / CKM / 192 / 2019

WORK METHOD STATEMENT


(SITE OFFICE HOUSEKEEPING AND MAINTENANCE)

KONTRAKTOR

FESMA SDN BHD


71-1, JALAN SBC 1,
TAMAN SRI BATU CAVES,
68100 BATU CAVES, SELANGOR
Rev: 2020-03
HOUSEKEEPING AND MAINTENANCE Site-Office-EN

Date: 16 Apr 2021


SITE OFFICE Page: i
WMS WORK METHOD STATEMENT
PROJECT TLDM LUMUT Pack

WORK METHOD STATEMENT

SITE OFFICE HOUSEKEEPING AND MAINTENANCE

VER. 2021-03

16 APRIL 2021

Prepared By Revised By
Revision Description Date
Name Date Name Date
1 Initial Release Nazmi Hanis 18 June 2020 Ir SM Salim Abu Yusof 18 June 2020 18 June 2020
2 Revise Mohd Hasif 13 December 2020 Ir SM Salim Abu Yusof 13 Dec 2020 14 Dec 2020
3 Revise Mohd Hasif 16 April 2021 Ir SM Salim Abu Yusof 16 April 2021 16 April 2021

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-03
HOUSEKEEPING AND MAINTENANCE Site-Office-EN

Date: 16 Apr 2021


SITE OFFICE Page: ii
WMS TABLE OF CONTENTS
PROJECT TLDM LUMUT Pack

Table of Contents

1.0 INTRODUCTION ............................................................................................ 1


2.0 HAZARD IDENTIFICATION ............................................................................ 2
3.0 SAFETY PRECAUTION ................................................................................... 3
4.0 HIRARC FORM .............................................................................................. 4
3.0 PERSON-IN-CHARGE ..................................................................................... 5
4.0 INFOGRAPHIC ............................................................................................... 5
5.0 WORK METHODOLOGY ................................................................................ 6

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-03
HOUSEKEEPING AND MAINTENANCE Site-Office-EN

Date: 16 Apr 2021


SITE OFFICE Page: 1
WMS INTRODUCTION
PROJECT TLDM LUMUT Pack

1.0 INTRODUCTION

Project Description
This project involves the replacement works of twenty-nine (29) lift units and other related
works at Apartment A, Pangkalan TLDM Lumut, Perak. The blocks involved in this project are
A1, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12, A13, A14, A25 and A26.
The project scope includes dismantling of the old lifts, installation of the new lifts, obtaining
approval from the JKKP, and other related works. The main priority of the project team is to
complete the project within the allocated budget and time as per contract.
The project duration for this project is 97 weeks from the date of commencement. Whereas the
defect liability period is a year from the date of handover to client. In this project, the lift model
of ACRA-PA17-C090 from Sigma Elevator will be supplied.

Objective
The purpose of this work method statement is to provide guidance of site office housekeeping
and maintenance.

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-03
HOUSEKEEPING AND MAINTENANCE Site-Office-EN

Date: 16 Apr 2021


SITE OFFICE Page: 2
WMS HAZARD IDENTIFICATION
PROJECT TLDM LUMUT Pack

2.0 HAZARD IDENTIFICATION


In order to identify hazards in organized fashion, they have been grouped into three categories.
The most common hazards that may occur during the process include:
1. Slip, trip, or fall

A person can slip, trip or fall to the ground as a result of unexpected


change in the contact between the feet and the ground. Examples
of these hazards are:

 Uneven surface
 Poor footing
 Inappropriate footwear

2. Overexertion / straining while doing task

A person can overexert or strain while doing task, or remaining in


an awkward position for an extended period. So, tasks that require
lifting heavy load shall be supported by tools or devices that limit
the potential injuries. Examples of these hazards are:

 Lifting, pushing, or pulling


 Awkward work situations
 Poor seating or repetitive work

3. Exposure to sharp edges

A person can be exposed to harmful substances or conditions. This


may occur over a short-term or long-term period or instantly as in
the case of cuts. Examples of these hazards are:

 Unprotected sharp edges


 Improper hand protection

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-03
HOUSEKEEPING AND MAINTENANCE Site-Office-EN

Date: 16 Apr 2021


SITE OFFICE Page: 3
WMS SAFETY PRECAUTION
PROJECT TLDM LUMUT Pack

3.0 SAFETY PRECAUTION

Follow the Covid-19 SOP as suggested by KKM and wear the


required minimum PPE such as safety helmet, vest, gloves,
and safety shoes. Additionally, wear the additional PPE when
appropriate.

Maintain a good housekeeping practice at site. Make


sure that all the construction materials and equipment
are stored properly when not in use to prevent materials
damage as well as slip or trip hazards.

Use appropriate tools or machines when lifting. Tasks


that require lifting more than 25 kg should be supported
by tools or machines to limit the potential injuries.

Conduct safety audit and procedures to report,


evaluate, and address any accidents or near misses that
occur at the site.

