You are on page 1of 24

DETAILED DESIGN DRAWING

(GREENFIELD)
SITE ID:PH0700337
SITE CODE:
SITE NAME:
LON(E):124.020240
LAT(N):11.051530
TOWER TYPE: 4GT-42-340C

700M&2100M-3Sectors
TABLE OF CONTENTS
NO. DRAWING NO. DESCRIPTION
CONSTRUCTION SAFETY REQUIREMENTS
BILL OF QUANTITY
ARCHITECTURAL
1 AR-01 SITE INFORMATION
2 AR-02 PERSPECTIVE VIEW/ SITE LAYOUT/ ANTENNA VIEW
3 AR-03 SITE DEVELOPMENT PLAN/ ELEVATION VIEW
4 AR-04 ELEVATION VIEW
5 AR-05 EQUIPMENT LAYOUT
STRUCTURAL
1 ST-01 FENCE ELEVATIONS
2 ST-02 FENCE FOUNDATION DETAILS
3 ST-03 METAL GATE DETAILS
4 ST-04 RAMP DETAILS
5 ST-05 POWER SERVICE ENTRANCE POST DETAILS
6 ST-06 MCB/MTS/ACPDB LAYOUT
7 ST-07 TEST PIT DETAILS
8 ST-08 4GT-42-340C TOWER LINE DIAGRAM
9 ST-09 4GT-42-340C TOWER FOUNDATION SPECIFICATION
10 ST-10 4GT-42-340C FOUNDATION DETAILS (WITHOUT WATER)
ELECTRICAL
1 EL-01 EQUIPMENT LAYOUT IN CABINET
2 EL-02 EQUIPMENT CONNECTION DIAGRAM
3 EL-03 SINGLE LINE DIAGRAM
4 EL-04 ELEVATION VIEW FOR MW
5 EL-05 EARTHING & LIGHTING LAYOUT
CONSTRUCTION SAFETY REQUIREMENTS

1.The constructors shall follow the safety regulations and the mandatory provisions 15.It is strictly forbidden to cut off the power of a running equipment without
while constructing telecommunication project. authorization.
2.While constructing in special areas such as highways, railways, bridges, navigational 16. No connector is allowed in the middle of a power cord.
channels, and in urban areas with crowded traffic, it is necessary to set warning signs, 17.It is forbidden to install switches or fuses in the ground lead or AC neutral wire.
or send special guards if needed. 18. It is strictly forbidden to hang signal lines and power lines on the lightning
3. In high-altitude operations, constructors should ware safety belts, helmets, and soft receptor, down conductor and its support.
rubber insulated shoes. 19. It is strictly forbidden to hang the AC power cord on the communication device.
4. Temporary facilities such as living place, offices must be safe, secure, and 20. Verify the power supply capacity when using the original power outlet.
comply with fire safety regulations. Combustible material is strictly forbidden in building 21. Electric operations should use well-insulated tools and be operated by qualified
temporary facilities. Temporary facilities should be far away from electrical facilities operator. When operating in running equipment, head cabinets, and branch
and high-voltage electric wires. cabinets, do not wear metal ornaments and take effective measures to prevent
5.Living room should be built in places far away from landslides, floods and metal materials such as screws, gaskets, and metal chips from falling.
mudslides. 22. No tools or equipment shall be placed on iron frames, channels, racks, ladders.
6. When working on rivers, lakes and reservoirs, it's necessary to wear life vest and 23. When working in machine room with running equipment, the working area shall
listen to the unified command. be demarcated. The operator shall not touch the running equipment, or the fire
7. Fire and smoking are strictly prohibited while operating in optical (electric) cable protection facilities, unless it is necessary.
entry rooms, waterline houses, machine rooms, unattended stations, woodworking 24. Non-construction personnel are strictly prohibited from entering the construction
sites, warehouses, forest areas, grasslands, etc. Fire protection device for exhaust area without the consent of the on-site commander. When lifting and working on the
pipe must be installed in vehicles before entering the fire ban area. tower, it is prohibited work or stand under the tower.
8.When the cables and other materials passing through the walls or floors, the holes 25. It is strictly forbidden to operate on the tower if sick or drunk.
must be sealed with fireproof materials. 26. When working on the tower, the safety belt of the operator must be fixed to the
9. When the electrical equipment is on fire, the power must be cut off first. main structure of the tower.
10. Safety belts must comply with the national standards. It is strictly forbidden to 27. When installing the antenna feeder at high altitude, the constructor should pay
replace the seat belt with ordinary ropes, wires, etc. attention to the safety and prevent the damage of the falling objects to the people on
11.When working near power supply line, constructors must wear safety helmets, the ground.
insulated gloves, insulated shoes and use insulated tools. 28. When laying cables, do not pull hard. Do not stand on the windowsill when
12.When working near high-voltage line, the minimum distance from the laying cables on the roof. Use safety belts when you must stand on the windowsill.
high-voltage line to constructors must be guaranteed: 2.5m while the line voltage is 29. Set obvious safety warning signs at the entrance of the construction site, cranes,
below 35kV, and 4m while the line voltage is above 35kV. temporary power facilities, access passages, holes, manholes, tower bottoms,
13.When working in flammable and explosive places, explosion-proof tools must be hazardous gas and liquid storage. Safety warning signs must comply with national
used. regulations.
14.It is strictly forbidden to store flammable, explosive and other dangerous
materials in the machine room.
BILL OF QUANTITY
Equipment Service
Contents Description Model Quantity Unit Remark Contents Description Model Quantity Unit Remark
Wireless Master Device 700M-3Sectors Site Wireless Wireless Installation-Macrosite-LTE Single band-3 Sectors-3 Antenna Site
Wireless Master Device 2100M-3Sectors Site Wireless Wireless Installation-Macrosite-LTE Dual-band-3 Sectors-3 Antenna Site
Wireless Master Device 700&2100M-3Sectors 1 Site
Wireless Wireless Installation-Macrosite-LTE Dual-band-3 Sectors-6 Antenna 1 Site
Wireless Master Device 2100&2600M-3Sectors Site
Wireless Master Device 700M&2100M&2600M-3Sectors Site Wireless Wireless Installation-Macrosite-LTE Tri-band-3 Sectors-3 Antenna Site
Wireless Master Device NR-3Sectors Site Wireless Wireless Installation-Macrosite-LTE Tri-band-3 Sectors-6 Antenna Site
Wireless Master Device Super far coverage Sector Wireless Wireless Installation-Macrosite-LTE Tri-band-3 Sectors-9 Antenna Site
Wireless Antenna L700 4ports 13.8dBi Pcs
Wireless Wireless Installation-Macrosite-NR Synchronization construction-3 Sectors-3 Antenna Site
Wireless Antenna L700 4ports 15.3dBi 3 Pcs
Wireless Antenna L2.1 4ports 3 Pcs Wireless Wireless Installation-Macrosite-NR Asynchronous construction-3 Sectors-3 Antenna Site
Wireless Antenna L2.6 8ports Pcs Auxiliary Power Device Installation for outdoor cabinet 1 Cabinet
Wireless Antenna L700&L2.1 8ports 13.8/17dBi Pcs Auxiliary Civil work Equipment pad details on ground m3
Wireless Antenna L700&L2.1 8ports 15.3/17dBi Pcs Auxiliary Civil work Raft foundation-normal clay 89.69 m3
Wireless Antenna L2.1&L2.6 12ports Pcs Auxiliary Civil work Raft foundation-hard clay m3
Wireless Antenna L700&L2.1&L2600M 16ports Pcs Auxiliary Civil work Grounding system for GF site 180 Meter
Wireless Antenna L700 2ports Pcs Auxiliary Civil work Equipment room-outdoor cable tray 2.5 Meter
Wireless Antenna L2.1 2ports Pcs Auxiliary Civil work Soil test 1 Site
Auxiliary Power 2.2m Power Cabinet_LiFeO4 1 Cabinet Auxiliary Civil work Site layout and clean 1 Site
Auxiliary Power 2.2m Equipment Cabinet_LiFeO4 Cabinet Auxiliary Civil work Door details 1 Site
Auxiliary Power 2.2m Battery Cabinet_LiFeO4 Cabinet Auxiliary Civil work Power supply (service entrance) 1 Site
Auxiliary Power Rectifier Module(50A) 5 Pcs ZXD3000 Auxiliary Civil work Light 1 Site
Auxiliary Power 100Ah Lithium Iron Battery Pcs Auxiliary Power supply Power supply layouting-5KW Site
Auxiliary Power 150Ah Lithium Iron Battery 3 Pcs Auxiliary Power supply Power supply layouting-20KW Site
Auxiliary Monitoring Monitoring in cabinet 1 Site Auxiliary Power supply Power supply layouting-25KW Site
Tower Monopole DGT(C)-30-280C-2NPT Site Auxiliary Power supply Power supply layouting-35KW+ 1 Site
Tower Monopole DGT(C)-30-340C-2NPT Site Auxiliary Power supply Transformer-25KVA Site
Tower 3-Leg Tublar Tower 3GT-30-280C-2NPT Site Auxiliary Power supply Transformer-37.5KVA Site
Tower 3-Leg Tublar Tower 3GT-36-280C-2NPT Site Auxiliary Power supply Transformer-50KVA Site
Tower 4-Leg Angle Tower JGT-30-280C-2NPT Site Auxiliary Power supply Temporary power for the site installation 1 Site
Tower 4-Leg Angle Tower JGT-30-340C-2NPT Site Auxiliary Power Device Lithium Iron Battery Upgrade Seperately Pcs
Tower 4-Leg Angle Tower JGT-36-280C-2NPT Site Auxiliary Power Device Power system upgrade(Breaker, Rectifier, Rectifier model) Site
Tower 4-Leg Angle Tower JGT-36-340C-2NPT Site
Tower 4-Leg Angle Tower JGT-42-280C-2NPT Site
Tower 4-Leg Tublar Tower 4GT-42-340C-2NPT 1 Site
Tower MW Tower 4GT-36-280C-2NPT+4MW Site
Tower MW Tower 4GT-36-340C-2NPT+4MW Site
Tower MW Tower 4GT-42-280C-2NPT+4MW Site
Tower MW Tower 4GT-42-340C-2NPT+4MW Site
Tower MW Tower 4GT-48-280C-2NPT+4MW Site
Tower MW Tower 4GT-48-340C-2NPT+4MW Site

TELECOMMUNITY
Civil Work Input:
Exposure category: C D ;
Soil Bearing Capacity: 352 kpa;
Under Ground Water Level: 6 m;
N
Soft Subsoil: Yes No .
Stone type:highly weathered limestone

PELA
EZ ST
.

SITE
SITE ID (PH0700337)
PUROK MELITONIA,
BRGY. GAIRAN CEBU CITY

EXISTING
ELECTRICAL POST 25 KVA
(TAPPING POINT 279M AWAY FROM SITE)

B VICINITY MAP
BRGY. ROAD

SCALE NTS

Site Information
Site
Site ID PH0700337
Site Code
Site Name
Area Type Suburban
Location Detail
Longtitude(E): 124.020240
Latitude(N): 11.051530
Altitude(m): 12
Region VII
Province CEBU
Site Address PUROK MELITONIA, BRGY. GAIRAN
NOTE:
1, THE LEVEL INSIDE OF THE FENCE SHOULD BE HIGHER
Site Detail
THAN THE NEAREST ROAD. Site Type MacroSite
Frequency band 700M&2100M
Quantity of sectors 3
Site Sub-type Greenfield
A SITE DEVELOPMENT PLAN
SCALE NTS
Site category New
Type of property Private land

TELECOMMUNITY
LIGHTNING
OB LIGHT N

PROPOSED
PROPOSED
2100 ANTENNA
700 ANTENNA
(RRU AT THE BACK OF ANTENNA)
(RRU AT THE BACK OF ANTENNA)

RESERVED FOR
MW ANTENNA

PROPOSED
4GT-42-340C

PROPOSED EQUIPMENT
CABINET AT THE
FLAT FORM

PROPOSED ACPDB

PROPOSED MTS

PROPOSED MCB

PROPOSED
50mmØ IMC
CEF ROUTE

PROPOSED
50mmØ FLEXIBLE
METAL/PVC CONDUIT

PROPOSED
MAN LADDER
PROPOSED EQUIPMENT
CABINET AT THE FLAT FORM
PROPOSED
ACPDB

PROPOSED
CHB FENCE

PROPOSED
SERVICE ENTRANCE

B SITE LAYOUT
SCALE NTS

PROPOSED
GATE WAY
R
AM
P

A PERSPECTIVE VIEW
SCALE NTS

TELECOMMUNITY
N

TO AVIATION LIGHT

2*3.5mm² AC cable(BLACK/RED) with Ø 20mm PVC

PERIMETER LIGHT

PROPOSED GPS ON THE


GPS POLE ON TOWER
CABLE LADDER
EQUIPMENT CABINET

Eqipment platform ACPDB

Equipment cabinet
COMMERCIAL POWER

PERIMETER LIGHT PERIMETER LIGHT

M
ACPDB
PROPOSED GPS ON THE GPS
AVIATION LIGHT POLE ON SOUTH TOWER LEG
WITH PHOTOCELL
Powercity

3*1.5mm2 DC CABLE 2*60mm² AC cable(BLACK/RED)


(BROWN/BLACK/GREY)

