You are on page 1of 57

About Us

RAYASURVERINDO Tirtasarana was established in May 21st 1980, having 43 years


of experience in consultancy services within the various fields.

We are fully supported by professionals from vavious area of expertise.

We are committed to the provision of high quality professional consultancy


services to our client.

The firm is based in Bandung,


Address : Jl. Tubagus Ismail VIII No. 27 Bandung 40134 - Indonesia
Telephone no. : 62 - 22 - 2504343
Fax. : 62 - 22 - 2504343
E-mail : info@rysurverindo.com/rayasurverindo@gmail.com
Vision & Mission
To be the leading company in multi-discipline of engineering consultancy
service, as well as taking part in development of human lives by the application
of appropriate science, engineering and technology.

To satisfy our client’s requirements and needs using appropriate science,


technology and engineering method by considering social, economy and
environmental aspects for creating the best quality of consultancy services.
Scope of Services
• Risk Management
• Planning and Programming
• Pre-Feasibility Study
• Feasibility Study
• Survey, Investigation, D and testing
• Assesment (Review Design)
• Construction Supervision
• Project Management Unit (PMU)
• Evaluation of the Benefits
• Outline Bussiness Case (OBC)
• Final Bussiness Case (FBC)
Fields of Activity
• Pipeline
• Transportation (Marine, Railway and Land)
• Highway and Bridges
• Harbour and Port Facility
• Foundation and Structural Engineering
• Architecture and Landscape
• Water Resources Development
• Topographic and Mapping
• Geotechnical Engineering and Testing
• Offshore
• etc
Our Experts
NO QUALIFICATION NAME

Dr. Eng. ARIS ARYANTO, ST., MT


1 STRUCTURE ENGINEER
IDA I DEWA GEDE WIRAWIJAYA, ST., MT.
ARIS WIBOWO, ST., MT.
2 TRANSPORT ENGINEER AGUNG MUNGGARAN
TANTALIA SARI PRATIWI, ST., MT.
ATHANASIUS ADI, ST, MT.
3 CIVIL ENGINEER
PAULUS BENNY S, ST., MT.
4 SOIL ENGINEER RAHMATYAR FATIMATUZAHRO, ST., MT.
5 GEOLOGIST ENGINEER IR. BAMBANG IRAWAN
ACHMAD M.F., ST., MT
6 OCEAN ENGINEER MUHAMAD HANAFI ALRIN, ST., MT.
KENINDRA PRANINDYA, ST., MT.
7 ELECTRICAL ENGINEER IR. RIANTO MUCHARAM
Dr. Eng. ARIF SARWO WIBOWO, ST., MT
8 ARCHITECTURAL/LANDSCAPE
IR. SATRIO SETYAWAN
IR. EDDIE RUNTUWENE
SUDARMO
9 SUPERVISORY ENGINEER
KRIS DARMAWAN
YOSEPH VALENTINO SILALAHI, ST.
10 HEALTH SAFETY ENVIRONMENT RAHMAT DARAJAT
11 PLANNER ENGINEER DITA HADITSAH BUDIATI,ST
IR. UWEN SISWANDHI
12 GEODETIC ENGINEER SUDIRDJA, BE
M. NURMAN HIDAYAH, ST
13 LEGAL DANIEL TUNGGUL HABONARAN LUMBANRAJA, SH.
HASRI NIRMALA, SE.
14 ECONOMICS & FINANCIAL RATNA SARI,SE
DENDY RACHIM,SE
APPENDIX
COMPANY EXPERIENCES
COMPANY EXPERIENCES
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
NATIONAL STRATEGIC PROGRAM (PSN)
Consulting Services for Design, Supervision of all related construction works;
and Supervision of Port Related November 5, 2018 - monthly progress reporting; material approval;
Supervision of All Port Facility Ministry of
1 Facilities Development) November 8, 2024 quality control, and assurance; schedule Patimban, West Java
Construction Transportation
Patimban Port Development (ONGOING) planning, and controlling; shop drawing, and
Project (I) Loan JICA No.IP-577 technical specification review
BIM is used in strategic projects in 1. Preliminary Documents
Indonesia to support technological 2. Modeling BIM LOD 350
advances in the construction sector. 3. 4D BIM Modeling
Construction Consultancy
The application of BIM is very 4. 5D BIM Modeling
Services Implementation
January 25 2023 – important to be developed in Indonesia 5. Visualization Ministry of
2 Building Modeling (BIM) Project Patimban, West Java
Mei 25, 2023 because it can simplify and speed up 6. CDE coordination Transportation
Detail Engineering Detail (DED)
the work process on projects. One of
Access Toll Road Patimban
the advantages of BIM is the
integration of information from various
disciplines in one 3D modeling.
a. 47 points of deep boring with a maximum
depth 40 m or NSPT > 50 3 times in a row;
The objective of soil investigation is to b. SPT test has to be carried out at intervals
obtain more information about the of 1 m so that the soil hardness from the
condition and characteristics of soil surface until the end of the boring can be
layers. Soil investigation results will be identified; Karang Tanjung, Tegal
used for purposes of input to the c. Soil sample will be taken by 4 sample/ Ministry of Panjang, Krajan,
analysis/design of construction works points; Transportation Kertajaya Bongas
Soil Investigation Of Patimban April 2022 – mainly on sub-structure. The main d. Laboratory tests will be conduct to (Kantor Jejerukan, Bojong
2 Access Tol Road September 2022 target to be achieved is to obtain determine the Index and Engineering Kesyahbandaran dan Curug, Tambakk
information on soil parameters required Properties of soil samples. If the sample Otoritas Pelabuhan Dahan, &
by the consultant to design the identified as clayey soil, then to determine Kelas II Patimban) Pusakanegara, West
construction of the foundation and soil the shear strength test will be conducted Java
improvement, which is technically the triaxial UU. Meanwhile, when the sample
most suitable to the characteristics and identified as sandy, will be tested by direct
strength of soils at each location shear test. Consolidation test will be
conducted on clay soil conditions in the
field are always submerged.
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
As assistance and a policy basis for KSOP
Patimban in preparing and implementing
management in the form of port facilities and
Project Management Unit (PMU) Provide assistance and assistance to services as mandated by the Minister of Ministry of
KSOP Class II Patimban to make Transportation
Study on The Implementation of October 2022 – policies related to the management of Transportation Regulation No. 50 of 2021 (Kantor
3 Patimban Port Asset concerning the management of seaports. As Patimban, West Java
Development and Cooperation Desember 2022 the main facilities and supporting well as the implementation of utilization Kesyahbandaran dan
facilities of Patimban Port, including the Otoritas Pelabuhan
Project backup area cooperation related to several port facilities and Kelas II Patimban)
services with port business entities that are
regulated by applicable regulations regarding
utilization cooperation,
a. updating the results of the pre-FS study in
order to fulfill the readiness and bankability
of the Patimban Port Project, including
revisions to the results of the study in
accordance with the evaluation results from
the Ministry of National Development
Planning/Bappenas (if necessary);
b. Prepare the completeness of the
documents that will be used to achieve the
feasibility and bankability of the Patimban
Port Project, including taking into account
The purpose of this work is to prepare input from confirming market interest;
c. communicating and coordinating
a bankable structure and document for intensively with the Infrastructure Guaranty
the Patimban Port Project so that it can
Assistance in Government be auctioned based on laws and Business Entity (if a guarantee is required),
including its consultants and related
4 Cooperation Project February 2021 – regulations regarding PPP and other parties, in the process of obtaining an Ministry of Patimban, West Java
Transactions with Patimban Port November 2021 relevant regulations in force in Transportation
Business Entities Indonesia, as well as assist the GCA in infrastructure guarantee;
d. Assistance to the PJPK or other
preparing and carrying out the stakeholders in obtaining other necessary
transaction process for the Patimban
Port Business Entity. approvals or permits, including the
preparation of the necessary documents or
regulations;
e. assessing the involvement of other parties
with an interest in the Patimban Port
Project, including the structure of the
project, with the aim of maximizing the
contribution of the parties to the feasibility
and bankability of the project;
f. management of transaction processes and
preparation of transaction documents for
the Patimban Port Project, including
procurement documents and draft
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
cooperation agreements; andg. assistance
until the Patimban Port Project achieves
financing
 Review, and complete the final of the FBC Ministry of
5 Port of Patimban, technical March 2020 - Technical Assitance for transaction report Transportation Patimban West Java
assistance for PPP transactions. December 2020 Phase  Prepare PQ dan RFP document (Directorate General of
 Prepare a Draft Contract Agreement Sea Transport)
a. Preparation Stage
b. Data Collection
c. Need Analysis
d. Compliance Criteria
e. Criteria for Determining Value for Money in
PPP Project
f. Life Cycle Cost Analysis
g. Analysis of optimization of dam function Ministry of National
and potential income and project financing
Study Implementation of Public a. Dam Management Issues schemes Development BBWS Citarum, BBWS
Private Partnership (PPP) for b. Dam Safety and Organization Planning/National Cimanuk (Bandung)
Dam Management Based on Life February 2020 – c. Identify key stakeholders and their h. Public Consultation Development Planning Cisanggarung
6 i. Conduct Advance Analysis
Cycle Cost of Dam, Loan IBRD June 2020 role in the process j. Final Completion Stage Agency (BAPPENAS) (Cirebon), BWS NT I
No. 8711-ID and AIIB 000010- d. Life Cycle Cost Analysis Directorate of Water (Mataram), Mesuji
1IND e. 5. PPP and PBC Approach 1. Recommendation for form of PPP Resources and Sekampung (Lampung)
2. Recommendation of the main criteria in
selecting a business entity Irrigation
3. Planned schedule for PPP preparation
and transaction activities.
4. Based on the resume of the work,
provide a National Dam Management
Strategy using PPP Scheme and
preparation of a related regulatory
framework development
Prepare the document for Private Partnership
Program in Patimban Port to qualify the
Study Implementation Private Concession study for Patimban Port
7 Partnership Program in 22 June 2017- 18 Operators, and Backup Area Business standards, and regulations, Comprehensive Ministry of Patimban, West Java
December 2017 Backup Area business plan, and regulations, Transportation
Patimban Port (OBC & FBC) Plan Performing concession study to choose the
suitable port operator in Patimban Port
to obtain an overview of the demand
Survey Investigation, and Design
conditions, services, and infrastructure needs
(SID) Port, and Master Plan of
07 March – 04 Detailed design of the construction of of Port Simanindo at KSPN Lake Toba North Ministry of
8 Simanindo Port Development in North Sumatera
July 2017 Lakeport. Sumatra. Concept of Simanindo Port Transportation
National Strategic Area of Lake,
Development at KSPN Lake Toba Sumatera
North Sumatera
Utara in the short, and medium term.
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Performing analysis of Port Infrastructure
Facilities master plan, Safety Sailing Study,
Anchorage, and Ocean Water Utilities,
Transportation Analysis including inter modes
Masterplan on Patimban New Port as
Master Plan Of Patimban Port 01 July 2016 – 27 transportation, and land transportation back up Ministry of
9 supporting facilities for Western Java Patimban, West Java
West Java Province December 2016 such as Railway, and Short Sea Shipping, Transportation
area industrial development.
social, economic, and environmental impact;
financial; technical aspects, and legal aspects.
Also providing field surveys that are related to
all the aspects above.
Performing analysis including started
preference analysis for demand forecasting;
Pre-feasibility study (Pre FS), Developing the Pre-Feasibility, and
transshipment analysis in port planning; social,
and Feasibility Study (FS) The 31 July 2015 – 28 Feasibility Study on New International Ministry of
10 economic, and environmental impact; financial; West Java
development of the new port on December 2015 Port in Northern West Java Coastline Transportation
technical aspects, and legal aspects. Also
the northern coast of west java as an Extension of Tanjung Priok Port.
providing field surveys which are related to all
the aspects above.

