I. INSPECTION REPORT
III. QC REPORT
I. INSPECTION REPORT
Installation Box Socket Outlet Installation Box Socket Outlet & connection Cable
Directives and warnings Panel P-5-PX-200V-2~3 Testing for Megaom resistance = 628MΩ (OK)
Finish after installation MCCB- Connection Cable Finish directives and warnings Panel
Finish after installation MCCB- Connection Cable Finish directives and warnings Panel
Finish after installation Box socket outlet TAP machine Finish after installation Box socket outlet TAP machine
INSPECTION REPORT
Project Name CANON VIET NAM CO.,LTD QUE VO FACTORY
Area/Block MOLDING 05
Item: QV - POWER SUPPLY & AIR SUPPLY FOR NEW TAP MACHINE
Result OK
Install new air compressor pipe Install new air compressor pipe
TESTING INSULATION RESISTANCE (> 0.5MΩ) TESTING INSULATION RESISTANCE (> 0.5MΩ)
TESTING INSULATION RESISTANCE (> 0.5MΩ) TESTING INSULATION RESISTANCE (> 0.5MΩ)
TESTING INSULATION RESISTANCE (> 0.5MΩ) TESTING INSULATION RESISTANCE (> 0.5MΩ)
TESTING INSULATION RESISTANCE (> 0.5MΩ) TESTING INSULATION RESISTANCE (> 0.5MΩ)
TESTING INSULATION RESISTANCE (> 0.5MΩ) TESTING INSULATION RESISTANCE (> 0.5MΩ)
TESTING INSULATION RESISTANCE (> 0.5MΩ) TESTING INSULATION RESISTANCE (> 0.5MΩ)
III. QC REPORT
Project Name : POWER SUPPLY & AIR SUPPLY FOR NEW MACHINE TAP
Finish 11:30
Lê Sỹ Mân
Report by Lê Sỹ Mân
QC Internal inspection Report at Canon Que Vo, 16-Apr-2023
Location : MOLDING
Contents :
Action Taken:
Location : MOLDING
Contents :
Action Taken:
Location : MOLDING
Contents :
Action Taken:
Cleanning
Location :
Contents :
Action Taken: