You are on page 1of 1

QPWD - Stage 1a Marine Hose Replacement

Civil / Structural Works


NGAA-3T - Rev. A
Project No.
WS2788510R Page 5 of 17

ASME B31.8 Gas Transmission and Distribution Piping Systems


ISO 13623 Petroleum and Natural Gas Industries - Pipeline
Transportation Systems
GP030604 Piping erection, flushing and cleaning,

GP031901 Vent, drains, flushing and cleaning connections

5.0 EQUIPMENT REQUIREMENT

SN EQUIPMENT DESCRIPTION QTY SPECIFICATION


1 Multi Stage Centrifugal Flush Pump 1 20 - 30BPM
2 Holding Tank 1 70BBLS
3 Equipment Basket C/W Hoses And Flowmeter 1

5.1 PERSONNEL REQUIREMENT

SN DESCRIPTION OF PERSONNEL QTY


1 Project Engineer 1
2 Supervisor 1
3 Equipment Operator 2
4 Assistant Equipment Operator 1
5 Rigger/Helper 1

6.0 RESPONSIBILITIES

6.1 Project Engineer


He supervises the deployment of various categories of workers to their respective
work areas; and monitors project activities. He also makes reports on: progress,
and difficulties, to the project manager. He briefs the site supervisors on
activities requirements.

6.2 Supervisor
5