You are on page 1of 1

MD03-DPOA-04

09-Q.1 09-Q.8 09-Q.1 09-Q.8


ISSUED FOR
CONSTRUCTION

09-4.4 09-4.4 09-4.4 09-4.4

9' - 11 1/8"

23' - 2 7/8"
Date: Detailer:

16' - 7"
Date: Foreman:

Date: Manager:

MECHANICAL CONTRACTING, MANUFACTURING AND ENGINEERING


ENVIRONMENTAL AIR SYSTEMS, LLC
36"øUP
THROUGH ROOF 18x24 AD
IN VERTICAL

21' - 10 1/4"

26' - 10 1/2"
21' - 6 1/4"
8' - 10 1/4"

30' - 2 3/4"
18' - 10"
12' - 5 7/8"

250 SWATHMORE AVE. HIGH POINT, NC 27263


VD VD
36"øUP
22x24 AD 3 THROUGH ROOF
MD03-DPOA-04

16"TH

WEB: www.easinc.net
09-4.2 09-4.2 09-4.2 09-4.2

PH: (336) 273-1975


PO503
VD

52"ø Dryer POA (30wg)


VD

24x24 AD
2' - 5 3/4"
2' - 10"

PO441
30°DN 52"ø 24x18 AD
4' - 5 3/8"
5' - 3 1/4" LEGAL DISCLAIMER
18x24 AD PO487 THIS DOCUMENT, INCLUDING ALL IDEAS AND DESIGNS; IS AN

PI-03-02B
26"ø Dryer POA (30wg) 6' - 5 1/2" INSTRUMENT OF A PROFESSIONAL SERVICE, AND SHALL NOT
BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT
DN WITHOUT EXPRESSED WRITTEN CONCENT OF ENVIRONMENTAL
AIR SYSTEMS LLC. ANY UNAUTHORIZED USE, REUSE,
7' - 9" MODIFICATION, ALTERATION, INCLUDING AUTOMATED
CONVERSION OF THIS DOCUMENT SHALL BE AT THE USERS
SOLE RISK WITHOUT LIABILITY OR LEGAL EXPOSURE TO
24x24 AD ENVIRONMENTAL AIR SYSTEMS LLC.

10' - 8 1/8" 24"ø Dryer POA (30wg)

18"TH
20"ø Dryer POA (30wg) 9' - 5 3/4"
BOD: 5' - 6 1/2" BOD: 5' - 0 3/4"

24x18 AD

By
RO
8' - 3"
7¾"DN

7' - 0 7/8"
26"ø Dryer POA (30wg)
6' - 5"

2' - 3 1/2"

5' - 7 3/8"

9' - 9 1/2"
BOD: 4' - 9 1/4"
5' - 3" 24"ø 28"ø Dryer POA (30wg)
BOD: 4' - 10 3/4" BOD: 4' - 8 1/4" 24x24 AD

18' - 2 1/4"

13' - 3 5/8"
4' - 2" DRYER PLATFORM EIGHTH LEVEL

8' - 4 1/2"

6' - 8 1/2"
3' - 8 7/8"

19' - 8"
173' - 10"
2"TH
16x16 AD

Description
0' - 6" SYSTEM 2 DRYER STACK
09-3.8 09-3.8 09-3.8 0' - 1" 09-3.8 3
0' - 3 3/4" 11¾"TH 1/4" = 1'-0"
1' - 0 1/4"
FPV
24x24 AD

ISSUED FOR CONSTRUCTION


28"ø Dryer POA (30wg)
2' - 6 1/2" 2' - 6 3/8" 20"ø Dryer POA (30wg) BOD: 10' - 9 1/2"
24x22 AD

12¾"TH
4' - 3" 4' - 6"
24x24 AD
16"ø Dryer POA (30wg) 5' - 4" 14' - 7 7/8"
5' - 5 5/8" FPV FPV
6' - 6" 6' - 5 3/4" 6' - 5" 6' - 5 7/8" 6' - 5"
30"ø Dryer POA (30wg) 24x22 AD
28"ø Dryer POA (30wg) 24"ø Dryer POA (30wg) FPV 7' - 6"
24x22 AD

11
BOD: 4' - 8 1/4" BOD: 4' - 10 3/4" 24x24 AD

"T

09.20.22
20"ø Dryer POA (30wg) 11' - 0"

Date
H
BOD: 10' - 3 1/2"
26"ø Dryer POA (30wg) UP 24x24 AD 24"ø Dryer POA (30wg)
UP

40"ø
24"ø Dryer POA (30wg) 16"ø Dryer POA (30wg) 24x24 AD
12x12 AD

Rev.
16"ø Dryer POA (30wg) UP 14x14 AD

0
UP
7' - 5" 7' - 3 3/4"
6' - 9" 6' - 9 1/4" 6' - 9 1/4" 6' - 9 1/4" 6' - 9 1/4"
24"ø Dryer POA (30wg)
20"ø Dryer POA (30wg) 28"ø Dryer POA (30wg)
24x24 AD 24x24 AD

7' - 0"
6' - 9"
26"ø Dryer POA (30wg)
28"ø Dryer POA (30wg) 36"ø Dryer POA (30wg)
UP 2' - 3 7/8"

09-3.6 09-3.6 09-3.6 09-3.6


4' - 8 7/8"

8' - 9 7/8"

11' - 5 3/8"

19' - 8 1/8"

21' - 9 3/4"

15' - 5 1/8"

13' - 3 5/8"

6' - 8 1/2"

4' - 1 1/8"

4' - 8 7/8"

6' - 8 1/2"
5' - 11 1/4"

11' - 5 3/8"

16' - 7 1/8"

21' - 9 3/4"

23' - 6 1/4"

11' - 9 3/4"

8' - 10 7/8"

2' - 0"

PROJECT GARDEN KEEPER

SYSTEM 2 DRYER POA


09-3.4 09-3.4 09-3.4 09-3.4

EDEN, NORTH CAROLINA


09-Q.1 09-Q.8 09-Q.1 09-Q.8

Nestle PURINA
BIM 360://20077GAR/20077GAR_MECHANICAL_EAS.rvt

POA DUCT PLAN DRYER PLATFORM SEVENTH LEVEL - SYSTEM 2 POA DUCT PLAN DRYER PLATFORM EIGHTH LEVEL - SYSTEM 2
2 1
1/4" = 1'-0" 1/4" = 1'-0" 10-A 10-K 09-W

M N
10-12
K L

H I J

04 G
WAREHOUSE E 03 F
PACKAGING JOB NUMBER:

C D
21-205
DATE:

09/13/22
9/20/2022 11:28:44 AM

A B
DRAWN BY:

10-1 02 - OFFICE 05-A M.REECE


PROJECT 01 DETAILED BY:
RAW PROCESSING

0 1/4 1/2 1 2
N CONTRACT REF #:: REF DATE:

IF BAR SCALE ABOVE DOES NOT READ ACCURATELY SCALE OF


DRAWING HAS BEEN ALTERED.
MD03-DPOA-04

You might also like