You are on page 1of 1

Product & Service Delivery

Work Instruction
Preservation Inspection Preservation - Inspection Checklist
Revision: 0 Number: PSD-WIS-US-MFG-001 Revised: 01-03-11

Complete (1) Form per Component or Unit, Fill in S/N# and Date, Check appropiate Boxes, Report Damages, Sign/Date as Complete, Turn into Preservation Department

□ OEM Component Receipt □ OEM Inspection □ Unit Inspection


ENGINE □ Type: Caterpillar G3516 TALE S/N# 3RC01052 Date: COOLER □ Type: Fin X model FX 12 S/N# Date:
□ 1.1 Verify all serial numbers. □ 1.1 Verify all serial numbers.
□ 1.2 Visually inspect component. □ 1.2 Visually inspect component.
* Check for damage and/or missing parts * Check for damage and/or missing parts
* Ensure all openings are sealed * Ensure all openings are sealed
□ 1.3 Use Paint Marker to write Inspection Date on component. * Essure fan is secure from rotation
"PT/I Date" PT= Preservation Team I= Inspection * Ensure shaft is protected and grease is present at bearings

COMPRESSOR □ Type: Gemini FE565D2 S/N# Date: □ 1.3 Use Paint Marker to write Inspection Date on component.
□ 1.1 Verify all serial numbers. "PT/I Date" PT= Preservation Team I= Inspection
□ 1.2 Visually inspect component. PANEL □ Type: Murphy 50-30-2092-V12 S/N# Date: (NOT PRESERVATION)
* Check for damage and/or missing parts □ 1.1 Verify all serial numbers and drawing numbers.
* Check under distance piece for forklift damage □ 1.2 Visually inspect component.
* Check for water in lube box * Check for damage and/or missing parts
* Verify locknuts tightened on lube pump (see photo) * Ensure Desiccant bags are in Panel
* Ensure all openings are sealed * Verify doors are closed and sealed
* Ensure compressor feet are not on ground □ 1.3 Use Paint Marker to write Inspection Date on component.
□ 1.3 Use Paint Marker to write Inspection Date on component. "PT/I Date" PT= Preservation Team I= Inspection
"PT/I Date" PT= Preservation Team I= Inspection

ELECTRIC MOTOR □ Type: N/A ROTARY SCREW □ Type: N/A


□ 1.1 Verify all serial numbers. □ 1.1 Verify all serial numbers.
□ 1.2 Visually inspect component. □ 1.2 Visually inspect component.
* Check for damage and/or missing parts * Check for damage and/or missing parts
* Ensure all openings are sealed * Ensure compressor feet are not on ground
* Ensure heater elements are plugged in □ 1.3 Use Paint Marker to write Inspection Date on component.
□ 1.3 Use Paint Marker to write Inspection Date on component. "PT/I Date" PT= Preservation Team I= Inspection
"PT/I Date" PT= Preservation Team I= Inspection UNIT □ # 732508 Date:
COMMENTS □ 1.1 Complete each OEM Component Inspection requirements.
Notes: □ 1.2 Ensure all openings are sealed
□ 1.3 Ensure flange covers are properly installed

Damages:

Tech. Sign-Off:
Date:
COPYRIGHT © 2009 EXTERRAN HOLDINGS, INC. the controlled version of this document form is stored on the Exterran intranet web site.
FOR INTERNAL USE ONLY - Not to be copied or released without written authorization. Page 1 of 1

You might also like