TASK SHEET

TITLE:​
Installing the Wire Gutter

PERFORMANCE OBJECTIVE:

Given the needed tools and materials, you should be able to install the wire gutter based
on the layout plan and in compliance with the PEC requirements.

SUPPLIES/ MATERIALS:
Wire gutter, wood screws

EQUIPMENT:
Power drill, screwdriver, level bar, pull-push rule

STEPS/ PROCEDURE:

1. Refer to the layout plan for the required measurements. Mark and layout the height
dimension of the wire gutter using horizontal lines. Extend the horizontal line using a
spirit level.
2. Make a vertical line to get the exact location of the wire gutter. Extend the marking
again. Make sure to use a level bar so that the alignment is straight. The marking
indicates the location of the wire gutter.
3. Mark all mounting holes provided in the wire gutter on the wiring board.
4. Fix the wire gutter with two wood screws. Doing so ensures that the alignment is
straight or level.
5. Check the vertical and horizontal alignment. Then fix the wire gutter with the remaining
screw.

ASSESSMENT METHOD:
Demonstration, Performance Criteria Checklist
PERFORMANCE CRITERIA CHECKLIST​

Name of Trainee:________________________________________________

During the performance of the activity did the trainees perform according to the required
criteria?

Criteria Yes No
Were you able to:
1. Measure the required height of the wire gutter as per the
the working drawing
2. Mark all mounting holes
3. Mount and align the wire gutter on the wiring board/wall
4. Fix the wire gutter as per job requirements and in compliance
with the PEC guidelines
5. Wear proper PPE
6. Practice OHS
7. Perform 5S of good housekeeping
8. Submit the Share Link in the Submission Bin at the TOP
course?

For satisfactory achievement, all items should receive a yes response.

Comment/s:

Name and Signature of Trainer