CONCES SIO N
a. Study of Legal, and Institutional Aspects
Review of Technical Aspects
b. Study of Economic, and Commercial
Analyze potential forms of cooperation
Feasibility Aspects.
Feasibility Study (FS) that can be carried out for Ports
c. Business Plan Review. Study of Value For
Concession documents as well December 2022 – cooperation, assess the feasibility of PT. RANJI KARYA Mahakam Block, East
1 Money (Vfm) Fsf Documents. Study of
as preparation of Draft Port March 2023 PPP collaboration with Business SAMUDERA Kalimantan Province
Environmental, and Social Aspects
Terminal Concession Contracts Entities, and prepare transaction
d. Study on the Form of Cooperation in the
documents
Provision of Infrastructure. Assessment of
Government Support Needs, and/or
Government Guarantees
Project Management Unit (PMU) 1.Inventory, monitor, and evaluate systems and
Assist the implement a management SmAY 17oro Kempo
on the Implementation of Special procedures in monitoring and reporting. Ministry of
system in terms of Monitoring and Port, Labuhan Haji
Allocation Fund (DAK) Activities May 17, 2022 – 2.Take inventory of problems that exist in the Transportation
2 Evaluation of the Management of the Port, Tawun Port,
for Fiscal Year 2022 Water December 7, 2022 implementation of Monitoring and Reporting. (Directorate General of
Physical Special Allocation Fund (DAK) Labuhan Aji Pier, Moyo
Transportation Sub-Sector 3.Collect action program reports for each Sea Transport)
for the 2022 Fiscal Year. Island
Marine Transportation monitoring and reporting preparation activity.
Feasibility Study Of New Port January 27, 2022 – Efforts to accelerate the development of Palembang, and South
3 Feasibility Study PT. Surveyor Indonesia
Palembang, Tanjung Carat Port June 30, 2022 seaports in Tanjung carat, new Palembang, Sumatra
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
south Sumatra. The planned development of
seaports Palembang new primarily targeted to
be able to provide support to activities in an
optimum. national logistics
Services include:
 conduct concession's FS
 presenting the FS result
Feasibility Study Of Nipah STS  provides facilitation to BPKP/ Inspector
April 25, 2022 – July Special Terminal Port concession's PT. Pelabuhan Batam, Riau Islands
4 (Ship To Ship Transfer) Council
13, 2022 conversion to Public Terminal Port Indonesia Province
Concession  provides contract arrangement facilitation

To convert Special Terminal Port to Public


Terminal Port through concession
Services include:
 conduct concessions FS
 presenting the FS result
Feasibility Study Of Muara  provides facilitation to BPKP/ Inspector
May 27, 2022 –July Special Terminal Port concession's PT. Pelabuhan Muara Southeast Sulawesi
5 Sampara Terminal Port Council
16, 2022 conversion to Public Terminal Port Sampara Province
Concession  provides contract arrangement facilitation

To convert Special Terminal Port to Public


Terminal Port through concession
Services include:
 conduct concession's FS
 presenting the FS result
 provides facilitation to BPKP/ Inspector
Feasibility Study Of BPP June 12, 2022 – Special Terminal Port concession's PT. Borneo Paser
6 Council East Kalimantan
Terminal Port Concession December 12, 2022 conversion to Public Terminal Port Petanggis
 provides contract arrangement facilitation

To convert Special Terminal Port to Public


Terminal Port through concession
Preparation of Pre-Feasibility Analyze potential forms of cooperation 1) Pre-Feasibility Study (Pre-FS)
Study (Pre-FS) Concession and that can be carried out for Ports Concession includes: Prupuk Village, Batu
Feasibility Study (FS) July 2022 – October cooperation, assess the feasibility of a. Strategic Aspects Study Review of PT. Borneo Paser Engau District, Paser
7
Concession documents as well 2022 PPP collaboration with Business Technical Aspects Petanggis Regency, East
as preparation of Draft Port Entities, and prepare transaction b. Study of Economic, and Financial Kalimantan Province
Terminal Concession Contracts documents Feasibility Aspects. Study of
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Environmental, and Social Aspects
c. Study on the Form of Cooperation in
the Provision of Infrastructure.
Assessment of Government Support
Needs, and/or Government Guarantees
the survey, and Provision of Technical
Data
2) Feasibility Study (FS) Concession
includes:
e. Study of Legal, and Institutional
Aspects Review of Technical Aspects
f. Study of Economic, and Commercial
Feasibility Aspects.
g. Business Plan Review. Study of Value
For Money (Vfm) Fsf Documents.
Study of Environmental, and Social
Aspects
h. Study on the Form of Cooperation in
the Provision of Infrastructure.
Assessment of Government Support
Needs, and/or Government Guarantees
1) Pre-Feasibility Study (Pre-FS)
Concession includes:
a. Strategic Aspects Study Review of
Technical Aspects
b. Study of Economic, and Financial
Feasibility Aspects. Study of
Analyze potential forms of cooperation
Preparation of Pre-Feasibility Environmental, and Social Aspects
that can be carried out for Ports
Study (Pre-FS), and Feasibility c. Study on the Form of Cooperation in
cooperation, assess the feasibility of PT KAWASAN
8 Study (FS) Terminal April 2020 - July 2020 the Provision of Infrastructure. Dumai, Riau Province
PPP collaboration with Business INDUSTRI DUMAI
Concessions for Dumai Industrial Assessment of Government Support
Entities, and prepare transaction
Estate (KID) Needs, and/or Government Guarantees
documents
the survey, and Provision of Technical
Data
2) Feasibility Study (FS) Concession
includes:
a. Study of Legal, and Institutional
Aspects Review of Technical Aspects
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
b. Study of Economic, and Commercial
Feasibility Aspects.
c. Business Plan Review. Study of Value
For Money (Vfm) Fsf Documents.
Study of Environmental, and Social
Aspects
d. Study on the Form of Cooperation in
the Provision of Infrastructure.
Assessment of Government Support
Needs, and/or Government Guarantees
Ministry of
Review Maspion pre-fs, and fs document
September 16, 2020 Project management Unit for Maspion Transportation
9 PMU for Maspion Special Port reports submitted to DGST from legal, technic, Gresik, East Java
– November 16, 2020 special terminal. (Directorate General of
and financial aspects.
Sea Transport
1. The consultant team developed a work plan,
and study approach method in the required
formats in terms of data collection, and
The purpose of the preparation of analysis;
Makassar New Port Concession in 2. The consultant team collects primary and
South Sulawesi, and Kendari New Port secondary data;
Consultancy Assistance Services in Southeast Sulawesi is to evaluate 3. The Consultant evaluates the Concession
Makassar New Port in
for Makassar New Port each stage of the concession so that plan;
October 6, 2020 – Ministry of South Sulawesi, and
10 Concession in South Sulawesi, each stage can be carried out 4. Consultants assist in the implementation of
November 6, 2020 Transportation Kendari New Port in
and Kendari New Port in correctly, quickly, maintain concessions;
Southeast Sulawesi
Southeast Sulawesi independence, and be able to meet the 5. To be able to provide an objective
principles of implementing cooperation assessment, the consultant may conduct a
projects or concessions in the port survey input from the local Port Operator
sector. and related agencies;
6. Reporting the implementation of activities
regularly according to the progress of the
work.
Analyze potential forms of cooperation 1) Pre-Feasibility Study (Pre-FS)
Preparation of Pre-Feasibility that can be carried out for Ports Concession includes:
Study (Pre-FS), Feasibility Study September 2020 – cooperation assess the feasibility of a. Strategic Aspects Study Review of Satui,Banjarmasin,
11 PT BINA INDO RAYA
(FS), and contract drafting of December 2020 PPP to collaborate with Business Technical Aspects South Borneo
Terminal Concession for PT. BIR Entities, and prepare transaction b. Study of Economic, and Financial
documents Feasibility Aspects.
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
c. Study of Environmental, and Social
Aspects
d. Study on the Form of Cooperation in
the Provision of Infrastructure.
Assessment of Government Support
Needs, and/or Government
Guarantees. Survey, and Provision of
Technical Data
2) Feasibility Study (FS) Concession
includes:
a. Study of Legal, and Institutional
Aspects Review of Technical Aspects
b. Study of Economic, and Commercial
Feasibility Aspects. Business Plan
Review. Study of Value For Money
(Vfm) Fsf Documents.
c. Study of Environmental, and Social
Aspects
d. Study on the Form of Cooperation in
the Provision of Infrastructure.
Assessment of Government Support
Needs, and/or Government Guarantees
e. Drafting Contract Agreement
f. Technical Assistance
1. Technical Feasibility Study (FS)
includes:
a. Topographic, and Hydro-
Consulting Services for Oceanographic Surveys (Currents,
Preparation of Technical Preparation of Technical Feasibility Tides, Depth, Wave Modeling);
Feasibility Study (FS) Study (FS) Technical, and Concession b. Spatial aspects analysis;
PT. PELABUHAN
Documents, and Preparation of August 9, 2019 – for Mundam terminal Preparation of c. Economic Feasibility Analysis of Study
12 MUNDAM Dumai, Riau Province
Feasibility Study Documents October 9, 2019 Technical Feasibility Study (FS) Areas;
SEJAHTERA
(FS) of Mundam Terminal Technical, and Concession for d. Financial Feasibility Analysis of Study
Concession Location in Dumai, Mundam terminal Areas;
Riau Province e. Environmental Feasibility Analysis;
f. Analysis of economic growth, and
social development of the local area;
g. Intra, and intermodal cohesiveness
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
analysis;
h. Analysis Availability of hinterland;
i. Cruise security, and safety analysis;
j. Defense, and Security Analysis.
2. Feasibility Study (FS) Concession
includes:
a. Legal, and Institutional Study;
b. Technical Study;
c. Economic, and Commercial Studies;
d. Environmental, and Social Studies;
e. Study on the form of cooperation;
f. Study of Government Support Needs
1) Pre-Feasibility Study (Pre-FS)
Concession includes:
a. Strategic Aspects Study Review of
Technical Aspects
b. Study of Economic, and Financial
Feasibility Aspects. Study of
Environmental, and Social Aspects.
c. Study on the Form of Cooperation in
Provision of Infrastructure. Assessment
of Government Support Needs, and /
Government Guarantees
Analyze potential forms of cooperation
d. Survey, and Provision of Technical
Preparation of Pre-Feasibility that can be carried out for Ports
Data
Study (Pre-FS), and Feasibility cooperation, assess the feasibility of
13 April 2019 2) Feasibility Study (FS) Concession PT BTA Siak, Riau Province
Study (FS) Terminal PPP to be collaborated with Business
includes:
Concessions for Maredan Entities, and prepare transaction
a. Study of Legal, and Institutional
documents
Aspects Review of Technical Aspects
b. Study of Economic, and Commercial
Feasibility Aspects.
c. Business Plan Review. Study of Value
For Money (Vfm) Fsf Documents.
d. Study of Environmental, and Social
Aspects
e. Study on the Form of Cooperation in
Provision of Infrastructure. Assessment
of Government Support Needs, and/or
Government Guarantees
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Pre-Feasibility Study (Pre-FS) Concession
includes:
a. Strategic Aspects Study Review of
Technical Aspects
Analyze potential forms of cooperation b. Study of Economic, and Financial
that can be carried out for Ports Feasibility Aspects.
Preparation of Pre-Feasibility cooperation, and assess the feasibility c. Study of Environmental, and Social
14 April 2019 PT BTA Siak, Riau Province
Study (Pre-FS) for Sungai Duku of PPP to be collaborated with Aspects.
Business Entities, and prepare d. Study on the Form of Cooperation in
transaction documents Provision of Infrastructure.
e. Assessment of Government Support
Needs, and / Government.
f. Guarantees. The survey, and Provision of
Technical Data.

PPP PROJECT
1.Assistance to GCA in the process of financial
close by BUP to PPPs that have completed
transactions;
2.Assistance to the GCA and the Control Team
in implementing the PPP Agreement control,
including providing input, review, and
evaluation of the Control Documents
As an evaluation and/or monitoring at
prepared by the Control Team and the
each stage of the PPP, both those that
processes and stages by the PPP
have carried out the transaction phase
agreement on the PPP that has completed Ministry of
Assistance in the Implementation and those that have just been
the transaction; Transportation
of Government Cooperation with May 20, 2022 – proposed by the Business Entity so
1 3.Assistance to the GCcanPPP stage whose (Central Port Function -
Business Entities (PPP) in the December 30, 2022 that each stage can be carried out
studies are prepared by agencies outside the Improvement Work
Port Sector properly, quickly, maintains
GCA, including providing input, reviewing Unit)
independence and can fulfill the
and evaluating the PPP process and/or
principles of implementing cooperation
planning documents that have been
projects in the port sector.
prepared;
4.Management of the implementation of the
PPP agreement that has been implemented,
including schedule arrangements and quality
control of each stage in the PPP agreement;
5.Assistance to GCAs or other stakeholders in
obtaining other necessary approvals or
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
permits, including the preparation of the
necessary documents or regulations.
6.Communicating and coordinating intensively
with GCA, Control Team, Implementing
Business Entity, consultants and related
parties in every stage of the port sector PPP.
 Need Analysis, Certainty that the PPP has
The main objective of this activity is to a technical, and economic rationale based
PT. Penjaminan
examine the potential implementation on the analysis of available secondary data
Infrasttuktur Indonesia
Consulting services for Tanjung April 16- Mei 16, of the Public Private Partnership (PPP)  Projected sustainable demand for the
2 (Persero) / Indonesian Palembang
Carat Port Sector Studies 2021 scheme in the Tanjung Carat Port Project Economic Area, and measured by
Infrastructure
project which will be outlined in the the inadequacy of services, both in
Guarantee Fund
form of a PPP Preliminary Study. quantity, and quality, based on the analysis
of available secondary data.
 Life Cycle Cost Analysis
 Alternative Dam Optimization Function
 Feasibility Analysis Optimization of Dam Ministry Of National
Study Implementation of Public-
Function Development Planning/
Private Partnership for Dam Analyze the potential forms of possible
 Institutional Analysis for Optimizing Dam National Development Batutegi, Kedung
3 Management Based on Life 2020 cooperation that can be carried out for
Functions Planning Agency Ombo, Bali dan pengga
Cycle Cost of Dam dam management
 Development of a PPP scheme related to Republic of Indonesia
Dam management (BAPPENAS)
 Development of PPP funding scheme, and
funding sources.
 Review, and complete the final of the FBC
DGST
Port of Patimban, technical March 2020 - Technical Assitance for transaction report
4 (Directorate General of Patimban
assistance for PPP transactions. December 2020 Phase  Prepare PQ dan RFP document
Sea Transport)
 Prepare a Draft Contract Agreement
Port of Murhum Baubau, FBC &  Finalization FBC document DGST
April 2020 – Bau-Bau, Southeast
5 Technical assistance for  Technical Assitance for preparing Review, and complete the final FBC report (Directorate General of
December 2020 Sulawesi Province
transaction transaction Phase Sea Transport)
Airport of Kediri & Labuan Bajo,  Contract Review for Bajo  Review of Bajo demand DGCA
Oktober-December  Labuan Bajo, NTT
6 technical assistance &  Technical Assitance for preparing  Review of Bajo contract (Directorate General of
2020  Kediri, East Java
transaction for PPP (KPBU) transaction Phase (Unsolicited)  Review of FBC document for Kediri Civil Aviation)
Port of Bitung, prefs for PPP February – April, Analyze the potential of Bitung port  Collecting data DGST
7 North Sulawesi
unsolicited, 2019  Demand, Finacial & Legal Analisys (Directorate General of
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Sea Transport)
Prepare the document for Private Partnership
Program in Anggrek Port to qualify the DGST (Directorate
Port of Anggrek, PPP October-December
8 Capture initial picture of Anggrek Port standards, and regulations, and regulations, General of Sea North Sulawesi
prelimanary study 2018
Performing PPP study to choose the suitable Transport)
port operator in Anggrek Port
Prepare the document for Private Partnership
Program in Kaimana & Serui Port to qualify
DGST (Directorate
Port of Kaimana & Serui , OBC Agustus-December Analyze the potential of Kaimana & the standards, and regulations, and
9 General of Sea Papua
study 2018 Serui port regulations, Performing PPP study to choose
Transport)
the suitable port operator in Kaimana & Serui
Port
Prepare the document for Private Partnership
Program in Dobo & Pomako Port to qualify
Analyze the potential of Dobo & DGST (Directorate
Port of dobo & pomako, OBC Agustus-December the standards, and regulations, and
10 Pomako port General of Sea Molucas
study 2018 regulations, Performing PPP study to choose
Transport)
the suitable port operator in Dobo & Pomako
Port
Prepare the document for Private Partnership
Program in Patimban Port to qualify the
DGST (Directorate
Port of Patimban, PPP OBC & 22 June 2017- 18 standards, and regulations, Comprehensive Patimban, Subang,
11 Study OBC & FBC General of Sea
FBC December 2017 Backup Area business plan, and regulations, West Java
Transport)
Performing PPP study to choose the suitable
port operator in Patimban Port
A study to develop guidance for
government in dredging work
Performing market study, technical analysis,
Study Implementation of concession. This study considering
19 June – 26 October legal analysis, economic, and financial Ministry of
12 concession (PPP) for land, and some aspects such as regulation, North Sumatera
2015 analysis, as well as several related field Transportation
building for third party operation, and availability of dredging
studies.
vessels, and business aspects from
dredging work.
Develop standard output documents to 1. Reviewing regulations related to the State
Employment of Consultancy
accelerate the process of submitting Budget, and PPP inside planning, and Ministry Of National
Services in the Preparation of
budgets for allocation of PPP budgeting system; Development Planning/
Standard Documents for Sector October 8, 2018 -
13 implementation, this study also 2. Analyze synchronization of government National Development Indonesia
Cooperation between December 31, 2018
produces a web-based database budget schedules, and submission of Planning Agency
Government, and Business
development system so that it can real- budget for APBN, and PPP allocations; Republic of Indonesia
Entities (PPP)
time analyze the feasibility of projects 3. Identify documents needed in submission
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
to be carried out in PPP. the government budget;
4. Identify the document load in accordance
with the regulations apply;
5. Compile the standard sector documents
needed for government budget
submission;, and Develop a standard
document web-based database system
needed for government budget
submissions

INTERNATIONAL HUB PORT


Performing analysis including structural, and
geotechnical analysis of the infrastructure;
Survey Investigation, and Design Detailing, and Design of Port numerical model on hydrodinamic, wave
26 April 2016 – 24 Ministry of Bitung, North Sulawesi
1 (SID) Port Facilities Special Infrastructure Facilities in Bitung transformation; sedimentation analysis; water
October 2016 Transportation Province
Economic Bitung Zone International Hub quality model; wave-current coupled model.
Also providing field surveys which are related
to all the aspects above.
Revision Masterplaning on Port Performing analysis including intermodes
Infrastructure Facilities, Safety Sailing transportation, and masterplaning; sailing
Study, Anchorage, and Ocean Water safety study; social, economic, and
Revision Master Plan of kuala 10 August 2015 - Belawan North
2 Utilities, Transportation Analysis, Land environmental impact; financial; technical PT. PELINDO I
Tanjung Port 25 December 2015 Sumatera
Trsnportation Backup, Benefit on aspects;, and legal aspects. Also providing field
Socio-Economic Impact, Environmental surveys which are related to all the aspects
Impact, and Legal Aspects above.
Performing analysis including stated
preference analysis for demand forecasting;
Study on the feasibility of Kuala transhipment analysis in port planning; social,
Development Study of Kuala 29 August 2014 - Ministry of
3 Tanjung port’s development as economic, and environmental impact; financial; North Sumatra
Tanjung Port 26 December 2014 Transportation
International Hub in Indonesia technical aspects;, and legal aspects. Also
providing field surveys which are related to all
the aspects above.
Revision Masterplaning on Port Performing analysis including intermodes
Infrastructure Facilities, Safety Sailing transportation, and masterplaning; sailing
Revision Master Plan of kuala 10 August 2015 - Study, Anchorage, and Ocean Water safety study; social, economic, and Belawan North
4 PT. PELINDO I
Tanjung Port 25 December 2015 Utilities, Transportation Analysis, Land environmental impact; financial; technical Sumatera
Trsnportation Backup, Benefit on aspects;, and legal aspects. Also providing field
Socio-Economic Impact, Environmental surveys which are related to all the aspects
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Impact, and Legal Aspects above.

PRIMARY HUB PORT


Prepare the document for Private Partnership
Study Implementation Private Concession study for Patimban Port Program in Patimban Port to qualify the
standards, and regulations, Comprehensive Ministry of
1 Partnership Program in 22 June 2017 Operators, and Backup Area Business Backup Area business plan, and regulations, Transportation Patimban, West Java
Patimban Port (OBC & FBC) Plan
Performing concession study to choose the
suitable port operator in Patimban Port
Performing analysis including stated
Pre-feasibility study (Pre FS), Developing the Pre-Feasibility, and preference analysis for demand forecasting;
transhipment analysis in port planning; social,
and Feasibility Study (FS) The 31 July 2015 – 28 Feasibility Study on New International economic, and environmental impact; financial; Ministry of West Java
2 development of new port in the December 2015 Port in Northern West Java Coastline Transportation
northern coast of west java as an Extension of Tanjung Priok Port. technical aspects;, and legal aspects. Also
providing field surveys which are related to all
the aspects above.
Performing analysis of Port Infrastructure
Facilities master plan, Safety Sailing Study,
Anchorage, and Ocean Water Utilities,
Transportation Analysis including intermodes
Masterplan on Patimban New Port as
3 Master Plan Of Patimban Port 01 July 2016 – 27 supporting facilities for Western Java transportation, and land transportation back up Ministry of Patimban, West Java
West Java Province December 2016 such as Railway, and Short Sea Shipping, Transportation
area industrial development. social, economic, and environmental impact;
financial; technical aspects;, and legal aspects.
Also providing field surveys which are related
to all the aspects above.
Performing analysis including stated
preference analysis for demand forecasting;
Developing the Feasibility Study on a transhipment analysis in port planning; social, Department of
Feasibility Study (FS) of August 2005 – Kabupaten Karawang,
4 Cilamaya Port December 2005 new developed port in the West part of economic, and environmental impact; financial; Transportation West West Java Province
Indonesia technical aspects;, and legal aspects. Also Java
providing field surveys which are related to all
the aspects above.
Revision Masterplaning on Port Performing analysis including intermodes
Infrastructure Facilities, Safety Sailing transportation, and masterplaning; sailing
Study, Anchorage, and Ocean Water safety study; social, economic, and
Revision Master Plan of Belawan 12 April 2016 – 11 Belawan North
5 Port June 2016 Utilities, Transportation Analysis, Land environmental impact; financial; technical PT. PELINDO I Sumatera
Trsnportation Backup, Benefit on aspects;, and legal aspects. Also providing field
Socio-Economic Impact, Environmental surveys which are related to all the aspects
Impact, and Legal Aspects above.
NATIONAL PORT AND OTHERS
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Supervision of all related construction works;
Consultancy Services Work,
Supervision of Heavy Repair of Supervision of Port Landside Facility monthly progress reporting; material approval; PT. PELABUHAN Belinyu, Bangka
1 Jan 2021 – Oct 2022 quality control, and assurance; schedule
Belinyu Pier, and Completion of Construction planning, and controlling; shop drawing, and INDONESIA (Persero) Belitung Province
Phase I Pier Construction
technical specification review
1.density of seaport transportation
infrastructure, river, and lake crossing ports,
fishing ports, tourism ports, Special
Terminals (Tersus)/Terminals for Own
Interests (TUKS), and other ports in the
study area.
2.selection of transportation infrastructure for
to determine priority locaCollectport prospective locations for seaport plans in the
development plans in regencies/cities
Pre-Feasibility Study Work (Pre- that are feasible based on spatial, study area. Ministry of
3.Evaluating the proposed location for seaports
Fs) for Seaport Development at May 31, 2022 – transportation, social, economic, land in the study area. Transportation
2 Kep Regency Location. Sula October 07, 2022 status, environmental, and technical (Directorate General of
Province of North Maluku aspects of ports that are adjusted to 4.Determine priority locations for seaport Sea Transportation)
infrastructure development.
existing policies, both from the central 5.Knowing the description of the real needs for
government and regional governments
the construction of a new port in a certain
area based on consideration,n of economic,
social, and technical aspects so that the
recommendations for the most appropriate
indications in that area can be optimally
continued for Feasibility Study activities and
so on.
1. Secondary data inventory
2. Preparation of instruments and work
implementation methods to be used in
to evaluate the benefits of the results learning.
3. Preparation of materials needed for the
of the development of sea preparation of data collection.
transportation infrastructure that has
Work Evaluation Study of the been carried out by the Directorate 4. Secondary and primary data collection
through documentation studies, initial field Ministry of
Benefit of Development of May 27, 2022 – General of Sea Transportation, as well surveys, and follow-up surveys with Transportation East Seram Regency,
3 SeaTransportation Infrastructure as to address problems with port
for the Location of the Port of November 27, 2022 utilization that have not/been optimal, questionnaires and interviews. (Directorate General of Maluku Province
5. Desk Study contextual strengthening and Sea Transportation)
Mediterania, as well as devise alternative solutions sharpening that is relevant to the
to existing problems, so that they can
be used for further planning and substance study and the analytical method
used.
development programs 6. Preliminary analysis of regional
characteristics.
7. Follow-up analysis of the evaluation of the
benefits of port infrastructure development
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
that has been identified.