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-03
HOUSEKEEPING AND MAINTENANCE Site-Office-EN

Date: 16 Apr 2021


SITE OFFICE Page: 4
WMS HIRARC FORM
PROJECT TLDM LUMUT Pack

4.0 HIRARC FORM

HIRARC FORM
Company: Fesma Sdn Bhd
Conducted by:
Process / Pengkalan Tentera Laut DiRaja (Name,
Location: Malaysia (TLDM), Lumut Designation)

Approved by: Date: …. / …. / 2020 to …. / …. / 2020

Date: …. / …. / 2020 Review Date: …. / …. / 2020

1. Hazard Identification 2. Risk Analysis 3. Risk Control

Which Existing PIC


Work can Risk Likeli Seve Recommendati (Due
No. Hazard Risk
Activities cause / Control hood rity on Date /
effect (if any) Status)

Wear safety
Slip trip Physical boots and
1 ii L
and fall injuries practice
housekeeping

Site Office Consider using


Overexer
Housekeeping Back pallet jack or
tion / 1 i L
1. and pain correct lifting
straining
Maintenance heavy tool

Wear PPE such


Exposure as safety
Tissues
to sharp 2 ii L helmet, safety
injuries
materials glove, goggles
etc

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-03
HOUSEKEEPING AND MAINTENANCE Site-Office-EN

Date: 16 Apr 2021


SITE OFFICE Page: 5
WMS PERSON-IN-CHARGE & INFOGRAPHIC
PROJECT TLDM LUMUT Pack

3.0 PERSON-IN-CHARGE

In the execution and control of site office housekeeping and maintenance, the responsibilities
of Key Personnel are as described below:
(a) Project Manager (Fazlina Binti Mohd Fauzi – 011 10644155)

 Responsible for the overall project management and execution including


site office housekeeping and maintenance.
(b) Site Supervisor (Raja Nur’ Aqilah Binti Raja Anuar – 016 2285421)

 Assist in monitoring and coordinating the project progress on site.

4.0 INFOGRAPHIC

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-03
HOUSEKEEPING AND MAINTENANCE Site-Office-EN

Date: 16 Apr 2021


SITE OFFICE Page: 6
WMS WORK METHODOLOGY
PROJECT TLDM LUMUT Pack

5.0 WORK METHODOLOGY

Prework
1. Prepare the necessary paperwork and documentations related to the site office
housekeeping and maintenance work.
2. Submit the proposed method statement of site office housekeeping and maintenance
for the Superintendent Officer’s approval.
3. Discuss with the subcontractor and other relevant parties about the job scope.
Before Work Procedure
1. Conduct briefing with all relevant parties (supervisor, sub-contractors, and workers) to
ensure they fully understand the work requirements.
2. Carry out the preparation work for office cleaning, photocopy maintenance, air
conditioner maintenance, mosquito fogging, and sewage services.
3. Ensure sufficient signages and notices prior to the housekeeping and maintenance works.
Mid-Work Procedure
1. Office Cleaning Service
 The routine office cleaning works include floor cleaning, window cleaning,
toilet cleaning, dish cleaning, and other necessary cleaning works.
 It covers the area in the office, pantry, toilet, surroundings, and other
necessary area.
 For the surrounding area, lawn mowing works will be done and Crusher
run on the affected area such as puddle or smudge.
 It will be done twice a week on every Tuesday and Friday unless extra day
cleaning is needed.
2. Photocopy Machine Maintenance
 The photocopy machine service includes setup installation, paper supply,
ink replacement, and other necessary service.
 It also covers the supply of 3 reams of A4 and A3 papers per month, 1
carton of toner per 3 months, and 1 set of copier drums every 6 months.
 The team will come for maintenance service if there is any damaged occur.

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-03
HOUSEKEEPING AND MAINTENANCE Site-Office-EN

Date: 16 Apr 2021


SITE OFFICE Page: 7
WMS DETAIL DRAWING
PROJECT TLDM LUMUT Pack

3. Air Conditioner Maintenance


 In order to maintain the air quality and freshness, the air conditioner will
be serviced and cleaned when necessary.
 The service includes component replacement, cleaning, and maintenance.
 If there is any damage occur, the maintenance team will come to replace
the damaged components.
4. Sewage Cleaning Service
 The sewage cleaning service (Indah Water Konsortium) will desludge the
septic tank when needed to make sure the system functions efficiently.
 The septic tank is not expected to be full until the end of contract period.
If otherwise happens, the team will come to desludge the septic tank.
 Before clearing the site area for good, the team will empty out the septic
tank to be properly removed and disposed.
5. Mosquito Fogging Service
 The mosquito fogging service will be done to avoid the breeding of
mosquito at the site office area.
 The team will come to the site and apply spray throughout the area.
 The service will be carried out once a month as suggested by the site safety
supervisor.
After Work Procedure
1. Maintain a good housekeeping practice in the site office.
2. Ensure the waste is collected and disposed-off at the appropriate dumpsite.
3. Lock the gate and door with the heavy-duty lock at all time for security purposes.
4. Verification form will be given to JKR for approval of the work that has been done.