SOLUTION TO PRACTICE PROBLEM

 Beds are made in 04 batches


 Available hours per week: 40 Hrs
 No of steps in the process: 9 steps

1. If only one worker is performing the total job for building bunk beds the capacity in beds
per week is as follows,

Total set up time: 130 Mints


Total run time per batch: 1,331.6 Mints
Total manufacturing time: 1,461.60 Mints per batch
No of hrs available per week: 2400 Mints (40*60)
No of batches per week: 1.64
No of beds per week: 6 Beds

Total time required to process a batch of 4 bunk beds is 1,461.60 Mints. Accordingly
following table shows the capacity of each process.

Step Set up time Run time per Capacity / Week


bed
Cut 15 37.5 165
Plane 10 38.4 164
Router 10 48 202
Drill 10 28 122
Sand 25 24 121
Stain 15 12 63
Polyurethane 45 90 405
Kit 0 40 160
Assembly
Cleating 0 15 60
Total 332.90 1,462