MTS
TOWER SWITCH MCB
FOUNDATION

PERIMETER LIGHT
REFER TO
SINGLE LINE DIAGRAM M

COMMERCIAL POWER

2 SECTION "Y"
1 ELECTRICAL LAYOUT SCALE: NTS
SCALE: NTS
Proposed Equipment list
NOTES :
NO. Item Dimension(mm)(W*D*H) QTY Comments 1. ALL EMBEDDED PIPES @450mm DEPTH.
2. FOR WIRING & CONDUIT DETAILS REFER TO "SINGLE LINE DIAGRAM"
1 Self Supporting Tower 42000(H) 1 3. PVC PIPE FOR THE PERIMETER LIGHTS EMBEDDED IN THE COLUMN FROM
LEGEND: 2 PERIMETER LIGHT 4 GROUND TO THE PERIMETER LIGHT.
3 MCB 1
DC CABLE 4 MTS 1
5 ACPDB 1
AC CABLE
6 Equipment Cabinet 700*700*2200 1
EQUIPMENT CABINET

TELECOMMUNITY
LIGHTING

OB LIGHT
PROPOSED
700 ANTENNA
(RRU AT THE BACK OF 40.5 m
ANTENNA)
A04
PROPOSED PROPOSED
2100 ANTENNA 700M RRU A02 Reserved for MW
(RRU AT THE BACK OF
ANTENNA)
A01 N
PROPOSED
2100M RRU S01:0°
A05

PROPOSED
RESERVED FOR XXX m 700M RRU S02:100°
MW ANTENNA PROPOSED
PROPOSED 2100M RRU
2100M RRU

A06
S03:260°
Reserved for MW
PROPOSED
A03
700M RRU
MW Platform Layout
Platform 1 Layout

R8862A:
2*4mm² RRU DC POWER CABLE(BLUE/BLACK)
R8854:
2*6mm² RRU DC POWER CABLE(BLUE/BLACK)

FIBER CABLE, CABLE TIE OR CLAMP, 0.8M/PCS

Proposed Antenna Information

Sector ID NO. Antenna Group Azimuth(°) ANT Height(m) Dimension(H*W*D) M-tilt(°) E-tilt(°) Ant mounted on Type
S01 A01 L700 4ports 15.3dbi 0 40.5 3 0 Platform 1
S02 A02 L700 4ports 15.3dbi 100 40.5 0 0 Platform 1
S03 A03 L700 4ports 15.3dbi 260 40.5 0 0 Platform 1
S01 A04 L2.1 4ports 17dbi 0 40.5 3 0 Platform 1
S02 A05 L2.1 4ports 17dbi 100 40.5 0 0 Platform 1
S03 A06 L2.1 4ports 17dbi 260 40.5 0 0 Platform 1
A07 GPS ANT
PROPOSED GPS ON THE GPS
POLE ON TOWER

GPS FEEDER(6M)

PROPOSED Proposed RRU Information


PROPOSED ACPDB
EQUIPMENT AT THE PLATFORM NO. RRU Dimension(H*W*D) QTY Type
PROPOSED
PEDESTAL
1 700M RRU 422×218×165 3 R8862A

PROPOSED
2 2100M RRU 415×296×104 3 R8854
CHB FENCE
0m

A PERSPECTIVE VIEW
SCALE NTS

TELECOMMUNITY
N

PROPOSED
EQUIPMENT CABINET

PROPOSED ACPDB

A PERSPECTIVE B TOP VIEW


SCALE NTS
SCALE NTS

TELECOMMUNITY
NOTES :

1. PROVIDE DRAIN HOLES ON THE FRAMES.


2. TOP OF PIPES COVERED WITH STEEL PLATE.
3. CHB / MASONRY :

FOR NON-LOAD BEARING TYPE CONCRETE BLOCK, A MINIMUM


COMPRESSIVE STRENGTH OF 2.41MPA (350psi) SHALL BE DEVELOPED.

4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS:

WALL THICKNESS VERT. REINFORCEMENT HOR. REINFORCEMENT

(150 mm) 6 IN. 10mmØ @ 400mm 10mmØ @ 600mm

5. REINFORCING BARS: DIA.≥16,fy=414MPa


DIA.≤12,fy=275MPa

6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL


BE SOLIDLY FILLED WITH CONCRETE.

7.ALL DIMENSIONS ARE MILIMETERS AND LEVES IN METERS UNLESS


OTHERWISE NOTED.

8.THE STRENGTH GRADE OF THE WALL CHB BLOCK MASONRY


MORTAR IS NOT LESS THAN 7.5Mpa.

