This document provides a daily quality inspection schedule for the Tangguh Expansion Project LNG EPC permanent work. It lists 16 inspections to be performed by Fahrul H. Baadila at the IWMF location, including inspections of rebar installation, concrete placement, compaction testing, and structural concrete works. The inspections include checking rebar installation, subgrade preparation, concrete deliveries, and completion prior to backfilling.
Original Description:
Original Title
Copy of Leighton's RFI Scheduled Planning May 15 2023 Part 2
This document provides a daily quality inspection schedule for the Tangguh Expansion Project LNG EPC permanent work. It lists 16 inspections to be performed by Fahrul H. Baadila at the IWMF location, including inspections of rebar installation, concrete placement, compaction testing, and structural concrete works. The inspections include checking rebar installation, subgrade preparation, concrete deliveries, and completion prior to backfilling.
This document provides a daily quality inspection schedule for the Tangguh Expansion Project LNG EPC permanent work. It lists 16 inspections to be performed by Fahrul H. Baadila at the IWMF location, including inspections of rebar installation, concrete placement, compaction testing, and structural concrete works. The inspections include checking rebar installation, subgrade preparation, concrete deliveries, and completion prior to backfilling.
SUBCONTRA LOCATION OF CSTS QC COMPANY INSPECTION INSPECTION
NO RFI NO QC INSPECTOR NAME ITEM / WORK TO BE INSPECTED TAG NO CTOR INSPECTION INVOLVEMENT CODE INVOLVEMENT CODE STATUS RESULT Check and verify cutting and bending of reinforce rebar including, X01-U-DITCH-T-2A 5 RFI-CIV021202M-LC04141 LCI IWMF WITNESS SURVEILLANCE Fahrul H. Baadila - bending shape PART 2 ACC X01-U-DITCH-T-2AC - Size/length for : • Uditch Type 2A & 2AC at IWMF Field inspection: check before concrete delivery/placement : X01-U-DITCH-T-2A 6 RFI-CIV020304M-LC05733 LCI IWMF WITNESS WITNESS Fahrul H. Baadila PART 2 ACC • Uditch Type 2A & 2AC at IWMF X01-U-DITCH-T-2AC Inspection during delivering fresh structural concrete : X01-U-DITCH-T-2A 7 RFI-CIV020305M-LC07036 LCI IWMF HOLD POINT WITNESS Fahrul H. Baadila PART 2 ACC • Uditch Type 2A & 2AC at IWMF X01-U-DITCH-T-2AC Check and verify cutting and bending of reinforce rebar including, - bending shape 8 RFI-CIV021202M-LC04142 LCI IWMF FABRICATION WITNESS SURVEILLANCE Fahrul H. Baadila X01-U-DITCH-T-2AC PART 2 ACC - Size/length for : • Precast Cover U-Ditch 2AC
Field inspection: check before concrete delivery/placement :
9 RFI-CIV021301M-LC00628 LCI IWMF FABRICATION WITNESS WITNESS Fahrul H. Baadila • Precast Cover U-Ditch 2AC X01-U-DITCH-T-2AC PART 2 ACC
Inspection during delivering fresh structural concrete :
10 RFI-CIV021302M-LC00904 LCI IWMF FABRICATION HOLD POINT WITNESS Fahrul H. Baadila • Precast Cover U-Ditch 2AC X01-U-DITCH-T-2AC PART 2 ACC
Inspection of subgrade and grade layer before laying fill material. :
11 RFI-CIV020101M-LC05921 LCI IWMF WITNESS WITNESS Fahrul H. Baadila CRANEPAD-TY1-AR04/SHT05-IWMF PART 2 ON GOING • Crane Pad Type 1 at IWMF In-situ Density / Compaction Test: 12 RFI-CIV020102M-LC03923 LCI IWMF WITNESS WITNESS Fahrul H. Baadila - Inspection execution and location of test : CRANEPAD-TY1-AR04/SHT05-IWMF PART 2 ON GOING • Crane Pad Type 1 at IWMF Check and verify cutting and bending of reinforce rebar including, 13 RFI-CIV021202M-LC04143 LCI IWMF WITNESS SURVEILLANCE Fahrul H. Baadila - bending shape CRANEPAD-TY1-AR04/SHT05-IWMF PART 2 ACC - Size/length for : • Crane Pad Type 1 at IWMF Field inspection: Check on formation level before 14 RFI-CIV020801M-LC01338 LCI IWMF WITNESS WITNESS Fahrul H. Baadila structural concrete delivery/placement : CRANEPAD-TY1-AR04/SHT05-IWMF PART 2 ACC • Crane Pad Type 1 at IWMF Inspection during delivering fresh structural concrete : 15 RFI-CIV020802M-LC01401 LCI IWMF HOLD POINT WITNESS Fahrul H. Baadila CRANEPAD-TY1-AR04/SHT05-IWMF PART 2 ACC • Crane Pad Type 1 at IWMF 189-JB-31401E-90S Finishing inspection: Check completeness of structural concrete works prior to proceed with 189-JB-31401F-90T 16 RFI-CIV020307M-LC01584 LCI IWMF HOLD POINT WITNESS Fahrul H. Baadila backfilling activities for all item’s foundation : 189-JB-31401G-90R PART 2 ACC • Minor Fnd E&I at IWMF 189-JB-31501C-90T 189-JB-31501D-90R Check and verify cutting and bending of reinforce rebar including, 17 RFI-CIV021202M-LC04144 LCI IWMF WITNESS SURVEILLANCE Fahrul H. Baadila - bending shape RETAINING WALL PART 2 ON GOING - Size/length for : • Retaining Wall at Hazardus Waste Yard IWMF Field inspection: check before concrete delivery/placement : 18 RFI-CIV020304M-LC05734 LCI IWMF WITNESS WITNESS Fahrul H. Baadila RETAINING WALL PART 2 ON GOING • Retaining Wall at Hazardus Waste Yard IWMF Inspection during delivering fresh structural concrete : 19 RFI-CIV020305M-LC07037 LCI IWMF HOLD POINT WITNESS Fahrul H. Baadila RETAINING WALL PART 2 ON GOING • Retaining Wall at Hazardus Waste Yard IWMF In-situ Density / Compaction Test: 28 RFI-CIV020102M-LC03925 LCI HELIPAD WITNESS WITNESS Fahrul H. Baadila - Inspection execution and location of test : HDPE PIPE PART 2 ON GOING • HDPE Pipe at Helipad