This document is a statement of account for electricity provided to Maria Cristina Forde from May 26, 2023 to June 25, 2023. It shows her previous and current meter readings, the amount of electricity used in kilowatt-hours, and charges for supply, transmission, distribution, taxes, and subsidies. The total amount due by the due date of August 15, 2023 is ₱2,030.32.
This document is a statement of account for electricity provided to Maria Cristina Forde from May 26, 2023 to June 25, 2023. It shows her previous and current meter readings, the amount of electricity used in kilowatt-hours, and charges for supply, transmission, distribution, taxes, and subsidies. The total amount due by the due date of August 15, 2023 is ₱2,030.32.
This document is a statement of account for electricity provided to Maria Cristina Forde from May 26, 2023 to June 25, 2023. It shows her previous and current meter readings, the amount of electricity used in kilowatt-hours, and charges for supply, transmission, distribution, taxes, and subsidies. The total amount due by the due date of August 15, 2023 is ₱2,030.32.
Address : Unit 2812 Red Oak, Two Serendra High Rise 11th Street, Bonifacio Security Deposit : 3,573.86 Global City Taguig City, Billing Date : July 26, 2023 Period : 05/26/2023 to 06/25/2023 Due Date : August 15, 2023 To avoid disconnection, please pay on or before the due date Meter Number Date Read Previous Reading Present Reading Multiplier Total kWh 211426133 25-Jun-23 793.00 1,020.00 1 227.00
Power Factor Adjustment 90.12 PhP (10.50) % -9.46 Power Factor 100.00 % Special discount/Distrib Rate True Up 227.00 kWh P/kWh SUBSIDIES 14.66 Lifeline Rate Subsidy 227.00 kWh 0.06 P/kWh 14.64 Senior citizen subsidy 227.00 kWh 0.00 P/kWh 0.02 Tax Recovery Adj Charge (TRAC) 227.00 kWh P/kWh GOVERNMENT TAXES Local Franchise Tax 252.67 PhP 0.50 % 1.26 VALUE ADDED TAX 29.83 NPC GRAM/ICERA 6.58 % ILP Recovery 12.00 % GOUR 8.36 % Meralco 2nd GRAM % Prev Month Adj on Captive Gen cost % Transmission Charge 93.38 PhP 11.74 % 10.96 Systems Loss Charge 57.18 PhP 11.31 % 6.47 Distribution Revenue 86.02 PhP 12.00 % 10.32 Subsidies and Others 17.35 PhP 12.00 % 2.08 UNIVERSAL CHARGE 60.41 Missionary, NPC-SPUG & REDCI 227.00 kWh 0.22 P/kWh 50.69 Environmental Fund 227.00 kWh P/kWh NPC Stranded Contract Cost 227.00 kWh P/kWh NPC Stranded Debts 227.00 kWh 0.04 P/kWh 9.72 DU Stranded Contract Cost 227.00 kWh P/kWh Equalization of Taxes and Royalties 227.00 kWh P/kWh OTHER CHARGES 1.43 ACRM RECOVERY & Current RPT 227.00 kWh 0.01 P/kWh 1.43 ICERA 227.00 kWh P/kWh VAT SALES 253.93 VAT ZERO RATED VAT EXEMPT 60.41 VAT AMOUNT 29.83 TOTAL DU AMOUNT 344.17 Previous month Adjustment 227.00 kWh P/kWh FIT-ALL Renewable 227.00 kWh P/kWh TOTAL 2,098.92 Re-distribution Loss Recovery 227.00 kWh 0.44 P/kWh 99.88 Billing and Collection Recovery 1.00 account 59.50 P/account 59.50 Sub-Metering Cost Recovery 1.00 meter P/meter Transformers/Facilities Cost Recovery 10.87 kVA 4.59 P/kVA 49.89 RECOVERY
Other Expenses Recovery 227.00 kWh 0.95 P/kWh 215.65
Adjustments 227.00 kWh P/kWh SUBTOTAL BEFORE VAT 424.92 VAT SALES VAT EXEMPT 424.92 VAT AMOUNT TOTAL RECOVERY CHARGE 424.92 TOTAL CURRENT CHARGES 2,523.84 PREVIOUS OUSTANDING BALANCE 757.32 INTEREST ON PAST DUE BALANCE 0.00 PAYMENT AND CREDITS 0.00 TOTAL AMOUNT DUE 3,281.16 Payment received after the Statement cut-off ( 20th day of the month ) are not yet reflected on bill.