1 FRONT FENCE ELEVATION


- SCALE : 1:50M

2 TYPICAL ELEVATION
- SCALE : 1:50M
WELDED BARBED WIRE WELDED BARBED WIRE
(SEE NOTE #2) STAY 5-Ø10 ROUND BAR STAY 5-Ø10 ROUND BAR
(SEE NOTE #2)

Ø50 SCH. 40 G.I. PIPE Ø50 SCH. 40 G.I. PIPE 500

142 94

142 94
BARBED WIRE HOLDER BARBED WIRE HOLDER PROPOSED COLUMN

35°
35°

75 350 75

142

142
31 31
10 10

750

750

75
26

26

100
142

142
30

30
100 88 142

100 88 142
30

30

200

350

500
25 THK CEMENT MORTAR
COPING 12mmØ BARS

200

200
BOTHWAYS
100

100

200
WELDED 8-Ø10x40mm WELDED 8-Ø10x40mm

OUTSIDE

75
2000

INSIDE
LONG REBAR LONG REBAR
100 100 75 75

DIA. 25MM GRAVEL SURFACE 200 200 100


LAYOUT 100MM THK.
3 6" CHB WALL

6 CORNER POST FOOTING DETAIL


SCALE : NTS
FGL +0.300 (MIN.)
COMPACTIONNESS NOT LESS
100

4-12mmØ WITH 10mmØ LATERAL


THAN 93% TIES @ 200mm O.C. 10mmØ HORIZONTAL
+0.300
300

BARS@ 600mm
CHB
200

O.C.(anchored into post)


NGL ±0.000 2 BARBED WIRE HOLDER
SCALE : NTS 40mmØ PVC 10mmØ VERTICAL
CONTINUOUS WALL WEEP HOLES BARS @ 400mm O.C.
300

FOOTING
SCREE (50mm>DIAMETER > 40mm)
550

12mmØ BARS
BOTHWAYS
12mmØ 150mm THK CHB WITH
250

50mm THK. TIE BARS @ 200 O.C. MORTAR (150mm CHB)


LEAN CONCRETE -0.150
3-12mmØ CONT.
BARS

150
500 50
50

50

75
-0.300

1 FENCE POST DETAIL


SCALE : NTS 75 250 75
500 400

75 350 75
proposed column CONTINUOUS
200
5 WALL FOOTING DETAIL
75

50 100 50

100
SCALE : NTS
4-12mmØ WITH 10mmØ LATERAL
TIES @ 200mm O.C.
50

200
200
100

BILL OF MATERIAL(GRAVEL )
350

500
50

12mmØ BARS
BOTHWAYS

3 COLUMN SECTION A

200
NOTES :
SCALE : NTS
1. PROVIDE DRAIN HOLES ON THE FRAMES.
75

2. TOP OF PIPE POST COVERED WITH STEEL PLATE,THE SIZE AND


MATERIAL SAME AS THE PIPE.
3.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS;
4 FENCE POST FOOTING DETAIL LEAN CONCRETE STRENGTH: 7MPa;
SCALE : NTS REINFORCING BARS: DIA.≥16,fy=414MPa
DIA.≤12,fy=275MPa
4. CONCRETE PROTECTION REINFORCED AS PER NSCP, CHAPTER 4, 407.8
5 6
--
--

4
2 --
3 --
--

2 BARREL BOLT DETAIL


-- SCALE: 1:10

1 METAL GATE DETAILS


-- SCALE: 1:30

7 DETAIL B
-- SCALE: 1:5

5 GATE STOPPER DETAIL 6 DETAIL A


-- SCALE: 1:5 -- SCALE: 1:5

7
--

4 HINGE DETAIL
3 FOOT BOLT DETAIL -- SCALE: 1:5
-- SCALE: 1:10
300
10
0
15
00
00
30

1 RAMP DETAILS
- SCALE : 1:50M

BILL OF MATERIAL(RAMP )

NOTES :
1.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS.
REINFORCING BARS: DIA.≥16,fy=414MPa
DIA.≤12,fy=275MPa
2.THE CONCRETE RAMP IS LAID ON THE COMPACTED SOIL WHICH
MUST BE NO LESS THAN 93% OF MDD.
20mmØ TIMBLE EYEBOLT
MESSENGER WIRE TO
300 ELECTRICAL POLE

SPOOL INSULATOR
(IF REQUIRED PROVIDE 10mmØ BARS

400
DRIP LOOP) 6-16mmØ BARS WITH 450

650
10mmØ TIES @ 150mm O.C.
100 100 100 100

B SERVICE ENTRANCE CAP


450
50 350 50

100
10mmØ BARS(SEE
SECTION 'B' DETAIL)

50

300
100
VARIES (AS PER POWER PROVIDER REQUIREMENT)

50mmØ IMC FOR UTILITY


METERING (EXPOSED)

100
200
300
MALLEABLE CLAMP
1.0m SPACING

50
A CONDULET WITH
REMOVABLE COVER
3 COLUMN PEDESTAL DETAIL
4550

SECTION 'B'
SCALE: NTS 4
SCALE: NTS

KWHR METER
WITH CAGE & PADLOCK

1200
75 1050 75 450

450 CONDULET WITH


1300

REMOVABLE COVER

75

100
FGL +0.300 (MIN.)

300
NGL ±0.000

300
IMC CONDUIT
1200
1050

COMPACTED SOIL, COMPACTED SOIL,


COMPACTIONNESS NOT LESS THAN 93% COMPACTIONNESS NOT LESS THAN 93%
1800

GROUNDING CONNECTION 50mmØ BUSHING


BETWEEN MCB & KHW LOCKNUT
6-16mmØ BARS METER ENCLOSURE
800 300 100 BOTHWAYS 50mmØ IMC
6-16mmØ BARS TOP & BOTTOM CONDUIT
BOTHWAYS
300

75

SECTION 'A'
50mm THK. 5
50

LEAN CONCRETE
50 1200 50 SCALE: NTS

2 PEDESTAL FOOTING DETAIL


SCALE: NTS

1 ELEVATION NOTES :

SCALE: NTS 1.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS.


LEAN CONCRETE STRENGTH: 7MPa;
REINFORCING BARS: DIA.≥16,fy=414MPa
DIA.≤12,fy=275MPa
650
850
10mmØ BARS RING

50mmØ HDPE

A
ONE CLAMP PER METER

HEIGHT FROM EQIUPMENT PLATFORM TO FGL.


200 200

MTS

MTS
CONDULET WITH MCB
REMOVABLE COVER CLAMP

IMC CLAMP

50mmØ FLEXIBLE 50mmØ IMC&

1200
METAL/PVC CONDUIT 50mmØ HDPE

1200
CABLE LADDER IMC CLAMP
50mmØ IMC

FGL +0.300
50mmØ IMC
450

IMC
COUPLING
FGL +0.300

50mmØ HDPE 50mmØ PVC

450

TO EQIUPMENT PLATFORM

50mmØ PVC&
50mmØ HDPE

50mmØ PVC LONG SWEEP 50mmØ PVC LONG SWEEP


ELBOW & 50mmØ HDPE ELBOW & 50mmØ HDPE

1 ELEVATION 2 SECTION 'A'


SCALE : NTS SCALE : NTS
SEE HANDLE
DETAIL
600

50 50 400 50 50 2-12mmØ HOLE


EARTHING PIT COVER
CHECKERED PLATE WELD-ON
500mm x 500mm x 10mm THK HINGE

50 50
50mmØ PVC SEE HINGES 50 L 50mm x 6mm THK
PIPE SLEEVE DETAIL

10
400

600
10mmØ DOWEL
4-10mmØ NUTS
FB 40x4
WITH WASHERS

50 50
10mmØ HANDLE
50mm x 200mm x 6mm THK
FLAT BAR (STOPPER PLATE)

100

1 TEST PIT COVER PLAN


SCALE : 1:8M 5 HINGE DETAIL
SCALE : NTS

4 TEST PIT COVER DETAIL


SCALE : NTS

10mmØ HANDLE
EARTHING PIT COVER
CHECKERED PLATE
100 500mm x 500mm x 10mm THK
100mm THK. CHB
100

10mmØ ROUND BAR WITH


NUTS (GALVANIZED)
4 TEST PIT COVER DETAIL
800

50mmØ PVC
SCALE : NTS 50mm x 200mm x 6mm THK
PIPE SLEEVE
950

FLAT BAR (STOPPER PLATE)


800

50
FB 40x4

10
150
50

200

COMPACTED 3 HANDLE DETAIL


400 GRAVEL BEDDING SCALE : NTS

2 SECTION "A"
SCALE : 1:8M
LED LIGHT

LLVD BLVD BLVD(right side of cabinet)


Battry
DCPD BBU RRU DC-out IDU IPRAN Free Eband
Fan(3U)
125A 125A 63A 32A 32A 32A 125A 63A 32A 32A 16A 16A 125A 125A 125A 125A 16A 6A 6A 6A 6A 6A 6A

DC(8U) S3 S2 S1
To To
To BBU To MW IPRAN To Aviation light
R8862A IDU
700M

DCPD7

-48VRTN

-48V
ON ON ON ON ON ON ON ON ON ON

-48VRTN

-48V
LP ALM
OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
FREE(1U) Reserved
S3 S2 S1

IPRAN(4U) To R8854
Reserved
2100M
Reserved
IDU(2U)

MW LP(1U)
DCPD7(1U)

BBU(2U)

GPS ARRESTER/CABLE TRAY(1U) Reserved

ODF(4U)

Proposed Equipment Schedule in Equipment Cabinet

NO. Equipment QTY Comments


BATTERY
1 DC 1 ZXDUPA-MMN601
2 BBU 1 V9200
3 BATTERY 0 100AH(LI)
4 BATTERY 3 150AH(LI)
5 BATTERY 0 190AH(Lead Acid)
BATTERY
6 RECTIFIER MODULE 5 50A
7 DCPD7 1
8 DCPD 10B 0
9 IPRAN 0
10 MW IDU 0
BATTERY
11 ODF 0
12 GPS ARRESTER 1

Equipment Cabinet
200 AMP /Single Phase GENERAL NOTES:
1. ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH ZTE
SERVICE ENTRANCE PEDESTAL 2 - 60mm² THHN (BLACK/RED)
1 - 30mm² THHN (GREEN or GREEN-YELLOW) SPECIFICATIONS, THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, THE RULES AND

TO ELECTRIC UTILITY CO. IN 50mmØ IMC OR 50mm PVC PIPE REGULATION OF THE LOCAL MUNICIPALITY AND POWER UTILITY COMPANY.
SERVICE DROP (EMBEDDED IN GROUND) 2. WIRING METHOD:
230VAC, 1 PHASE SYSTEM, 60Hz
A. INTERMEDIATE METAL CONDUIT (IMC) FOR SERVICE ENTRANCE AND ALL EXPOSED PORTIONS.
MCB
IN NEMA 3R ENCLOSURE B. UNDERGROUND CONDUITS SHALL BE PVC, ENCASED IN CONCRETE .
200 AT, 2P, 25 kaic MCCB
C. GROUNDING WIRES SHALL BE INSULATED.
230V, 60 Hz
(ACPDB)
200 AT, 2P AC DISTRIBUTION PANEL 3. ALL NON-CURRENT CARRYING ELECTRICAL EQUIPMENT PARTS SHALL BE PROPERLY GROUNDED.
IP 55 Enclosure 4. MINIMUM WIRE SIZE INSTALLED SHALL BE 3.5 mm² TYPE THHN/THW, UNLESS OTHERWISE INDICATED.
5. ALL WIRES SHALL BE A BRAND.
SPD
2 - 60mm² THHN (BLACK/RED) 100 ka 6. WIRING DEVICES SHALL BE A BRAND.
1 - 30mm² THHN (GREEN or
7. ALL CIRCUIT BREAKERS SHALL BE SQUARE D BRAND, BOLT ON TYPE IN IP 55 ENCLOSURE
GREEN-YELLOW) RECTIFIER 1 1 2 RECTIFIER 2 FOR OUTDOOR LOCATIONS, USING ZTE TYPE APPROVED ENCLOSURE.
IN 50mmØ IMC OR 50mm PVC PIPE 125AT, 2P 125AT, 2P
(EMBEDDED IN GROUND) Perimeter Light C.OUTLETS 8. MAIN CIRCUIT BREAKERS SHALL BE INDUSTRIAL TYPE, 25 KAIC, WHILE BRANCH CIRCUIT BREAKERS
M 3
20AT, 2P 20AT, 2P
4
SHALL BE COMMERCIAL TYPE, 10 KAIC
GENSET PROVISION SPARE 5 6 SPARE 9. INSULATION TEST SHALL BE DONE BEFORE THE SITE IS ENERGIZED AND WITNESSED .
20AT, 2P 20AT, 2P
MTS
RESISTANCE SHALL BE GREATER THAN FIFTY(50) MEGA OHMS.
IN NEMA 3R ENCLOSURE SPACE 7 8 SPACE
200 AT, 2P, 25 kaic MCCB 10. ALL EQUIPMENT AND MATERIALS SHALL BE BRAND NEW AND SUITED TO THE REQUIRED USE.
230V, 60 Hz SPACE 9 10 SPACE 11. PULL BOXES OR JUNCTION BOXES SHALL BE PROVIDED, EVEN IF NOT
INDICATED IN THE PLANS.
12. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
TO GROUNDING LOOP
LICENSED AND REGISTERED ELECTRICAL ENGINEER.
SINGLE LINE DIAGRAM
SCALE NTS

SCHEDULE OF LOADS (200 AMP MAIN)


