You are on page 1of 1

HANDOVER PACKAGES COMPLETION DATES

CONTRACTOR RFC ACHIEVED

ISLANDS RESCHEDULED
LEGEND

ISLANDS NOT MAKING CONTRACTOR RFC AT PLANNED DATE


AND STILL OUTSTANDING

CRITICAL AREAS

Focus this week ACTUAL HANDOVER DATE

H1 H2 H3 H4 H5

Lay Down Area 1 Lay Down Area 3 Access Road Pebble Crusher
Lay Down Area 2 -
Autogenous (Flotation and South West of Demolition
SMP
Milling Substation Area) Flotation Plant (Ore Sorters)

Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending

24/10/14 31/10/14 07/11/14 14/11/14 21/11/14 28/11/14 05/12/14 12/12/14 19/12/14 26/12/14 03/04/15 10/04/15 17/04/15 24/04/15 01/05/15 08/05/15 15/05/15 22/05/15 29/05/15 05/06/15 12/06/15 19/06/15 26/06/15 03/07/15 10/07/15 17/07/15 24/07/15 31/07/15 07/08/15 14/08/15 21/08/15 28/08/15 04/09/15 11/09/15 18/09/15
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 24 Week 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 47 Week 48
H1 H2 H3 SITE CLOSED H4 H5

Lay Down Area 1 Lay Down Area 3 Access Road Pebble Crusher
Lay Down Area 2 -
Autogenous (Flotation and South West of Demolition
SMP
Milling Substation Area) Flotation Plant (Ore Sorters)

BASE LINE PLAN HANDOVER DATE

H 30

Auto Mill No. 1


Screen O/S
Transfer Conveyor
26 & Associated
Equipment

H 17 H 26 H 31 H 35

Auto Mill No. 1


Ore Sorter No. 2 & Screen O/S
Section 7 Flotation
Associated Transfer Conveyor SMP MCC
Tails Tie-in
Equipment 27 & Associated
Equipment

H6 H 18 H 23 H 27 H 32 H 36 H 44 H 47
Ore Sorter Waste Primary Rougher
Auto Mill No. 1 Secondary Milling
Conveyor 19, Ore Sorter Waste Flotation Cells,
Screen O/S Feed Tank, SMP
Flotation Internal Fire Protection Building Spillage Conveyor 15 & Samplers, Final
Transfer Conveyor Section 1 Milling Final Product
Pipe Rack - Auto Mill Sump & Associated Flotation Sump &
28 & Associated Tank, Pumps
Associated Equipment Associated
Equipment & Tie-ins
Equipment Equipment
H7 H9 H 15 H 19 H 21 H 24 H 28 H 33 H 37 H 39 H 41 H 45 H 48 H 50

Auto Mill No. 1 Secondary Milling


UG Earthing & Primary Cleaner
Ore Sorter Waste Instrument Air Screen O/S Ore Sorter 1 to 5 Pumps, Pre- Earthing & Lightning
Pipe Rack from Lightning Frother Ore Sorter 1 Belt Fire Protection - Road at Flotation Flotation Cells &
Auto Mill MCC Bin & Associated Compressor SMP / Transfer Conveyor Compressor classifying Protection -
Flotation to SMP Protection - Distribution Feeder CV 22 Flotation Substation (Tar) Associated Autogenous Mill
Equipment Flotation 25 & Associated No. 1 / 2 / 3 Cyclones
Autogenous Mill Equipment
Equipment & Tie-ins

H8 H 10 H 11 H 12 H 13 H 14 H 16 H 20 H 22 H 25 H 29 H 34 H 38 H 40 H 42 H 43 H 46 H 49 H 51

UG Earthing & Pipe / Cable Rack Flotation Primary Flotation Primary Re-
Raw & Process Ore Sorter No. 1 & Gland Seal Water Section 4A Final
General Pipe & Lightning from Flotation SMP Transformer Communication Section 8 Flotation Ore Sorter 2 Belt SMP 3.3kV Substation, Feed Surge Tank Cleaner Flotation Earthing & Lightning
PMC Substation Water Make-up & SIBX Distribution Associated Blowers - Flotation Make-up & Concentrate Tie- Protection - Flotation
Cable Racks Protection - Substation to Bay Services Tails Tie-in Feeder CV 23 Substation Control Room & & Associated Cells & Associated
Distribution Equipment Distribution in
Flotation Flotation Transformers Equipment Equipment

Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending Week Ending

25/09/15 02/10/15 09/10/15 16/10/15 23/10/15 30/10/15 06/11/15 13/11/15 20/11/15 27/11/15 04/03/16 11/03/16 18/03/16 25/03/16 01/04/16 08/04/16 15/04/16 22/04/16 29/04/16 06/05/16 13/05/16 20/05/16 27/05/16 03/06/16 10/06/16 17/06/16 24/06/16 01/07/16 08/07/16 15/07/16 22/07/16 29/07/16 05/08/16 12/08/16 19/08/16
Week 49 Week 50 Week 51 Week 52 Week 53 Week 54 Week 55 Week 56 Week 57 Week 58 Week 72 Week 73 Week 74 Week 75 Week 76 Week 77 Week 78 Week 79 Week 80 Week 81 Week 82 Week 83 Week 84 Week 85 Week 86 Week 87 Week 88 Week 89 Week 90 Week 91 Week 92 Week 93 Week 94 Week 95 Week 96
H6 H9 H 11 H 12 H 13 H 14 H 15 H 17 H 21 H 23 H 26 H 30 H 35 H 39 H 41 H 43 H 44 H 47 H 50
Ore Sorter Waste Primary Rougher
Auto Mill No. 1 Secondary Milling
UG Earthing & Pipe / Cable Rack Conveyor 19, Primary Flotation Flotation Cells,
Ore Sorter Waste Ore Sorter No. 2 & Screen O/S Ore Sorter Feed Tank, SMP Earthing & Lightning
Flotation Internal Lightning from Flotation SMP Transformer Communication Frother Section 7 Flotation Building Spillage Road at Flotation Feed Surge Tank Samplers, Final
PMC Substation Bin & Associated Associated Transfer Conveyor SMP MCC Compressor Final Product Protection -
Pipe Rack Protection - Substation to Bay Services Distribution Tails Tie-in Sump & Substation (Tar) & Associated Flotation Sump & Autogenous Mill
Equipment Equipment 26 & Associated No. 1 / 2 / 3 Tank, Pumps
Autogenous Mill Flotation Associated Equipment Associated
Equipment & Tie-ins
Equipment Equipment
H7 H 10 H 16 H 18 H 22 H 24 H 27 H 31 H 36 H 40 H 42 H 45 H 48 H 51

Auto Mill No. 1 Secondary Milling


UG Earthing & Ore Sorter Waste Flotation Primary Cleaner
Screen O/S Gland Seal Water 1 to 5 Pumps, Pre-
Pipe Rack from Lightning Section 8 Flotation Fire Protection Ore Sorter 1 Belt Conveyor 15 & Substation, Flotation Cells & Earthing & Lightning
SIBX Distribution Transfer Conveyor Section 1 Milling Make-up & classifying Protection - Flotation
Flotation to SMP Protection - Tails Tie-in - Auto Mill Feeder CV 22 Associated Control Room & Associated
27 & Associated Distribution Cyclones
Flotation Equipment Transformers Equipment
Equipment & Tie-ins

H8 H 19 H 25 H 28 H 32 H 37 H 46 H 49

Auto Mill No. 1


Primary Re-
Ore Sorter No. 1 & Instrument Air Screen O/S Section 4A Final
General Pipe & Fire Protection - Cleaner Flotation
Auto Mill MCC Associated Compressor SMP / Transfer Conveyor Concentrate Tie-
Cable Racks Flotation Cells & Associated
Equipment Flotation 28 & Associated in
Equipment
Equipment

H 20 H 29 H 33 H 38

Auto Mill No. 1


Raw & Process Screen O/S
Ore Sorter 2 Belt
Water Make-up & Transfer Conveyor Blowers - Flotation
Feeder CV 23
Distribution 25 & Associated
Equipment

H 34

SMP 3.3kV
Substation

You might also like