1.as a reference in carrying out the 1.Data collection


handling of Tanjung Buton Port so 2.Data analysis
that existing development activities 3.Building and Development Plan
can be optimal in port operations to 4.Preparation of Port Master Plans (RIP), Work
ensure the safety of cruise ships. Environment Areas (DLKr), and Port Interest
2.Provide limits on the operation of Areas (DLKp)
Ministry of
Preparation of the Master Plan, seaports by the port master plan 5.Focus Group by) Transportation Tanjung Buton Port,
Work Areas and Interest Areas May 16, 2022 – based on the operational needs of 6.Presentation of the Inception Report, Interim
4 of Tanjung Buton Port, Riau December 12, 2022 the port. Report, and Draft Final Report stages along (Central Port Function Riau Archipelago
Improvement Work Province
Archipelago Province 3.Providing guarantees of shipping with document revisions at each stage; Unit)
safety and smoothness as well as 7.Final report
order and the operation of the port.
4.Providing legal certainty and,
business certainty for seaport
administrators and seaport service
users as well as other related parties
as an effort to examine more deeply 1.Data Survey and Data Processing
the condition of, cruise ship lanes and
Review of Investigation and pools in the Port of Palembang 2.Analysis of Existing Port Shipping & Pool Ministry of
Design Survey Studies (SID) of Problems Transportation
5 Shipping Channels and Pools of June 28, 2022 – regarding the possibility of obstacles 3.Dredging Planning (Central Port Function Palembang Port, South
December 25, 2022 and hazards that could disrupt the Sumatra Province
Palembang Port, South Sumatra smooth and operational security of 4.Analysis of Financial and Commercial Improvement Work
Province Studies Unit)
ships going in and out of the Port of 5.Problem Solution Planning
Palembang.
1.Overview of the Conditions of the Existing
Ports operating on the North Coast of
Central Java Province;
2.Survey of Real Demand Supply (RDS) of
ports on the north coast of Central Java
To obtain a report on the hinterland Province;
and inter-port relations in Central Java 3.information on the movement of goods in
Demand and Hinterland Study of Province on goods commodities served Central Java Province to the Port of Jl. Medan Merdeka
June 3, 2022 – Barat No. 8 Jakarta
6 Port Development on the North October 30, 2022 by considering various supporting Destination; Fiscal Year 10110, Gd. Central Java Province.
Coast of Central Java Province aspects of each port so that it can be 4.It is mapped in the interior of every port on
considered in making decisions on the North Coast of Central Java Province; Works Lt. 17
future port stakeholder policies 5.an overview of the general conditions of the
Shipping Lines serving Port activities at
every Port on the North Coast of Central
Java Province;
6.Recommended optimizing the commodities
served for each port on the North Coast of
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Central Java Province.

Tanjung Priok, breakwater of


7 May 2020-July 2020 Review of masterplan report Survey Recon, and review report Eastport (Singapore) Pantoloan, Celebes
assetment

Supply of engineers to palu port


8 May 2020-July 2020 Review of masterplan report Survey Recon, and review report Eastport (Singapore) Pantoloan, Celebes
Master Plan Team

Port of Priok, Assetment for Breakwater Checking of structure  Bathimetri;


9 2020 Port Authority of Priok Tj.Priok
breakwater capacituy.  Strucute test
 Bathimetri; Ministry of Likupang, South of
10 Port of Likupang,DED 2020 Review Design  Strucute test
 Soil test Transportation Sulawesi

 Bathimetri;
Ministry of
11 Port of Calabay,DED 2020 Review Design  Strucute test Transportation Nusa tenggara barat
 Soil test

Performing analysis including intermodes


transportation, and masterplaning; sailing
safety study; social, economic, and
Ministry of
12 Port of Agats, Masterplan 2020 Masterplan environmental impact; financial; technical Transportation Papua
aspects;, and legal aspects. Also providing
field surveys which are related to all the
aspects above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Masterplan for Tuban Factory September- Anchorage, and Ocean Water Utilities, safety study; social, economic, and PT.Solusi Bangun
13 Transportation Analysis, Land environmental impact; financial; technical Tuban, East Java
port. (RITK) November 2020 Transportation Backup, Benefit on aspects;, and legal aspects. Indonesia (PT.SBI)
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
1. carry out identification related to the
to get a more detailed description of classification of main business fields, and
Work on Preparation of Study of types of business licenses to be able to their derivative business sectors which are Ministry of
manage Special Terminals, and allowed to carry out the operation / Transportation/
14 Basic Business Permits That September 2019 - Terminals for Self-interest management of Tersus, and TUKS in PT. GALUH Dumai, Banten, and
Can Manage Special Terminals, December 2019 Bintan
and Terminals for Self-interest synchronizing business types with the accordance with the 2017 KBLI; REKASINDO
Indonesian Business Field Standard 2. carry out a review of the laws, and CONSULTANT
Classification (KBLI) regulations related to business entities that
are allowed to submit management /
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
business of Tersus, and TUKS;
3. analyze, and evaluate the licensing of
Tersus, and TUKS management in the Port
Sector in accordance with applicable
regulations;
4. conducting a field survey of the object of
study conducted in the City of Cilegon,
Banten Province, Dumai City, Riau
Province, and Bintan City, Riau Islands
Province;
1. Data collection of hinterland areas
(potential supporting areas around the
location), and foreland
2. (destination area) to request sea
transportation;
3. Analysis of suitability of location allocation
with spatial planning nationally;
4. Alignment analysis to support the study of
port technical aspects:
5. Analysis of economic, and financial
Preparation of Preliminary Study feasibility;
Documents (FS) for the needs of the 6. Environmental feasibility analysis;
Preparation of Preliminary Study PT. JAYA ANNURYA Tanjung Penagak,
15 Documents (FS) for port master November 29, 2018 - port master plan in accordance with the 7. Analysis of economic growth, and regional KARIMUN Tanjung Balai Karimun,
February 1, 2019 format, and substance required by law, social development;
plans and acceptable to the Ministry of 8. Intra-and intermodal integration analysis; (Batam) Karimun District
Transportation 9. Technical review of port infrastructure
requirements;
10. Analysis of shipping safety in the study
area;
11. Analysis of defense, and security;
12. Financial feasibility analysis;
13. Summary of analysis results, and
recommendations;
14. Other matters that are necessary, and
commonly included in the work as
described in this Agreement.
1. Legal, and Institutional Study;
2. Technical Review;
Employment Consultancy reparation of the Pre-feasibility Study 3. Economic, and Commercial Studies; PT. CONSOCIATE
February 8, 2019 - Document refers to the Minister of 4. Environmental, and Social Studies; JAKARTA Bitung, North Sulawesi
16 Services Pre-feasibility study April 10, 2019 Transportation Regulation No.58 of 5. Study of the Form of PPP in the Provision of CORPORINDO Province
(PPP)
2018 Infrastructure; (Jakarta)
6. Risk Assessment;
7. Review of Government Support Needs
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
and/or Government Guarantees; and
8. Study on issues that need to be followed up
(out standing issues).
1. Technical Feasibility Study (FS)
includes:
a. Topographic , and Hydro-
Oceanographic Surveys (Currents,
Tides, Depth, Wave Modeling);
b. Spatial aspects analysis;
c. Economic Feasibility Analysis of Study
Areas;
d. Financial Feasibility Analysis of Study
Consulting Services for Areas;
Preparation of Technical Preparation of Technical Feasibility e. Environmental Feasibility Analysis;
Feasibility Study (FS) Study (FS) Technical, and Concession f. Analysis of economic growth, and
Documents, and Preparation of August 9, 2019 – for Mundam terminal Preparation of social development of the local area; PT. PELABUHAN
17 MUNDAM Dumai, Riau Province
Feasibility Study Documents octcober 9, 2019 Technical Feasibility Study (FS) g. Intra, and intermodal cohesiveness SEJAHTERA
(FS) of Mundam Terminal Technical, and Concession for analysis;
Concession Location in Dumai, Mundam terminal h. Analysis Availability of hinterland;
Riau Province i. Cruise security, and safety analysis;
j. Defense, and Security Analysis.
2. Feasibility Study (FS) Concession
includes:
a. Legal, and Institutional Study;
b. Technical Study;
c. Economic, and Commercial Studies;
d. Environmental, and Social Studies;
e. Study on the form of cooperation;
f. Study of Government Support Needs
Prepare the document for Private Partnership
Employment Sector Assessment Concession study for Anggrek Port Program in Anggrek Port to qualify the
18 Consulting Services Anggrek October 15, 2018 - Operators, and Backup Area Business standards, and regulations, and regulations, Indonesia Infrastructure Anggrek, Gorontalo
December 15, 2018 Guarantee Fund (IIGF) Province
Seaports Gorontalo Plan Performing PPP study to choose the suitable
port operator in Anggrek Port
1. Reviewing regulations related to the State
Develop standard output documents to Budget, and PPP inside planning, and
Employment of Consultancy accelerate the process of submitting budgeting system;
Services in the Preparation of budgets for allocation of PPP 2. Analyze synchronization of government Ministry Of National
Development Planning/
19 Standard Documents for Sector October 8, 2018 - implementation, this study also budget schedules, and submission of National Development Indonesia
Cooperation between December 31, 2018 produces a web-based database budget for APBN, and PPP allocations;
Government, and Business development system so that it can real- 3. Identify documents needed in submission Planning Agency
Republic of Indonesia
Entities (PPP) time analyze the feasibility of projects the government budget;
to be carried out in PPP. 4. Identify the document load in accordance
with the regulations apply;
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
5. Compile the standard sector documents
needed for government budget
submission;, and Develop a standard
document web-based database system
needed for government budget
submissions
Preparation Work for Preliminary
Prepare the document for Private Partnership
Study of Government Concession study for Kaimana, and Program in Kaimana Port to qualify the Kaimana, West Papua
Cooperation between Business August 23, 2018 - Ministry of
20 Entities in the Port of Kaimana, December 21, 2018 Serui Port Operators, and Backup Area standards, and regulations, and regulations, Transportation Province, and Serui,
Business Plan Performing concession study to choose the Papua Province
West Papua Province, and Serui suitable port operator in KaimanaPort
Port, Papua Province
Preparation of Preliminary Study Prepare the document for Private Partnership
of Government Cooperation of Concession study for Dobo, and Program in Kaimana Port to qualify the Dobo, West Maluku
August 23, 2018 – Ministry of
21 Business Entities in Dobo Port, December 21, 2018 pomako Port Operators, and Backup standards, and regulations, and regulations, Transportation Province, and Pomakoi
Maluku Province, and Pomako Area Business Plan Performing concession study to choose the Papua Province
Port, Papua Province suitable port operator in KaimanaPort
1. Develop indicators of benefit evaluation on
infrastructure development that has been
carried out within the Directorate General
of Sea Transportation which is currently not
Evaluating the benefits of the results of / less optimal in its operation.
Work Study of the Evaluation of the development of sea transportation 2. Evaluate the benefits of developing seaport
the Benefits of Transportation
Infrastructure Development for infrastructure that has been carried out facilities both for business people (core Kaimana, West Papua
August 1st, 2018 - by the Directorate General of Sea business), the community, and for the Ministry of
22 Seaports at the Location of Ulu December 28, 2018 Transportation, as well as mapping the development, and operation of ports. Transportation Province, and Serui,
Siau Port, Sitaro Islands Papua Province
Regency, North Sulawesi un/less optimal port utilization 3. Prepare a strategic plan for the
problems, and developing alternative development, and improvement of the
Province solutions to existing problems benefits of sea transportation infrastructure
that has been implemented within the
Directorate General of Sea Transportation
which is currently not / less optimal in its
operation.
1. Preparation of Draft Indonesian National
The targets to be achieved are the Work Competency Standards (RSKKNI),
Study Work Preparation of Draft drafting of the Indonesian National and the Indonesian National Qualifications
Indonesian National Work
Competency Standards (SKKNI), Work Competency Standards Framework (RKKNI) on the sub- Dobo, West Maluku
May 25, 2018 - (RSKKNI), and the Indonesian National classification of Port Facility Maintenance Ministry of
23 and Design of the Indonesian December 20, 2018 Qualifications Framework (RKKNI) in Experts. Transportation Province, and Pomakoi
National Qualifications Papua Province
Framework (RKKNI) Port Facility Indonesian, and English in the 2. The draft document translation Indonesian
subclassification of Port Facility National Competence (RSKKNI), and the
Maintenance Experts Maintenance Experts. Indonesian National Qualifications
Framework (RKKNI) in subclassification
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Port Facility Care Expert in English.
1. Conduct an inventory of the types of
construction work at the railway operation
facility.
2. Collect the reference price of the base or
the price of the manufacturer for each
equipment/ component of the railway
operation facility from each
manufacturer/supplier/agent designated by
the manufacturer.
3. Conduct a review of the analysis coefficient
of the train operating unit unit prices in
This activity is carried out with the Indonesia at this time.
intention of preparing/compiling a
standard coefficient document for 4. Make work methods for material needs,
and personnel for items of railway
analyzing the price of a railroad operation facilities.
operating facility unit for the availability
Unit Price Analysis' Review Work of a document analysis of the quality of 5. Make a calculation of the coefficients for Ministry Of
March 6, 2018 - the railway operation facility items based Transportation
13 For Railways Event Operations October 1st, 2018 a railroad operating facility facility that on work methods. Directorate General Of Indonesia
Facility can be used as a guide, and reference
in the preparation of the RAB planning 6. Make a price analysis calculation for each Railway
type of work for the train operation facility.
of railroad operations in all regions 7. Make a concept of determining the
under the auspices of the Directorate
General of Railways, Ministry of coefficient of work of the railroad operating
facilities to be used.
Transportation 8. Conduct a literature study on the analysis
of the work unit price of the railroad
operating facilities that are overseas, and
make a comparison / bench marking.
9. Prepare an analysis coefficient of the
railroad operating facility facility unit price.
10. Conduct analysis, and evaluation of data
from the results of surveys on field surveys,
and detailed surveys on secondary data
collection related to railway operation
facilities.
Performing analysis including stated
preference analysis for demand forecasting;
Developing the Feasibility Study on a transhipment analysis in port planning; social,
Feasibility Study (FS) of Wapoga May 4, 2018 – Ministry of Waropen District,
24 Port October 29, 2018 new developed port in the eastern port economic, and environmental impact; financial; Transportation Papua Province
of Indonesia technical aspects;, and legal aspects.
Also providing field surveys which are related
to all the aspects above.
25 Pre-feasibility study (Pre FS) The 31 July 2015 – 28 Developing the Pre-Feasibility, and Performing analysis including stated Ministry of Bangkalan District East
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
development of new port in the December 2015 Feasibility Study on New International preference analysis for demand forecasting; Transportation Java Province
East Java Province Port in East Java Province transhipment analysis in port planning; social,
economic, and environmental impact; financial;
technical aspects;, and legal aspects. Also
providing field surveys which are related to all
the aspects above.
Performing analysis of Port Infrastructure
Masterplaning on Port Infrastructure Facilities master plan, Safety Sailing Study,
Anchorage, and Ocean Water Utilities,
Facilities, Safety Sailing Study, Transportation Analysis including intermodes Talang Duku, Muara
Master Plan Of Talang Duku, Anchorage, and Ocean Water Utilities,
26 Muara Sabak, and Kuala 02 October 2017 – Transportation Analysis, Land transportation, and land transportation back up PT Pelindo II Sabak, and Kuala
On Progress such as Railway, and Short Sea Shipping, Tungkal, Jambi
Tungkal, Jambi Trsnportation Backup, Benefit on social, economic, and environmental impact; Province
Socio-Economic Impact, Environmental
Impact, and Legal Aspects financial; technical aspects;, and legal aspects.
Also providing field surveys which are related
to all the aspects above.
 SID: Performing analysis including
structural, and geotechnical analysis of the
infrastructure; numerical model on
hydrodynamic, wave transformation;
sedimentation analysis; water quality
model; wave-current coupled model. Also
Survey, Investigation, and Study of Masterplan, and Detail Design providing field surveys which are related to
March 2017 – Ministry of North Sumatra
27 Design (SID), and Masterplan of October 2017 of a supporting port within Indonesian all the aspects above. Transportation Province
Simanindo Port National Strategic Region  Masterplan: Performing analysis including
intermodes transportation, and
masterplaning; sailing safety study; social,
economic, and environmental impact;
financial; technical aspects;, and legal
aspects. Also providing field surveys which
are related to all the aspects above.
 FS: Performing analysis including stated
preference analysis for demand
forecasting; transhipment analysis in port
planning; social, economic, and
environmental impact; financial; technical
Feasibility Study (FS); Survey, aspects;, and legal aspects.
28 Investigation, and Design (SID);, March 2017 – Study of Feasibility, Masterplan, and  SID: Performing analysis including Ministry of Moluccas Province
October 2017 Detail Design of Port Facility Transportation
and Masterplan of Arwala Port structural, and geotechnical analysis of the
infrastructure; numerical model on
hydrodynamic, wave transformation;
sedimentation analysis; water quality
model; wave-current coupled model. Also
providing field surveys which are related to
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
all the aspects above.
 Masterplan: Performing analysis including
intermodes transportation, and
masterplaning; sailing safety study; social,
economic, and environmental impact;
financial; technical aspects;, and legal
aspects. Also providing field surveys which
are related to all the aspects above. Also
providing field surveys which are related to
all the aspects above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Anchorage, and Ocean Water Utilities, safety study; social, economic, and Marisa - Gorontalo
Masterplan of Marisa, and Wakai March 2017 – Ministry of Province
29 Port October 2017 Transportation Analysis, Land environmental impact; financial; technical Transportation Wakai – Central
Transportation Backup, Benefit on aspects;, and legal aspects.
Socio-Economic Impact, Environmental Also providing field surveys which are related Sulawesi Province
Impact, and Legal Aspects to all the aspects above.
Performing analysis including stated
preference analysis for demand forecasting;
Developing the Feasibility Study on a transhipment analysis in port planning; social,
Feasibility Study (FS) of Mules March 2017 – Ministry of East Nusa Tenggara
30 Port October 2017 new developed port in the eastern port economic, and environmental impact; financial; Transportation Province
of Indonesia technical aspects;, and legal aspects.Also
providing field surveys which are related to all
the aspects above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Masterplan of Dobo, and Batu April 2017 – October Anchorage, and Ocean Water Utilities, safety study; social, economic, and Ministry of
31 Transportation Analysis, Land environmental impact; financial; technical Moluccas Province
Goyang Port 2017 Transportation Backup, Benefit on aspects;, and legal aspects. Transportation
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Performing analysis including structural, and
geotechnical analysis of the infrastructure;
numerical model on hydrodynamic, wave
Detail Engineering Design of April 2017 – October Detail Engineering Design of a transformation; sedimentation analysis; water Ministry of
32 Wonreli Port 2017 Damaged Port Facility quality model; wave-current coupled model. Transportation Moluccas Province
Also providing field surveys which are related
to all the aspects above. Preparing a
recommended action of the damaged structure
Developing the Feasibility Study on1.a Performing analysis including stated
Pre-Feasibility Study of Tuban preference analysis for demand forecasting; Ministry of
33 Port Mei 2017 - new developed port in the central part transhipment analysis in port planning; social, Transportation East Java Province
of Indonesia
economic, and environmental impact; financial;
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
technical aspects;, and legal aspects.
2. Also providing field surveys which are
related to all the aspects above.
Performing analysis including structural, and
geotechnical analysis of the infrastructure;
numerical model on hydrodynamic, wave
Detail Engineering Design of July 2017 – Detail Engineering Design of a transformation; sedimentation analysis; water Ministry of
34 Moluccas Province
Lerokis Port December 2017 Damaged Port Facility quality model; wave-current coupled model. Transportation
Also providing field surveys which are related
to all the aspects above. Preparing a
recommended action of the damaged structure
A study to develop guidance for
government in dredging work
Procurement Consultancy concession. This study considering Performing market study, technical analysis,
April – October legal analysis, economic, and financial Ministry of
35 Services of Concession 2016 some aspects such as regulation, analysis, as well as several related field Transportation Indonesia
Document in Dredging Work operation, and availability of dredging
vessels, and business aspects from studies.
dredging work.
Performing analysis of breakwater construction
consideration such as hydro-oceanography
Study of Breakwater Planning A study to develop guidance for aspects, observing study from international Ministry of
36 April – October 2016 Ministry of Transportation Indonesia code. Also performing numerical model on Indonesia
Manual about breakwater construction work. hydrodynamic, wave transformation, Transportation
sedimentation analysis;, and performing
physical model of breakwater structure.
A study to develop guidance for
government in dredging work Performing market study, technical analysis,
Procurement Consultancy concession. This study considering legal analysis, economic, and financial Ministry of
37 Services of Concession April – October 2016 some aspects such as regulation, analysis, as well as several related field Indonesia
Document in Dredging Work operation, and availability of dredging studies. Transportation
vessels, and business aspects from
dredging work.
Performing analysis including Sedimentation
analysis; numerical model on hydrodinamic, Tanjung Priok
Study Sedimentation a Groove 12 February - 09 Developing the Study of Sedimentation wave transformation; water quality model;
38 Shipping Tanjung Priok Port August 2016 in The Port of Tanjung Priok Jakarta wave-current coupled model. Also providing Department of Tanjung Priok Jakarta
Transportation
field surveys which are related to all the
aspects above.
Performing analysis including inspection,
maintenance, and repairing structure of port
Maintenance Study of Port 28 March 2016 – 24 Study on maintenance, maintenance Ministry of
39 Facilities September 2016 method, and repair of port facilities. facilities (jetty, trestle, causeway), Transportation Pamekasan, East Java.
Implementation guidelines structural damage to
the Port Facilities. Also providing testing field
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
investigations which are related to the structure
of Port Facilities
Performing analysis including stated
preference analysis for demand forecasting;
Developing the Feasibility Study on
Feasibility Study Location of a 02 February - 30 selecting the five most strategic transhipment analysis in port planning; social, Tanjung Priok
40 Boat Dock State Guest, and economic, and environmental impact; financial; Department of Tanjung Priok Jakarta
Cruise in Tanjung Priok Port June 2016 location of Curise, and Yacht Port technical aspects;, and legal aspects.Also Transportation
Development in Indonesia
providing field surveys which are related to all
the aspects above.
Performing analysis including identify region,
Identify Supporting for Feasibility New transportation, economic, social, and technical
Pre-feasibility study (Pre FS) The
41 development of new port on June – Nov 2016 Port based on economic, for support on the part of planning port Ministry of East Java
transportation, social, and technical infrastructure. Transportation
Trenggalek, East Java aspects on Trenggalek Region Collecting data from government to support
identify, and analysis on pre -feasibility study
Performing analysis including identify region,
Identify Supporting for Feasibility New transportation, economic, social, and technical
Pre-feasibility study (Pre FS) The
42 development of new port on June – November Port based on economic, for support on the part of planning port Ministry of East Java
2016 transportation, social, and technical infrastructure. Transportation
Sumenep, East Java aspects on Sumenep Region Collecting data from government to support
identify, and analysis on pre -feasibility study
Performing analysis including identify region,
transportation, economic, social, and technical
Feasibility Study (FS) 15 January - 20 June study of Tamako port based on for support on the part of planning port Ministry of
43 Development of Tamako Port economic, transportation, social, and North Sulawesi
Sangihe County, North Sulawesi 2016 technical aspects infrastructure. Transportation
Collecting data from government to support
identify, and analysis on feasibility study
- Performing analysis regional work
Study of Regional work environment, environment, and interest for support on the
44 DLKr, and DLKp Banggai Port 22 January - 20 Juny and interests of Banggai Port Central part of planning port infrastructure. Ministry of Central Sulawesi
Central Sulawesi 2016 Transportation
Sulawesi - Collecting data from government to support
identify, and analysis on pre -feasibility study
- Performing analysis regional work
Study of Regional work environment, environment, and interest for support on the
DLKr, and DLKp Jailolo Port 03 March - 31 July Ministry of
45 North Maluku 2016 and interests of Jailolo Port North part of planning port infrastructure. Transportation North Maluku
Maluku - Collecting data from government to support
identify, and analysis on pre -feasibility study
Survey, Investigation, and Developing the Study, Inventaritation, Performing analysis including structural, and
geotechnical analysis of the infrastructure;
Design of Lighthouse Facility in 22 February - 19 and Design of Lighthouse numerical model on hydrodinamic, wave Ministry of Jemur Island, and Iyu
46 Iyu Kecil Island, and Jemur Infrastructure Facilities, Especially Kecil Island, Riau
Island, Navigation District Class August 2016 Wharf Infrastructure for Navigation transformation; sedimentation analysis. Also Transportation
providing field surveys which are related to all
1 Dumai Vessels the aspects above.
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Detail Engineering Design Performing analysis including structural, and
Developing the Study, Inventaritation,
Rehabilitation of Navigation and Design of Lighthouse geotechnical analysis of the infrastructure;
Vessel Port, Navigation District 22 February 2016 – numerical model on hydrodinamic, wave Ministry of Tanjung Priok, Jakarta,
47 Class 1 Tanjung Priok, and 19 August 2016 Infrastructure Facilities, Especially transformation; sedimentation analysis. Also Transportation and Paotere, Makassar
Wharf Infrastructure for Navigation
Navigation District Class 1 Vessels providing field surveys which are related to all
Makassar the aspects above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Anchorage, and Ocean Water Utilities, safety study; social, economic, and
48 Master Plan of Lirung Port North 12 February - 9 Transportation Analysis, Land environmental impact; financial; technical Ministry of North Sulawesi
Sulawesi August 2016 Transportation
Trsnportation Backup, Benefit on aspects;, and legal aspects.
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Anchorage, and Ocean Water Utilities, safety study; social, economic, and
49 Master Plan of Saonek Port, and 15 April - 11 October Transportation Analysis, Land environmental impact; financial; technical Ministry of Saonek, and Waisai
Waisai Port West Papua 2016 Transportation West Papua
Trsnportation Backup, Benefit on aspects;, and legal aspects.
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Anchorage, and Ocean Water Utilities, safety study; social, economic, and
Master Plan of Sebalang Port, 25 April - 21 October Ministry of
50 and Sebesi Island 2016 Transportation Analysis, Land environmental impact; financial; technical Transportation Sebalang, and Sebesi
Trsnportation Backup, Benefit on aspects;, and legal aspects.
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Master Plan of Siwa Port South Anchorage, and Ocean Water Utilities, safety study; social, economic, and Siwa South Sulawesi,
4 April - 31 October Ministry of
51 Sulawesi, and Lasusua Port 2016 Transportation Analysis, Land environmental impact; financial; technical Transportation and Lasusua Southeast
southeast Sulawesi Trsnportation Backup, Benefit on aspects;, and legal aspects. Sulawesi
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Master Plan of Pasuruan Port 9 Mei - 4 November Anchorage, and Ocean Water Utilities, safety study; social, economic, and Surabaya Department
52 Transportation Analysis, Land environmental impact; financial; technical Pasuruan East Java
East Java 2016 Trsnportation Backup, Benefit on aspects;, and legal aspects. of Transportation
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Detail Engineering Design 22 February 2016 – Developing the Study, Inventaritation, Performing analysis including structural, and Ministry of Tanjung Priok, Jakarta,
53 Rehabilitation of Navigation 19 August 2016 and Rehabilitation Design of Facilities, geotechnical analysis of the infrastructure; Transportation and Paotere, Makassar
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Vessel Port, Navigation District Especially Wharf Infrastructure for numerical model on hydrodinamic, wave
Class 1 Tanjung Priok, and Navigation Vessels transformation; sedimentation analysis. Also
Navigation District Class 1 providing field surveys such as hydro-
Makassar oceanography, bathymetry, and structural
survey which are related to all the aspects
above.s above.
Performing analysis including structural, and
geotechnical analysis of the infrastructure;
Survey, Investigation, and Developing the Study, Inventaritation, numerical model on hydrodinamic, wave
54 Design of Coast Guard Port in 01 June - 28 October and Design of Port Infrastructure transformation; sedimentation analysis; water Ministry of Sampit Central Borneo
2016 Transportation
Sampit Central Borneo Facilities quality model; wave-current coupled model.
Also providing field surveys which are related
to all the aspects above.s above.
Performing analysis including Sedimentation
Survey, Investigation, and Developing the study of sedimentation analysis; numerical model on hydrodinamic,
Design of Navigation Channel, wave transformation; water quality model;
55 and Harbour Basin Dredging February – August in port navigation channel, and harbor wave-current coupled model; navigation Ministry of Gorontalo
2016 basin. Also studying dredging work Transportation
Work in Port of Gorontalo, plan channel, harbor basin, and dredging work
Gorontalo analysis. Also providing field surveys which are
related to all the aspects above.
Performing analysis including Sedimentation
analysis; numerical model on hydrodinamic,
Survey, Investigation, and Developing the study of sedimentation wave transformation; water quality model;
Design of Navigation Channel, February – August in port navigation channel, and harbor Ministry of
56 and Harbour Basin Dredging 2016 basin. Also studying dredging work wave-current coupled model; navigation Transportation Sorong, West Irian
channel, harbor basin, and dredging work
Work in Port of Arar, Sorong plan analysis. Also providing field surveys which are
related to all the aspects above.
Performing analysis including Sedimentation
analysis; numerical model on hydrodinamic,
Survey, Investigation, and Developing the study of sedimentation wave transformation; water quality model;
Design of Navigation Channel, February – August in port navigation channel, and harbor Ministry of
57 and Harbour Basin Dredging 2016 basin. Also studying dredging work wave-current coupled model; navigation Transportation Namlea, Maluku
channel, harbor basin, and dredging work
Work in Port of Namlea, Maluku plan analysis. Also providing field surveys which are
related to all the aspects above.
A study to develop guidance for
government in dredging work
The Study of Implementation of Performing market study, technical analysis,
Model Calculations Concessions 19 June – 26 October concession. This study considering legal analysis, economic, and financial Ministry of
58 some aspects such as regulation, North Sumatera
of Land, and Buildings with A 2015 operation, and availability of dredging analysis, as well as several related field Transportation
Third Party in Belawan Port studies.
vessels, and business aspects from
dredging work.
19 May – 15 Masterplaning on Port Infrastructure Performing analysis including intermodes Ministry of
59 Master Plan Of Midai Port November 2015 Facilities, Safety Sailing Study, transportation, and masterplaning; sailing Transportation Riau Islands
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Anchorage, and Ocean Water Utilities, safety study; social, economic, and
Transportation Analysis, Land environmental impact; financial; technical
Trsnportation Backup, Benefit on aspects;, and legal aspects.
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Detail Engineering Design (DED)
Replacement of a partial
crossing into a non- invisible to obtain a substitute construction of a to obtain a substitute construction of a partial
crossing, and makeshift partial cross section into a
60 construction construction at KM 12 August – 18 non-plane crossing, and the design of cross section into a non-plane crossing, and PT. Kereta Api Jakarta
December 2015 the design of emergency construction Indonesia (Persero)
4+ emergency construction supporting supporting construction
400 at the Jakarta DAOP construction
1 Batter Emplassement
Area
Performing analysis including structural, and
Providing field surveys which are geotechnical analysis of the infrastructure;
related to all the aspects to Developing numerical model on hydrodynamic, wave
61 Detail Engineering Design of 02 July 2015 – the Study, Inventaritation, and transformation; sedimentation analysis; water Ministry of Bali Islands
Labuhan Amuk Port 29 November 2015 Rehabilitation Design of Facilities, quality model; wave-current coupled model. Transportation
Especially Wharf Infrastructure for Also providing field surveys which are related
Navigation Vessels to all the aspects above. Preparing a
recommended action of the damaged structure.
Performing analysis including structural, and
Providing field surveys which are geotechnical analysis of the infrastructure;
Review Survey Investigation, numerical model on hydrodynamic, wave
62 and Design (SID) Sea port of 14 June 2015 – related to all the aspects to Developing transformation; sedimentation analysis; water Ministry of , West Java Province
11 November 2015 the Study, Inventaritation, and Design Transportation
Pelabuhan Ratu, West Java of Port Infrastructure Facilities quality model; wave-current coupled model.
Province Also providing field surveys which are related
to all the aspects above.
Performing analysis including structural, and
Providing field surveys which are
related to all the aspects to Developing geotechnical analysis of the infrastructure;
numerical model on hydrodynamic, wave
63 Detail Engineering Design of 01 September 2015 – the Study, Inventaritation, and transformation; sedimentation analysis; water Department of DKI Jakarta
Muara Angke Port 15 November 2015 Rehabilitation Design of Facilities,
Especially Wharf Infrastructure for quality model; wave-current coupled model. Transportation
Also providing field surveys which are related
Navigation Vessels to all the aspects above..
Performing analysis including Sedimentation
analysis; numerical model on hydrodinamic,
Sedimentation Study of Ujung 27 January 2014 – 26 Developing the Study of Sedimentation wave transformation; water quality model; Jambi Department of
64 Jambi, Sumatra
Jabung Port April 2014 in The Port of Ujung Jabung, Jambi wave-current coupled model. Also providing Transportation
field surveys which are related to all the
aspects above.
65 Survey Investigation, and Design 22 May 2014 – 18 Developing the Study, Inventaritation, Performing analysis including structural, and Ministry of West Kalimantan
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Works Dredging Sailing / October 2014 and Design of Port Infrastructure geotechnical analysis of the infrastructure; Transportation
Swimming Piers Sintete West Facilities numerical model on hydrodinamic, wave
Kalimantan transformation; sedimentation analysis; water
quality model; wave-current coupled model.
Also providing field surveys which are related
to all the aspects above.s above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Anchorage, and Ocean Water Utilities, safety study; social, economic, and
66 Master Plan of Pulau Sambu 04 June 2014 – 03 Transportation Analysis, Land environmental impact; financial; technical Belawan Port Authority Riau, Sumatra
Port October 2014
Trsnportation Backup, Benefit on aspects;, and legal aspects.
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Performing analysis including Sedimentation
Developing the study of sedimentation analysis; numerical model on hydrodinamic,
Survey Investigation, and Design wave transformation; water quality model;
67 Works Dredging Sailing / 04 June 2013 – 01 in port navigation channel, and harbor wave-current coupled model; navigation Ministry of Takalar Island
October 2013 basin. Also studying dredging work Transportation
Swimming Piers Takalar Port plan channel, harbor basin, and dredging work
analysis. Also providing field surveys which are
related to all the aspects above.
Providing field surveys which are Performing analysis including structural, and
geotechnical analysis of the infrastructure;
Detail Engineering Design of related to all the aspects to Developing numerical model on hydrodynamic, wave
02 September 2014 – the Study, Inventaritation, and Ministry of
68 Malarko Port Province Riau 30 December 2014 Rehabilitation Design of Facilities, transformation; sedimentation analysis; water Transportation Province Riau Island
Island quality model; wave-current coupled model.
Especially Wharf Infrastructure for Also providing field surveys which are related
Navigation Vessels
to all the aspects above.
Providing field surveys which are Performing analysis including structural, and
geotechnical analysis of the infrastructure;
related to all the aspects to Developing numerical model on hydrodynamic, wave
Detail Engineering Design of 02 September 2014 – the Study, Inventaritation, and Ministry of
69 Malore Port 30 December 2014 Rehabilitation Design of Facilities, transformation; sedimentation analysis; water Transportation Sulawesi
quality model; wave-current coupled model.
Especially Wharf Infrastructure for Also providing field surveys which are related
Navigation Vessels
to all the aspects above.
Performing analysis including structural, and
Providing field surveys which are geotechnical analysis of the infrastructure;
related to all the aspects to Developing
Detail Engineering Design of 02 September 2014 – the Study, Inventaritation, and numerical model on hydrodynamic, wave Ministry of
70 transformation; sedimentation analysis; water Halmahera
Yaba, and Manu Port 30 December 2014 Rehabilitation Design of Facilities, quality model; wave-current coupled model. Transportation
Especially Wharf Infrastructure for
Navigation Vessels Also providing field surveys which are related
to all the aspects above.
Detail Engineering Design of 02 September 2014 – Providing field surveys which are Performing analysis including structural, and Ministry of
71 Malarko Port Province Riau 30 December 2014 related to all the aspects to Developing geotechnical analysis of the infrastructure; Transportation Province Riau Island
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Island the Study, Inventaritation, and numerical model on hydrodynamic, wave
Rehabilitation Design of Facilities, transformation; sedimentation analysis; water
Especially Wharf Infrastructure for quality model; wave-current coupled model.
Navigation Vessels Also providing field surveys which are related
to all the aspects above...
Performing analysis including structural, and
geotechnical analysis of the infrastructure;
Survey Investigation, and Design 01 Augst 2013 – Developing the Study, Inventaritation, numerical model on hydrodinamic, wave Ministry of
72 Port International Passenger and Design of Port Infrastructure transformation; sedimentation analysis; water Pasir Peti
Port, and Marina in Pasir Peti 28 December 2013 Facilities quality model; wave-current coupled model. Transportation
Also providing field surveys which are related
to all the aspects above.s above.
Performing analysis including structural, and
Providing field surveys which are geotechnical analysis of the infrastructure;
related to all the aspects to Developing
Detail Engineering Design of 01 Augst 2013 – the Study, Inventaritation, and numerical model on hydrodynamic, wave Ministry of
73 transformation; sedimentation analysis; water Natuna
Rinai Natuna Port 28 December 2013 Rehabilitation Design of Facilities, quality model; wave-current coupled model. Transportation
Especially Wharf Infrastructure for
Navigation Vessels Also providing field surveys which are related
to all the aspects above...
Performing analysis including structural, and
Providing field surveys which are
related to all the aspects to Developing geotechnical analysis of the infrastructure;
numerical model on hydrodynamic, wave
74 Survey Investigation, and Design 9 July 2013 – the Study, Inventaritation, and transformation; sedimentation analysis; water Ministry of Papua
of Port in Mappi, Merauke Papua 5 December 2013 Rehabilitation Design of Facilities, Transportation
Especially Wharf Infrastructure for quality model; wave-current coupled model.
Also providing field surveys which are related
Navigation Vessels to all the aspects above...
Performing analysis including structural, and
Providing field surveys which are
related to all the aspects to Developing geotechnical analysis of the infrastructure;
numerical model on hydrodynamic, wave
75 Detail Engineering Design of 25 July 2013 – the Study, Inventaritation, and transformation; sedimentation analysis; water Ministry of Riau Island
Bagan Siapi-api Port 23 October 2013 Rehabilitation Design of Facilities, Transportation
Especially Wharf Infrastructure for quality model; wave-current coupled model.
Also providing field surveys which are related
Navigation Vessels to all the aspects above...
Providing field surveys which are Ministry of
related to all the aspects to Developing
Detail Engineering Design of 25 July 2013 – the Study, Inventaritation, and Performing field surveys such as hydro- Transportation
76 Sailing School Construction in oceanography, bathymetry, and geotechnical Human Resources Riau
Riau 23 October 2013 Rehabilitation Design of Facilities, survey. Development Agency
Especially Wharf Infrastructure for
Navigation Vessels of Transportation
Masterplaning on Port Infrastructure Performing analysis including intermodes
77 Master Plan of Tual Port 17 May 2013 - 13 Facilities, Safety Sailing Study, transportation, and masterplaning; sailing Ministry of Maluku
November 2013 Anchorage, and Ocean Water Utilities, safety study; social, economic, and Transportation
Transportation Analysis, Land environmental impact; financial; technical
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Trsnportation Backup, Benefit on aspects;, and legal aspects.
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Performing analysis including structural, and
geotechnical analysis of the infrastructure;
Survey, Investigation, and Developing the Study, Inventaritation, numerical model on hydrodinamic, wave
78 Design of Port in Mappi, 9 July 2013 - 5 and Design of Port Infrastructure transformation; sedimentation analysis; water Ministry of Papua
December 2013 Transportation
Merauke Papua Facilities quality model; wave-current coupled model.
Also providing field surveys which are related
to all the aspects above.s above.
Masterplaning on Port Infrastructure Performing analysis including intermodes
Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
Anchorage, and Ocean Water Utilities, safety study; social, economic, and
79 Master Plan of Banten Port 26 Juny 2012 - 03 Transportation Analysis, Land environmental impact; financial; technical Tanjung Priok Port Banten, West Java
December 2012 Authority
Trsnportation Backup, Benefit on aspects;, and legal aspects.
Socio-Economic Impact, Environmental Also providing field surveys which are related
Impact, and Legal Aspects to all the aspects above.
Provides a field survey related to all
aspects of developing for the study,
Detail Engineering Design of Inventaritation, and Building facilities Conduct analysis of regional, and exciting work Human Resources
80 Sailing School Construction in 2011 design, and prepare Drawings detailing environment to support the building of Development Agency Riau
Riau the building or bestek, plans cost infrastructure planning of Transportation
budget, and work plan, and terms
(RKS)
Performing analysis including structural, and
geotechnical analysis of the infrastructure;
Survey, Investigation, and Developing the Study, Inventaritation, numerical model on hydrodinamic, wave
Ministry of
81 Design of Paloh Port in West 2011 and Design of Port Infrastructure transformation; sedimentation analysis; water Transportation West Kalimantan
Kalimantan Facilities quality model; wave-current coupled model.
Also providing field surveys which are related
to all the aspects above.s above.
Performing analysis including structural, and
geotechnical analysis of the infrastructure;
Survey, Investigation, and 2 Mei 2011 – Developing the Study, Inventaritation, numerical model on hydrodinamic, wave Ministry of
82 Design of Jinato Port in South and Design of Port Infrastructure transformation; sedimentation analysis; water South Sulawesi
Sulawesi 28 September 2011 Facilities quality model; wave-current coupled model. Transportation
Also providing field surveys which are related
to all the aspects above.s above.
Supervision of all related construction works;
monthly progress reporting; material approval;
Supervision of Pacitan Port Supervision of Port Landside Facility Ministry of
83 Facility Construction Phase II May – October 2012 Construction quality control, and assurance; schedule Transportation East Java Province
planning, and controlling; shop drawing, and
technical specification review
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Supervision of all related construction works;
Supervision of Gorontalo Port April – December monthly progress reporting; material approval; Ministry of
84 Supervision of Jetty Construction quality control, and assurance; schedule Gorontalo Province
Facility Construction Phase II 2012 planning, and controlling; shop drawing, and Transportation
technical specification review
Supervision of all related construction works;
monthly progress reporting; material approval;
Supervision of Amahai Port April – November Supervision of Port Landside Facility Ministry of
85 Facility Construction 2012 Construction quality control, and assurance; schedule Transportation Moluccas Province
planning, and controlling; shop drawing, and
technical specification review
Supervision of all related construction works;
Supervision of Maloy Port Supervision of All Port Facility monthly progress reporting; material approval; Ministry of
86 April – October 2011 quality control, and assurance; schedule East Borneo Province
Facility Construction Construction planning, and controlling; shop drawing, and Transportation
technical specification review
Supervision of all related construction works;
monthly progress reporting; material approval;
Supervision of Gorontalo Port April – December Ministry of
87 Facility Construction Phase I 2011 Supervision of Jetty Construction quality control, and assurance; schedule Transportation Gorontalo Province
planning, and controlling; shop drawing, and
technical specification review
Performing analysis including structural, and
Providing field surveys which are
Detail Engineering Design of related to all the aspects to Developing geotechnical analysis of the infrastructure;
numerical model on hydrodynamic, wave Human Resources
88 Jetty (Port) Power Plant Maret 2011 – the Study, Inventaritation, and transformation; sedimentation analysis; water Development Agency Riau
Development Area PDA 2x27,5 Mei 2011 Rehabilitation Design of Facilities,
MW power plant Especially Wharf Infrastructure for quality model; wave-current coupled model. of Transportation
Also providing field surveys which are related
Navigation Vessels to all the aspects above...
Topographic Survey, and Soil
Investigation Amendment for
The Implementation of Review Review Study On the Project for Performing topographic survey; performing soil ORI (Oriental
Malacca, and
89 Study On the Project for December 2008 – Enhancement of Vessel Traffic System investigation; providing preliminary soil Consultants Singapore Straits
Enhancement of Vessel Traffic March 2009 In Malacca, and Singapore Straits In information; calculating soil capacity analysis; International)
System In Malacca, and The Republic of Indonesia preparing geotechnical technical specification Japan (Tg. Sair)
Singapore Straits In The
Republic of Indonesia
Supervision of all related construction works;
monthly progress reporting; material approval;
Supervision of Pelaihari Port June– December Supervision of All Port Facility Ministry of
90 Facility Construction Phase II 2009 Construction quality control, and assurance; schedule Transportation South Borneo Province
planning, and controlling; shop drawing, and
technical specification review
Supervision of Dumai Port June – December Supervision of Passenger Jetty Supervision of all related construction works; Ministry of
91 monthly progress reporting; material approval; Gorontalo Province
Facility Construction Phase I 2008 Construction quality control, and assurance; schedule Transportation
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
planning, and controlling; shop drawing, and
technical specification review
Supervision of all related construction works;
monthly progress reporting; material approval;
Supervision of Pelaihari Port June – December Supervision of All Port Facility Ministry of
92 Facility Construction Phase I 2008 Construction quality control, and assurance; schedule Transportation South Borneo Province
planning, and controlling; shop drawing, and
technical specification review
Topographic Survey, and Soil
Investigation Amendment for
The Implementation of Review Review Study On the Project for Performing topographic survey; performing soil ORI (Oriental
Study On the Project for October– December Enhancement of Vessel Traffic System investigation; providing preliminary soil Consultants Malacca, and
93 Singapore Straits
Enhancement of Vessel Traffic 2008 In Malacca, and Singapore Straits In information; calculating soil capacity analysis; International) (Sepahat, Selincing)
System In Malacca, and The Republic of Indonesia preparing geotechnical technical specification Japan
Singapore Straits In The
Republic of Indonesia
Package II.Topographic Survey,
and Soil Investigation For The Joint Venture of The
The Basic Design Study on The Project Performing topographic survey; performing soil Pacific Consultants
Basic Design Study on The July – September for Development of Vessel Traffic investigation; providing preliminary soil International (PCI), and Malacca, and
94 Project For Development of Singapore Straits
Vessel Traffic Service in 2007 Service in Malacca, and Singapore information; calculating soil capacity analysis; Japan Aids to (Bengkalis,Tj.Parit)
Straits in The Republic of Indonesia preparing geotechnical technical specification Navigation Association
Malacca, and Singapore Straits (JANA))
in The Republic of Indonesia
Package I.Topographic Survey,
and Soil Investigation For The Joint Venture of The Malacca, and
The Basic Design Study on The Project Performing topographic survey; performing soil Pacific Consultants
Basic Design Study on The July – September for Development of Vessel Traffic investigation; providing preliminary soil International (PCI), and Singapore Straits
95 Project For Development of (Dumai,Tanjung
Vessel Traffic Service in 2007 Service in Malacca, and Singapore information; calculating soil capacity analysis; Japan Aids to Medang, and Tanjung
Straits in The Republic of Indonesia preparing geotechnical technical specification Navigation Association
Malacca, and Singapore Straits (JANA)) Berakit)
in The Republic of Indonesia
Supervision of all related construction works;
Supervision of Tarakan Port July – December Supervision of All Port Facility monthly progress reporting; material approval; Ministry of
96 quality control, and assurance; schedule East Borneo Province
Facility Construction Phase II 2006 Construction planning, and controlling; shop drawing, and Transportation
technical specification review
Supervision of all related construction works;
monthly progress reporting; material approval;
97 Supervision of Tarakan Port July – December Supervision of All Port Facility quality control, and assurance; schedule Ministry of East Borneo Province
Facility Construction Phase II 2006 Construction Transportation
planning, and controlling; shop drawing, and
technical specification review
Supervision of all related construction works;
98 Supervision of Tarakan Port July – December Supervision of All Port Facility monthly progress reporting; material approval; Ministry of East Borneo Province
Facility Construction Phase I 2005 Construction quality control, and assurance; schedule Transportation
planning, and controlling; shop drawing, and
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
technical specification review
- Supervision of all related construction
works; monthly progress reporting; material
approval; quality control, and assurance;
Small Ports Development Project - Supervision of All Port Facility
In Eastern Indonesia Construction for Small Ports schedule planning, and controlling; shop
drawing, and technical specification review
(JBIC LOAN IP-492) : - Study of Regional work - Performing analysis regional work
1. Detailed Design/ Review environment, and interests
Design; Masterplaning on Port environment, and interest for support on
the part of planning port infrastructure.
2. Tendering Asssitance; November 2001 – Infrastructure Facilities, Safety - Collecting data from government to support Ministry of Eastern Indonesia
99 3. Construction Supervision; Sailing Study, Anchorage, and
4. Maintenance; November 2005 Ocean Water Utilities, identify, and analysis on pre -feasibility Transportation
study
5. MIS (Management Transportation Analysis, Land - Performing analysis including intermodes
Information System); Trsnportation Backup, Benefit on
6. Authorization Documents for Socio-Economic Impact, transportation, and masterplaning; sailing
safety study; social, economic, and
12 Ports (DLKR, and DLKP); Environmental Impact, and Legal environmental impact; financial; technical
7. Master Plan for 15 Ports. Aspects
aspects;, and legal aspects.
- Also providing field surveys which are
related to all the aspects above.
Small Ports Development Project
In Eastern Indonesia
(JBIC LOAN IP-492), Master
Plan for 15 Ports :
1. Master Plan for Tahuna Port
(Sulawesi Utara)
2. Master Plan for Anggrek Port
(Sulawesi Utara)
3. Master Plan for Luwuk Port
(Sulawesi Tengah) Masterplaning on Port Infrastructure Performing analysis including intermodes
4. Master Plan for Banggai Port Facilities, Safety Sailing Study, transportation, and masterplaning; sailing
(Sulawesi Tengah) Anchorage, and Ocean Water Utilities, safety study; social, economic, and
100 5. Master Plan for Wani Port 20 August 2002 – 20 Transportation Analysis, Land environmental impact; financial; technical Ministry of Eastern Indonesia
May 2004 Transportation
(Sulawesi Tengah) Trsnportation Backup, Benefit on aspects;, and legal aspects.
6. Master Plan for Palopo Port Socio-Economic Impact, Environmental Also providing field surveys which are related
(Sulawesi Selatan) Impact, and Legal Aspects to all the aspects above.
7. Master Plan for Bulukumba
(Port Sulawesi Selatan)
8. Master Plan for Bau-bau Port
(Sulawesi Tenggara)
9. Master Plan for Raha Port
(Sulawesi Tenggara)
10. Master Plan for Tj. Redeb
Port (Kalimantan Timur)
11. Master Plan for Tobelo Port
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
(Maluku Utara)
12. Master Plan for Tual Port
(Maluku)
13. Master Plan for Serui Port
(Papua)
14. Master Plan for Nabire Port
(Papua)
15. Master Plan for Manokwari
Port (Papua)
Small Ports Development Project
In Eastern Indonesia
(JBIC LOAN IP-492)
1. Supervision of Labuan Bajo
Port
2. Supervision of Labuan
Menanga Port
3. Supervision of for Maritaing Supervision of all related construction works; Eastern Indonesia
Port monthly progress reporting; material approval; (NTT,
4. Supervision of Kur Port November 2004 – Supervision of All Port Facility quality control, and assurance; schedule Ministry of Moluccas,
101 November 2005 Construction for 12 Small Ports Transportation
5. Supervision of asui Port planning, and controlling; shop drawing, and North Papua &
6. Supervision of Elat Port technical specification review South Papua Province)
7. Capacity Building for Pam
Port
8. Supervision of Mega Port
9. Supervision of Ansus Port
10. Supervision of Atsy Port
11. Supervision of Bayun Port
12. Supervision of Eci Port
As a reference, and guidance in the
preparing the standard cost of
Study Standard Cost of consultancy services activities in the preparation, and review of proposed activities,
05 April – 01 and budget of consultancy services in the field Directorate General of
102 Consulting Services in The Field October 2017 planning, development, and of railway. Given this standard, the entire Railways Jakarta
of Railways development process of infrastructure
of the railway sector. process becomes more structured, effective,
and efficient.
Topographic, and Soil Data in
KM.49+2/4, KM.55+7/8 with
Bangil- Pasuruan, KM. 76+1/7
with Rejoso-Grati, KM.83+5/9, Doing mapping or topographic
Doing mapping or topographic measurements
103 Km.87+0/6 with Grati-Bayeman, 07 November – 31 measurements to get situation images, to get situation images, longitudinal pieces, and PT. Kereta Api Jember
KM.24+800 – KM.25+000 with December 2014 longitudinal pieces, and cross rail, and Indonesia (Persero)
Garahan-Mrawan, Surabaya bridge paths cross rail, and bridge paths
Cross-
Banyuwangi in DAOP 9
Jember
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Soil Data with Drill Machine for
Handling Landslide, and performing baseline replacement
Installation of Ground performing baseline replacement designs,
104 Movement Monitoring at 30 March – 29 designs, retaining designs, and retaining designs, and emergency buffer PT. Kereta Api West Java
May 2015 emergency buffer construction due to Indonesia (Persero)
Emplasemen Station ground motion construction due to ground motion
Bumiwaluya Region DAOP 2
Bandung
Detail Engineering Design (DED)
Replacement of a partial
crossing into a non- invisible
to obtain a substitute construction of a to obtain a substitute construction of a partial
crossing, and makeshift 12 August – 18 partial cross-section into a non-plane cross-section into a non-plane crossing, and PT. Kereta Api
105 construction construction at KM Jakarta
4+ December 2015 crossing, and the design of emergency the design of emergency construction Indonesia (Persero)
construction supporting construction supporting construction
400 at the Jakarta DAOP
1 Batter Emplassement
Area
APPENDIX
LEGAL ASPECT & EQUIPMENT
SPECIFICATION
APPENDIX
LEGAL ASPECT – ONLINE SINGLE SUBMISSION (OSS)
APPENDIX
List of Hydro-Oceanography Survey Equipment
NO EQUIPMENT UNIT QUANTITY
1 Echosounder Odom Hyddrotrack II set 1
2 GPS Geodetic RTK TRIMble N5700 Dual Frekwensi set 1
3 Theodolite Total Station Sokkia unit 1
4 Current Meter OTT set 1
5 GPS Handheld Garmin Etrex II unit 6
6 Camera Pocket unit 8
7 Underwater Camera Pocket unit 2
8 Safety Equipments set 3
9 Accumulator unit 2
10 Tide Gauge unit 1
11 Pile Scale unit 2

List of Survey Equipment


N
EQUIPMENT UNIT VOLUME
O

1 DJI Phantom 4 Advance Drone unit 1

2 DJI Phantom 3 Advance Drone unit 2


APPENDIX
List of Geotechnical Survey Equipment
NO EQUIPMENT UNIT VOLUME
I INSITU TESTING
1. CPT unit 4
2. CPTU unit 2
3. DRILLING MACHINE unit 10
4. SPT EQUIP. unit 10
5. HAND BORING unit 4
6. WATER LEVEL INDICATOR unit 5
7. INSITU PERMEABILITY TEST (SOIL/ROCK) unit 4
8. POCKET PENETROMETER unit 4
9. DIGITAL INCLINOMETER unit 1
10. VIBRATING WIRE PIEZOMETER unit 1
II SOIL MECHANIC LABORATORY
1. OVEN MEMMERT, GERMANY unit 2
2. CONSOLIDATION DEVICE unit 20
3. TRIAXIAL UU/CU DEVICE unit 1
4. SHIEVE SHAKER unit 1
5. ATTERBER LIMIT EQUIPMENT unit 4
6. UCT DEVICE unit 1
7. COMPACTION EQUIPMENT set 2
8. CBR TEST DEVICE unit 1
9. EXTRUDER unit 1
10. INDEKS PROPERTIES TEST EQUIP. unit 20
11. HYDROMETER TEST EQUIP. unit 20
12. DIRECT SHEAR TEST DEVICE unit 1
13. TSS TEST EQUIP. unit 10
YBM – 01
CAPACITY
Nominal Drilling Depth 60 m (150 m by factory)
40.5MM Rod (40.5 350 m
mm)
AW Rod (43.6 mm) 240 m
SWIVEL HEAD
Spindle Bore 48 mm
Spindle Stroke 500 mm
B-Speed : 150, 239, 540
Spindle Revolution
rpm
A-Speed : 103, 164, 371
Spindle Revolution
rpm
Maximum Thrust 27.3 kN (2,790 kgf)
Maximum Balance 32.5 kN (3,320 kgf)
TRANSMISSIONS
Number of Speed 3 - Speed Forward
Type of Change Gears Sliding Gear
HOIST
Planetary Gear Brake
Type of Hoist
Band
Drum Capacity 9 mm DIA x 38 m wires
Hoisting Capacity 14.7 kN (1,500 kgf)
Screw Chuck Rod = AW or 40.5mm size
Weight of Drill
435 kg
Machine
DIMENSION
1,550 mm x 700 mm x
Dimension(L*W*H)
1,310 mm
ENGINE YAMMAR TF-110
Type Water Cooled, 4 Cycle
Continuous Output 11 PS / 2,400 rpm
WEIGHT
Weight of Engine 102 kg
Weight of Drill
435 kg
Machine
Total Weight 537 kg
YBM – 05
CAPACITY
Nominal Drilling Depth 40 m (50 m by factory)

40.5MM Rod (40.5 mm) 110 m

AW Rod (43.6 mm) 80 m (Option)

SWIVEL HEAD
Spindle Bore 48 mm ( Option 46 mm )

Spindle Stroke 500 mm

Spindle Revolution 115, 220, 450 min-1

Spindle Revolution 57, 110, 225 min-1

Maximum Thrust 21.8 kN ( 2,220 kgf )

Maximum Balance 27.0 kN ( 2,750 kgf )

TRANSMISSIONS
Number of Speed 3 - Speed Forward
Type of Change Gears Sliding Gear
HOIST
Type of Hoist Planetary Gear Brake
Band
Drum Capacity 9 mm DIA x 20 m wires
Hoisting Capacity 4.9 kN (500 kgf)

HYDRAULIC CHUCK (OPTION)


Weight of Drilling Unit 280 kg

DIMENSION
1.040 mm x 700 mm x
Dimension(L*W*H)
900 mm
ENGINE
Type Water Cooled, 4 Cycle
Continuous Output 7.5 PS / 2,400 min-1
Rated Output At 1 Hour 8.5 PS / 2,400 min-1

WEIGHT
Weight of Engine 280 kg
Weight of Drill Machine 85 kg
Total Weight 365 kg
TOHO

TECHNICAL SPECIFICATION
I.D.of spindle (mm)Spindle speeds (rpm) 58
(A) 60:120:230:360
Spindle speeds (rpm) (B) 100:190:360:560
(C) 130:260:500:770
(A) 0.88 {90kgf・m}
Torque (kN・m) (B) 0.53 {54kgf・m}
(C) 0.40 {41kgf・m}
Stroke of spindle (mm) 500
Thrust force (kN) 22.1 {2250kgf}
Balance force (kN) 29.5 {3010kgf}
Slide System Oil hydraulic: stroke 400
Power 5.5kW/4P or
Dimensions 12~15PS/1800r.p.m.
(L x W x H) (mm) 1780 x 870 x 1620
Mass (kg) 680
SONDIR
Capacity : 0 – 50 kg/cm2
0 – 250 kg/cm2
Bikonus and Konus
Manometer (2 unit)
ECHOSOUNDER ODOM HYDROTRACK II

TECHNICAL SPECIFICATION
Operator selectable High resolution 8 dot/mm (203 dpi); 16 gray
through menu – 24, 28, 33, shades; 216mm (8.5 in) wide thermal paper;
Frequency Agile Printer
40, 100, 120, 200, 210 and External ON/OFF switch; paper advance
340 kH control
368 mm (14.5 in) H x 419 mm (16.5 in) W x 203
Output Power 600 watts Dimensions
mm (8 in) D
Power
11-28 V DC Weight 22.5 lbs (10.2 kg)
Requirement
4 Line x 20 character display Chart Feed
OFF/STBY/LOW/ MED/HI power settings
Display
Separate panel overlays for display and chart
Resolution 0.1 ft / 0.01m Panel
controls Chart ON/OFF with LED inside Keypad
Layout
(arrow keys) Chart Advance Power Sensitivity
Gain
200 kHz – 1cm (0.1% of
depth value (corrected for
MRU Annotates chart Heave corrects data
sound velocity), 33 kHz –
Accuracy Sensor I/O Embeds position in Ethernet packet Outputs
10cm 0.1% of depth value
MRU data in Ethernet packet
(corrected for sound
velocity)
Maximum Depth TOH’s Windows based software included:
600m or 1800 ft. Software
Range eChart Display, Control & Logging Software
200 kHz or 340 kHz side scan transducer Wide
selection of transducers Remote display Lid
Operating 0° - 45° C
Environmental : Options with window Transit case with wheels Internal
Storage -20° - 45° C
GPS with WAAS differential orrections and PPS
reference signal Antenna upgrade
2 RS232 ports or 1 RS232
and RS422 8 bit data
Communication
Ethernet port 1600
samples/ping
DJI PHANTOM 3 ADVANCE
SPCESIFICATIONS
Weight with Battery and
Propellers
1280 gram

Diagonal Lenght
including Propellers
590 mm

+/- 10cm vertical,


Hover Accuracy
+/- 1cm horizontal

16m/s (ATTI mode,


Max Speed
no wind)

Mobile App DJI Pilot

iOS 8.0 or later,


Required Operating
System
Android 4.1.2 or
later
DJI PHANTOM 4
SPCESIFICATIONS
Weight with Battery
and Propellers
1380 gram

Diagonal Lenght
including Propellers
600 mm

+/- 0,1 m vertical,


Hover Accuracy
+/- 0,3 m horizontal

20 m/s (ATTI mode,


Max Speed
no wind)

Mobile App DJI Pilot

iOS 8.0 or later,


Required Operating
System
Android 4.1.2 or
later

You might also like