You are on page 1of 1

TEST SHEET

STRUCTURED CABLING SYSTEM


SITE: Lot 16A HY Dimacal cir ES Coseteng, FPIP SEZA II SYSTEMS: STRUCTURED CABLING
LOCATION: STO. TOMAS, BATANGAS
PROJECT: ALKALINE CAMPUS AREA SERVED:
DATE:
TESTING AND COMMISSIONING (COPPER CABLE)
CABLE ID NO. SUMMARY TEST LIMIT LENGTH HEADROOM DATE/TIME COMMENTS

INSTRUMENTS
INSTRUMENTS USED MODEL NO SERIAL NO. CALIBRATION DATE
DSX-5000 COPPER MODULE DSX-5000 2951057 MAY 31, 2023
DSX-5000 COPPER MODULE DSX-5000 2951261 MAY 31, 2023

TO CONFORME WITH THE FOLLOWING:


1 CHECK IF THE CABLE NO. OF PAIRES ARE CORRECT, AS PER APPROVED SPECIFICATIONS AND DRAWINGS
2 CHECK IF THE CABLES ARE PROPERLY TERMINATED TO PATCH PANEL AT IDF CABINET WITH COMPLETE TAGGING OR IDENTIFICATION

TEST CARRIED OUT BY:


CONTRACTOR'S T&C REPRESENTATIVE SIGNATURE DATE

WITNESSED AND VALIDATED BY:


CONTRACTOR'S T&C REPRESENTATIVE SIGNATURE DATE

REMARKS: