AGREED

POINTS: 3.
Representatives:
2. 1.HGPTThe 4. 3. 2. I.Presents: Chaukitol
-Kamanc
Cordoba
Transmission
CircuitHetauda This
5, 4. Representatives: NEAThe Conductor.
3. 2. (Authorized
Mr. Mr. Mr. Mr. Mr. Mr.
managed be
Hetauda, The HetaudaHetauda DCS. possible.To
conditionPilluwa The Mr. meeting
NarendraAshok
Shutdown Sah Nabin Stringing NabinKedar Kiran Ganesh
Rajendra
from Contact facilitate Continuous Grid
Sah Sah,Kumar Kumar Kumar SDN was
DCS Project and Grid work will Representative Kumar Division.
Hetuada
DCS.by of from Koirala. Bir
crossing person the Project held
and maintenance Division be Mudbhary, Shrestha. BHD
Phuyal, Sah, Pandit,
Contractor
office. Shutdown,
will Shutdown
provided at
public be site TLUP, (HGPT.Hetauda the
for TLUP,
line planned Project Hetauda oflice
the Incharge holding Hetauda
notice is works. wil Pilluwa
Side
Shutdown as for Engineer Project the
required provide Project DCS, of
and stringing
by Incharge Grid contractor),
for and POA DCS Hetauda
MEETING
MINUTES OF
Manager (9.57km)
the executed the Division Transmission
two shall of Chief
Page interruption (if
Mr. and LDC work
any Technical coordinate HGPT) Grid
IshworBhattarai(9845567000)
1
of
Daily approval.in Malaysia
Line
LT of Chief Division.
1 such
lines works Circuit for Line
of Person with a 9851087188
986639863| 980202177|98437518469851|49244
9865409152
985506796|
power under way ContactNo. ContactNo. upgrading
regarding
NEA, No. Upgrading NEA,
shall
the that
which 132 for I
be On-Job LDC. the In & Hetauda
case 2 of the
kV Mr. line of
appears Hetauda 132 Shutdown
ACSR Project
line) Kedar can of on
and Field kV
untoreseen/emergency be Signature Signature Conductor
after shall and l6
Mr.Kumar Training Grid charged Hetauda of April
shutdown be Ganesh
provided Division 132 M/S 2023
Phuyal as Kamane -
of bykVHG
Kumar soon between
shall Double
TTTS Power
by and and