Given the needed tools and materials, you should be able to install a utility box based on
the layout plan and PEC requirements.

SUPPLIES/ MATERIALS:
Utility box, wood screws

EQUIPMENT:
Power drill, screwdrivers, spirit level, pull-push rule, marking tools

STEPS/ PROCEDURE:
1. Refer to the layout plan for the required measurements. Mark and lay out the height
dimension of the utility box using horizontal lines. Extend the horizontal line by using a
spirit level.
2. Make a vertical line to get the exact location of the utility box. Extend the marking
again. Use a level bar to ensure that the alignment is straight. The marking indicates
the location of the utility box.
3. Place the utility box on the marking. Make sure that the utility box is in the center of the
marking.
4. Mark all mounting holes provided in the utility box on the wiring board.
5. Fix the utility box with one (1) wood screw. Doing this ensures that the alignment is
straight or level.
6. Check the vertical and horizontal alignment. Then fix the utility box with the remaining
screws.
ASSESSMENT METHOD:
Demonstration, Performance Criteria Checklist
PERFORMANCE CRITERIA CHECKLIST

Name of Trainee:________________________________________________

During the performance of the activity did the trainees perform according to the required
criteria?

Criteria Yes No
Were you able to:
1. Measure the required height of the utility box as per the
working drawing
2. Mark all mounting holes
3. Mount and align the utility box on the wiring board
4. Fix the utility box as per job requirements and PEC
requirements
5. Wear proper PPE
6. Practice OHS
7. Perform 5S of good housekeeping
8. Submit the Share Link in the Submission Bin at the TOP
course?

For satisfactory achievement, all items should receive a yes response.