MERALCO
WEATHER HEAD
SERVICE DROP
(Auxiliary Cap)
(Single Phase, 230V, 60Hz)
CONCRETE PEDESTAL
(See Structural Details)
WEATHER HEAD
(Service Entrance Cap)
4500
LINE SIDE CONDUIT
(Use: Rigid Steel Conduit)
1700
1500
CONCRETE PEDESTAL
(@ PROPERTY LINE, See Structural Details)
250
METAL CLAMPS
(Provision 2ft. - 2.5ft apart)
METER BASE
WATERTIGHT THREADED
(Must be properly secured,
not tilted, not inverted)
CONDUIT CONNECTOR
CONCRETE PEDESTAL
(See Structural Details)
4500
LOAD SIDE CONDUIT
(Use: Polymerizing Vinyl Chloride)
METAL CLAMPS
(Provision 1ft-1.5ft Apart)
1700
1500
250
THIS DRAWING AND OTHER ENGINEER: PROJECT TITLE: DEVELOPER: SHEET CONTENT: REVISIONS: REVISED BY: DATE DRAWN BY: SIGN/DATE SHEET NO.:
DOCUMENTS ARE INTELLECTUAL
Jan 03, 2022 Engr. Lito Hina
PROPERTY OF METROSTAR KILOWATT-HOUR METER POLE DETAILS 1
REALTY AND DEVELOPMENT INC. TWO STOREY UNIT
IT IS UNLAWFUL TO DUPLICATE OR
TO MAKE COPIES OF SAID
SINGLE ATTACHED 01 MODEL METROSTAR 2
3
CHECKED BY:
Engr. Lito Hina E-2
DOCUMENTS WITHOUT THE EMINENZA RESIDENCES IV REALTY & DEVELOPMENT INC. 4
Ar. Mark Villegas
Ar. Edmyrson Lipana
WRITTEN CONSENT OF THEIR
ARCHITECT. ALL DRAWINGS AND PRC No.: PTR No.: (ALTA PRIMA) 5 APPROVED BY:
DOCUMENTS ARE TO BE KEPT FOR
REFERENCE. (R.A. 9266) TIN No.:
ISSUED ON: ISSUED AT:
LOCATION: BAYANI ROAD, BRGY. TUNGKONG MANGGA,
CITY OF SAN JOSE DEL MONTE, BULACAN
ADDRESS: 839 EDSA SOUTH TRIANGLE, QUEZON CITY PROJECT NO.:
Ar. John Henson
Mr. Eugene Eugenio
2 2