You are on page 1of 1

CONSTRUCTION CHECK SHEET

Orifice Plate Inspection / Installation


INSTRUMENTATION

«BarcodeItem»
SON-I-003A
Sheet - 1 of 1

Unique ID: «DocName»


Tag: «strTaggedItemTagNo» Tag Description: «strTaggedItemDescription»
Sub-System: Sub-System Description:
«strSubSystemGenericNodeNumber» «strSubSystemGenericNodeDescription»
Location: «Physical_LocationTaggedItem» Contract No.: «UserName»

Manufacturer: «strFullName» Model No: Serial No: «strSerialNos»


«Model_NoTaggedItem»
Loop Drawing:
P&ID No: «strPrimaryPandID»
«Loop_Diagram_ReferenceTaggedItem»

Item Description of Checks/ Actions to be Performed Initial Date


Comp. Contr.

1 Confirm orifice plate is not damaged or shows signs of corrosion.


Check upstream orifice marking contain the following :

 the word "upstream"


2  the tag number
 the ANSI flange class, followed by class code _______
 the nominal size in DN (in mm)
 the measured orifice diameter d (in mm)
Check that the surface finish of the throat and plate are free from visible scratches
3
and indentations.
Check throat edges are sharp and free from burrs. Check that there is no light
4
reflected from the corners of the square edge plates.
Confirm that the location and size of the bleed hole / vent hole (where applicable)
5
conforms to requirements for Orifice type.
Required Data to be Noted:

c
b Tag of Orifice Plate Stamped with Correct Tag No.
and Orifice Size.
a a Note: Tag detail to be on Upstream Side of Plate
b
c

Calibration Results:
Specified OD Actual OD
6 Specified ID Actual ID
Flow element
Material
correctly stamped
YES NO
Specified Thickness Actual Thickness

Comments:

Completed By Approved By Accepted By Witnessed By


Company
Signature
Print Name
Date of Signing
Date Printed: 4-Sep-23 CRX-4571-CMS-FRM-SON-0000-00027-00 U02

You might also like