CONCES SIO N
a. Study of Legal, and Institutional Aspects
Review of Technical Aspects
b. Study of Economic, and Commercial
Analyze potential forms of cooperation
Feasibility Aspects.
Feasibility Study (FS) that can be carried out for Ports
c. Business Plan Review. Study of Value For
Concession documents as well December 2022 – cooperation, assess the feasibility of PT. RANJI KARYA Mahakam Block, East
1 Money (Vfm) Fsf Documents. Study of
as preparation of Draft Port March 2023 PPP collaboration with Business SAMUDERA Kalimantan Province
Environmental, and Social Aspects
Terminal Concession Contracts Entities, and prepare transaction
d. Study on the Form of Cooperation in the
documents
Provision of Infrastructure. Assessment of
Government Support Needs, and/or
Government Guarantees
Project Management Unit (PMU) 1.Inventory, monitor, and evaluate systems and
Assist the implement a management SmAY 17oro Kempo
on the Implementation of Special procedures in monitoring and reporting. Ministry of
system in terms of Monitoring and Port, Labuhan Haji
Allocation Fund (DAK) Activities May 17, 2022 – 2.Take inventory of problems that exist in the Transportation
2 Evaluation of the Management of the Port, Tawun Port,
for Fiscal Year 2022 Water December 7, 2022 implementation of Monitoring and Reporting. (Directorate General of
Physical Special Allocation Fund (DAK) Labuhan Aji Pier, Moyo
Transportation Sub-Sector 3.Collect action program reports for each Sea Transport)
for the 2022 Fiscal Year. Island
Marine Transportation monitoring and reporting preparation activity.
Feasibility Study Of New Port January 27, 2022 – Efforts to accelerate the development of Palembang, and South
3 Feasibility Study PT. Surveyor Indonesia
Palembang, Tanjung Carat Port June 30, 2022 seaports in Tanjung carat, new Palembang, Sumatra
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
south Sumatra. The planned development of
seaports Palembang new primarily targeted to
be able to provide support to activities in an
optimum. national logistics
Services include:
conduct concession's FS
presenting the FS result
Feasibility Study Of Nipah STS provides facilitation to BPKP/ Inspector
April 25, 2022 – July Special Terminal Port concession's PT. Pelabuhan Batam, Riau Islands
4 (Ship To Ship Transfer) Council
13, 2022 conversion to Public Terminal Port Indonesia Province
Concession provides contract arrangement facilitation
PPP PROJECT
1.Assistance to GCA in the process of financial
close by BUP to PPPs that have completed
transactions;
2.Assistance to the GCA and the Control Team
in implementing the PPP Agreement control,
including providing input, review, and
evaluation of the Control Documents
As an evaluation and/or monitoring at
prepared by the Control Team and the
each stage of the PPP, both those that
processes and stages by the PPP
have carried out the transaction phase
agreement on the PPP that has completed Ministry of
Assistance in the Implementation and those that have just been
the transaction; Transportation
of Government Cooperation with May 20, 2022 – proposed by the Business Entity so
1 3.Assistance to the GCcanPPP stage whose (Central Port Function -
Business Entities (PPP) in the December 30, 2022 that each stage can be carried out
studies are prepared by agencies outside the Improvement Work
Port Sector properly, quickly, maintains
GCA, including providing input, reviewing Unit)
independence and can fulfill the
and evaluating the PPP process and/or
principles of implementing cooperation
planning documents that have been
projects in the port sector.
prepared;
4.Management of the implementation of the
PPP agreement that has been implemented,
including schedule arrangements and quality
control of each stage in the PPP agreement;
5.Assistance to GCAs or other stakeholders in
obtaining other necessary approvals or
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
permits, including the preparation of the
necessary documents or regulations.
6.Communicating and coordinating intensively
with GCA, Control Team, Implementing
Business Entity, consultants and related
parties in every stage of the port sector PPP.
Need Analysis, Certainty that the PPP has
The main objective of this activity is to a technical, and economic rationale based
PT. Penjaminan
examine the potential implementation on the analysis of available secondary data
Infrasttuktur Indonesia
Consulting services for Tanjung April 16- Mei 16, of the Public Private Partnership (PPP) Projected sustainable demand for the
2 (Persero) / Indonesian Palembang
Carat Port Sector Studies 2021 scheme in the Tanjung Carat Port Project Economic Area, and measured by
Infrastructure
project which will be outlined in the the inadequacy of services, both in
Guarantee Fund
form of a PPP Preliminary Study. quantity, and quality, based on the analysis
of available secondary data.
Life Cycle Cost Analysis
Alternative Dam Optimization Function
Feasibility Analysis Optimization of Dam Ministry Of National
Study Implementation of Public-
Function Development Planning/
Private Partnership for Dam Analyze the potential forms of possible
Institutional Analysis for Optimizing Dam National Development Batutegi, Kedung
3 Management Based on Life 2020 cooperation that can be carried out for
Functions Planning Agency Ombo, Bali dan pengga
Cycle Cost of Dam dam management
Development of a PPP scheme related to Republic of Indonesia
Dam management (BAPPENAS)
Development of PPP funding scheme, and
funding sources.
Review, and complete the final of the FBC
DGST
Port of Patimban, technical March 2020 - Technical Assitance for transaction report
4 (Directorate General of Patimban
assistance for PPP transactions. December 2020 Phase Prepare PQ dan RFP document
Sea Transport)
Prepare a Draft Contract Agreement
Port of Murhum Baubau, FBC & Finalization FBC document DGST
April 2020 – Bau-Bau, Southeast
5 Technical assistance for Technical Assitance for preparing Review, and complete the final FBC report (Directorate General of
December 2020 Sulawesi Province
transaction transaction Phase Sea Transport)
Airport of Kediri & Labuan Bajo, Contract Review for Bajo Review of Bajo demand DGCA
Oktober-December Labuan Bajo, NTT
6 technical assistance & Technical Assitance for preparing Review of Bajo contract (Directorate General of
2020 Kediri, East Java
transaction for PPP (KPBU) transaction Phase (Unsolicited) Review of FBC document for Kediri Civil Aviation)
Port of Bitung, prefs for PPP February – April, Analyze the potential of Bitung port Collecting data DGST
7 North Sulawesi
unsolicited, 2019 Demand, Finacial & Legal Analisys (Directorate General of
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
Sea Transport)
Prepare the document for Private Partnership
Program in Anggrek Port to qualify the DGST (Directorate
Port of Anggrek, PPP October-December
8 Capture initial picture of Anggrek Port standards, and regulations, and regulations, General of Sea North Sulawesi
prelimanary study 2018
Performing PPP study to choose the suitable Transport)
port operator in Anggrek Port
Prepare the document for Private Partnership
Program in Kaimana & Serui Port to qualify
DGST (Directorate
Port of Kaimana & Serui , OBC Agustus-December Analyze the potential of Kaimana & the standards, and regulations, and
9 General of Sea Papua
study 2018 Serui port regulations, Performing PPP study to choose
Transport)
the suitable port operator in Kaimana & Serui
Port
Prepare the document for Private Partnership
Program in Dobo & Pomako Port to qualify
Analyze the potential of Dobo & DGST (Directorate
Port of dobo & pomako, OBC Agustus-December the standards, and regulations, and
10 Pomako port General of Sea Molucas
study 2018 regulations, Performing PPP study to choose
Transport)
the suitable port operator in Dobo & Pomako
Port
Prepare the document for Private Partnership
Program in Patimban Port to qualify the
DGST (Directorate
Port of Patimban, PPP OBC & 22 June 2017- 18 standards, and regulations, Comprehensive Patimban, Subang,
11 Study OBC & FBC General of Sea
FBC December 2017 Backup Area business plan, and regulations, West Java
Transport)
Performing PPP study to choose the suitable
port operator in Patimban Port
A study to develop guidance for
government in dredging work
Performing market study, technical analysis,
Study Implementation of concession. This study considering
19 June – 26 October legal analysis, economic, and financial Ministry of
12 concession (PPP) for land, and some aspects such as regulation, North Sumatera
2015 analysis, as well as several related field Transportation
building for third party operation, and availability of dredging
studies.
vessels, and business aspects from
dredging work.
Develop standard output documents to 1. Reviewing regulations related to the State
Employment of Consultancy
accelerate the process of submitting Budget, and PPP inside planning, and Ministry Of National
Services in the Preparation of
budgets for allocation of PPP budgeting system; Development Planning/
Standard Documents for Sector October 8, 2018 -
13 implementation, this study also 2. Analyze synchronization of government National Development Indonesia
Cooperation between December 31, 2018
produces a web-based database budget schedules, and submission of Planning Agency
Government, and Business
development system so that it can real- budget for APBN, and PPP allocations; Republic of Indonesia
Entities (PPP)
time analyze the feasibility of projects 3. Identify documents needed in submission
DESCRIPTION OF SERVICE PROVIDED
NO. PROJECT PERIOD CLIENT LOCATION
PROJECT BY COMPANY
to be carried out in PPP. the government budget;
4. Identify the document load in accordance
with the regulations apply;
5. Compile the standard sector documents
needed for government budget
submission;, and Develop a standard
document web-based database system
needed for government budget
submissions
Bathimetri;
Ministry of
11 Port of Calabay,DED 2020 Review Design Strucute test Transportation Nusa tenggara barat
Soil test
SWIVEL HEAD
Spindle Bore 48 mm ( Option 46 mm )
TRANSMISSIONS
Number of Speed 3 - Speed Forward
Type of Change Gears Sliding Gear
HOIST
Type of Hoist Planetary Gear Brake
Band
Drum Capacity 9 mm DIA x 20 m wires
Hoisting Capacity 4.9 kN (500 kgf)
DIMENSION
1.040 mm x 700 mm x
Dimension(L*W*H)
900 mm
ENGINE
Type Water Cooled, 4 Cycle
Continuous Output 7.5 PS / 2,400 min-1
Rated Output At 1 Hour 8.5 PS / 2,400 min-1
WEIGHT
Weight of Engine 280 kg
Weight of Drill Machine 85 kg
Total Weight 365 kg
TOHO
TECHNICAL SPECIFICATION
I.D.of spindle (mm)Spindle speeds (rpm) 58
(A) 60:120:230:360
Spindle speeds (rpm) (B) 100:190:360:560
(C) 130:260:500:770
(A) 0.88 {90kgf・m}
Torque (kN・m) (B) 0.53 {54kgf・m}
(C) 0.40 {41kgf・m}
Stroke of spindle (mm) 500
Thrust force (kN) 22.1 {2250kgf}
Balance force (kN) 29.5 {3010kgf}
Slide System Oil hydraulic: stroke 400
Power 5.5kW/4P or
Dimensions 12~15PS/1800r.p.m.
(L x W x H) (mm) 1780 x 870 x 1620
Mass (kg) 680
SONDIR
Capacity : 0 – 50 kg/cm2
0 – 250 kg/cm2
Bikonus and Konus
Manometer (2 unit)
ECHOSOUNDER ODOM HYDROTRACK II
TECHNICAL SPECIFICATION
Operator selectable High resolution 8 dot/mm (203 dpi); 16 gray
through menu – 24, 28, 33, shades; 216mm (8.5 in) wide thermal paper;
Frequency Agile Printer
40, 100, 120, 200, 210 and External ON/OFF switch; paper advance
340 kH control
368 mm (14.5 in) H x 419 mm (16.5 in) W x 203
Output Power 600 watts Dimensions
mm (8 in) D
Power
11-28 V DC Weight 22.5 lbs (10.2 kg)
Requirement
4 Line x 20 character display Chart Feed
OFF/STBY/LOW/ MED/HI power settings
Display
Separate panel overlays for display and chart
Resolution 0.1 ft / 0.01m Panel
controls Chart ON/OFF with LED inside Keypad
Layout
(arrow keys) Chart Advance Power Sensitivity
Gain
200 kHz – 1cm (0.1% of
depth value (corrected for
MRU Annotates chart Heave corrects data
sound velocity), 33 kHz –
Accuracy Sensor I/O Embeds position in Ethernet packet Outputs
10cm 0.1% of depth value
MRU data in Ethernet packet
(corrected for sound
velocity)
Maximum Depth TOH’s Windows based software included:
600m or 1800 ft. Software
Range eChart Display, Control & Logging Software
200 kHz or 340 kHz side scan transducer Wide
selection of transducers Remote display Lid
Operating 0° - 45° C
Environmental : Options with window Transit case with wheels Internal
Storage -20° - 45° C
GPS with WAAS differential orrections and PPS
reference signal Antenna upgrade
2 RS232 ports or 1 RS232
and RS422 8 bit data
Communication
Ethernet port 1600
samples/ping
DJI PHANTOM 3 ADVANCE
SPCESIFICATIONS
Weight with Battery and
Propellers
1280 gram
Diagonal Lenght
including Propellers
590 mm
Diagonal Lenght
including Propellers
600 mm