This weekly progress report provides details of a 3D seismic survey project in Bangladesh. It outlines that 140 personnel from China, Bangladesh, and other countries are involved in the project. Activities during the week included starting to stake out source and receiver points, visiting local communities, constructing a fly camp, conducting safety trainings, and scouting a marsh area. Plans for the next week include continuing construction, personnel mobilization, equipment maintenance, technical trainings, field operations, and community visits. No additional assistance is required from the client at this time.
Original Description:
weekly report
Original Title
Progress Weekly Report of Seismic Operation-Block 13&14-ZAKIGANJ(20230901)
This weekly progress report provides details of a 3D seismic survey project in Bangladesh. It outlines that 140 personnel from China, Bangladesh, and other countries are involved in the project. Activities during the week included starting to stake out source and receiver points, visiting local communities, constructing a fly camp, conducting safety trainings, and scouting a marsh area. Plans for the next week include continuing construction, personnel mobilization, equipment maintenance, technical trainings, field operations, and community visits. No additional assistance is required from the client at this time.
This weekly progress report provides details of a 3D seismic survey project in Bangladesh. It outlines that 140 personnel from China, Bangladesh, and other countries are involved in the project. Activities during the week included starting to stake out source and receiver points, visiting local communities, constructing a fly camp, conducting safety trainings, and scouting a marsh area. Plans for the next week include continuing construction, personnel mobilization, equipment maintenance, technical trainings, field operations, and community visits. No additional assistance is required from the client at this time.
3D Seismic Survey Under Sylhet Gas Fields Limited (SGFL)
Progress Weekly Report of Seismic Operation
Project Name: 3D Seismic Survey at relinquished area of Block-13 & 14 Crew No.:8632B Date: 01st Sep, 2023
1. People on Board (POB)
Personnel Chinese Senior Junior Labor Visitor
Number 18 6 38 78
Total 140
2. Progress up to This Week
a) Survey section started staking out source points and receiver points for this project.
b) Local communities related to seismic operation were visited by the PRO
section.
c) The fly camp construction was ongoing.
d) Safety driving training of drivers was conducted by senior supervisor.
e) Technical training was conducted by the QC section.
f) Marsh area of Zakiganj Prospect was scouted by Drilling section and
loading section.
g) Drilling equipment was maintained by Drilling section.
h) HSE training was conducted for all available staffs.
3. Plan for Next Week
a) Continue fly camp construction. b) Personnel mobilization and recruiting some new staffs should be continued. c) Drilling rig maintenance and debugging should be continued. d) Technical training should be continued for each section. e) Survey section continue to operate in the field. f) Visiting local communities related to seismic operation should be continued. BGP Inc., China National Petroleum Corporation, Bangladesh Branch Sheba House 6th Floor, Plot# 34,Road# 46, Gulshan North Commercial Area, Bangladesh Website: http://www.bgp.com.cn 1 3D Seismic Survey Under Sylhet Gas Fields Limited (SGFL) g) HSE training for all available staffs should be continued.
4. Help Required from Client
At this moment, there is no requirement for logistic assistance from the client.
Party Chief: Zhou Mingjun
BGP Inc., China National Petroleum Corporation, Bangladesh Branch
Sheba House 6th Floor, Plot# 34,Road# 46, Gulshan North Commercial Area, Bangladesh Website: http://www.bgp.com.cn 2