SEAI EXEED Process

Planning and Design Implementation Operation

Concept Basic Detailed Construction Commissioning Handover Asset in operation


A1 engineering A2 engineering A3 engineering B

Stage 1 grant Stage 2 grant Site inspection Stage 2 grant


application * application * Stage 2 grant payment retainer released

SEAI EXEED Verified


SEAI EXEED Designed and/or SEAI EXEED
Context, scope & roles
certification can Managed certification
be achieved can be achieved
Identification of risks
and opportunities

EED Project
Execution Plan

Energy balance study

Challenge and analyse

Design for Energy Management

EED Summary Report Measurement and


verification of energy
savings

* A letter of offer from SEAI must be received before works can commence at Stage 1 & Stage 2
Stage 1 grants support EXEED Planning and Design activities. Ideally, the EXEED process will begin as
early as possible in a project but is is possible to begin at any stage before the design is finalised and the
implementation period begins. Stage 1 grant payment takes place once Stage 1 activities are completed.
Measurement and verification of the project should entail a comparison of energy performance in
operation ( B ) against the baseline design ( A1 , A2 , or A3 , as applicable)