PANEL : ACPDB
ENCLOSURE : IP 55 W/ GROUNDING BAR; BOTTOM FEED
POWER SOURCE : 230V, 1-PHASE, 60Hz
LEGEND

CKT. CIRCUIT BREAKERS M KILOWATT HOUR METER


LOAD DESCRIPTION VOLTS_V LOAD_VA LOAD_AMP
NO. AT POLE WIRE SIZE GROUND SIZE CONDUIT Computation: MCB MAIN CIRCUIT BREAKER
1 RECTIFIER 1 230 16000 69.57 125 2P 2 - 35mm², THHN 1-25mm², THW 50.8mm Ø IMC Pipe(2"), or 50mm Ø PVC LOAD_AMP = LOAD_VA / LOAD_V MTS MANUAL TRANSFER SWITCH
DEMAND FACTOR (%) = 100 ACPDB AC PANEL DISTRIBUTION BOARD
2 RECTIFIER 2 230 16000 69.57 125 2P 2 - 35mm², THHN 1-25mm², THW 50.8mm Ø IMC Pipe(2"), or 50mm Ø PVC
TOTAL AMP = 148.71 A
3 Perimeter Light 230 400 1.74 20 2P 2 - 3.5mm², THHN - 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
PROTECTION AMP = TOTAL AMP * 1.25 = 185.89 A

4 C. OUTLETS 230 600 2.61 20 2P 2 - 3.5mm², THHN - 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC Feeder: SPD

5 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN - 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC 2-60mm² THHN (Black/Red)+ 1-30 mm² THHN GROUND (GREEN)
GROUND
IN 50 mmØ IMC or 50mm Ø PVC
6 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN - 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC

SPACE - - - - - - -
Protection: SERVICE ENTRANCE
7
200 AT, 2P, 230 V, 25 KAIC (EZD)
8 SPACE - - - - - - -

9 SPACE - - - - - - -

10 SPACE - - - - - - -

TOTAL LOAD 34200 148.71


LIGHTING

N
OB LIGHT

40.5 m

Reserved MW
Azi.=xx°

Proposed MW ANT information

NO. Item Azimuth(°) DOWN TILT(°) ANT Height Dimension ANT QTY FE CODE CONFIG.
1 MW ANT TBD TBD TBD TBD TBD TBD TBD
2 MW ANT
RESERVED FOR XXX m
MW ANTENNA 3 MW ANT
4 MW ANT
Reserved MW
Azi.=xx° 5 MW ANT
6 MW ANT
MW Platform Layout

MW IF CABLE,
CABLE TIE OR CLAMP, 0.8M/PCS Device list
Product Sub Product Configuration Quantity Unit Remark
MW IDU Rural IDU-3 1 PCS
ODU,MODEM and
MW 1+0(Normal) 1 Link
Accessories
0.6m SP
MW Antenna 1 Link
7/8/11/13/15/18/23G

ACPDB
PROPOSED
PROPOSED ACPDB
EQUIPMENT AT THE PLATFORM
PROPOSED
PEDESTAL MW
No. Main Equipment Quantity Remark BOQ for Access MW Implementation Service for PTO Project
Configuration
#60
缁勪欢
#60
缁勪欢

1 IDU NR8250 1 S/N Service Type Main Equipment Quantity Remark


#60
缁勪欢

PROPOSED
#59
#56
缁勪欢

#59
#56
缁勪欢

CHB FENCE
2 Antenna Normal 0.6m SP 1 Frequency
0m 1 Frequency hop 1
Scannin&survey
3 IF Cable 50m 1 Scanning&frequency
23G 1+0_0.6m 2 license service Frequency Application hop 1
4 ODU SRU(6G-23G) 1
Equipment Installation IDU、ODU、MODEM
PERSPECTIVE VIEW OPTICA(10GB 3 and Commissioning and accessories, 2 hop 1
A E/SINGLEMODE/1310NM/
SCALE NTS 5 1 1 Service Antennas,0.3m-0.6m
DIAGNOSIS,10km)

TELECOMMUNITY
PERIMETER
LIGHT

ALL THE INTERSECTIONS


MUST BE CONNECTED 40mm×4mm FB WELDING TO GATE ASIDE
THROUGH WELDING. POWER SERVICE ENTRANCE POST WITH
100mm TAIL WHICH END WITH ONE HOLE
DIA.8MM-10MM(INSIDE OF THE FENCE
PROPOSED DIRECTION)
4GT-42-340C :

:
缁勪欢

#69

#62
#67
#69
缁勪欢
缁勪欢

#69

#66
#65
#63
#68
#69
#73
#72
#71
#70
缁勪欢
缁勪欢#56缁勪欢#57缁勪欢#58缁勪欢#59缁勪欢#60缁勪欢#61
SEE TEST PIT
DETAIL

PERIMETER
LIGHT PERIMETER
LIGHT
COMPACTED
FILL

4 TYP
4

FB 40x4

FB 40x4 TYP
PERIMETER
LIGHT

L-BAR 50x50x5 TYP


L=2500
(SEE DETAIL A)
L-BAR 50x50x5

1 EARTHING & LIGHTING LAYOUT


SCALE : NTS

2 DETAIL A
SCALE : NTS

You might also like