Professional Documents
Culture Documents
Recommendations On Handling Dosing and Mixing
Recommendations On Handling Dosing and Mixing
Glued Loose
HANDLING - Gloves and eye protection must be used! - Gloves and eye protection must be used!
- No stacking - No stacking
DOSING 5 min.
• Bags are non degradable
Introduce fibres with sand and Introduce fibres with sand and
aggregates aggregates
Add fibres to fresh mixed concrete Add fibres to fresh mixed concrete
Never add fibres as a first component Never add fibres as a first component
Plant mixer
Never add fibres as a first component Never add fibres as a first component
Never fill drum completely with Never fill drum completely with
concrete in order to achieve even concrete in order to achieve even
fibre distribution fibre distribution
MIXING
Mixing time depends on the efficiency Mixing time depends on the efficiency
of the mixing equipment of the mixing equipment
DO: drum rotation speed > 12 rpm DO: drum rotation speed > 12 rpm
5 min. - Mixing time: after adding all fibres, mix - Mixing time: after adding all fibres, mix
1 minute/m3 concrete and not less than 5 min 1 minute/m3 concrete and not less than 5 min
PUMPING Hose diameter > 1,5 x fibre length Hose diameter > 1,5 x fibre length
For complicated pump lines or concrete For complicated pump lines or concrete
compositions, a trial is recommended prior compositions, a trial is recommended prior
to execution to execution
Bekaert is provided to support you for all questions regarding the dosing, mixing and placing of fibre concrete or any exception
Dramix® OL Types Duomix® Synmix®
- Gloves and eye protection must be used! - Gloves and eye protection must be used! - Gloves and eye protection must be used!
Never introduce fibres with sand and Introduce fibres with sand and Introduce fibres with sand and
aggregates aggregates aggregates
Add fibres to fresh mixed concrete Add fibres to fresh mixed concrete Add fibres to fresh mixed concrete
Never add fibres as a first component Never add fibres as a first component Never add fibres as a first component
DO NOT: not possible to dose Never add fibres as a first component Never add fibres as a first component
OL fibres in the truckmixer
Never fill drum completely with Never fill drum completely with
concrete in order to achieve even concrete in order to achieve even
fibre distribution fibre distribution
Mixing time depends on the efficiency - Mixing time depends on the efficiency - Mixing time depends on the efficiency
of the mixing equipment of the mixing equipment of the mixing equipment
DO NOT: not possible to dose DO: drum rotation speed > 12 rpm DO: drum rotation speed > 12 rpm
OL fibres in the truckmixer - Mixing time: after adding all fibres, mix - Mixing time: after adding all fibres, mix
1 minute/m3 concrete and not less than 5 min 1 minute/m3 concrete and not less than 5 min
Before using fibre concrete, a Before using fibre concrete, a Before using fibre concrete, a
preliminary test must be done preliminary test must be done preliminary test must be done
Special pump test program is required Hose diameter > 1,5 x fibre length Hose diameter > 1,5 x fibre length
For complicated pump lines or concrete For complicated pump lines or concrete
compositions, a trial is recommended prior compositions, a trial is recommended prior
to execution to execution
• Just-in-time deliveries
Dramix® TANKER:
• Exact dosing of the Dramix® steel fibres
• Increased productivity
Bekaertstraat 2
BE-8550 Zwevegem
T+ 32 56 76 61 10
F +32 56 76 79 47
infobuilding@bekaert.com
www.bekaert.com/building
All mentioned trademarks are registered trademarks owned by NV Bekaert SA.
© 2008 Bekaert