Analisa Pondasi Site Office Mtbu New XL T4l-92-Medium Light-Gf Rev 5
Analisa Pondasi Site Office Mtbu New XL T4l-92-Medium Light-Gf Rev 5
DESKRIPSI SITE
consultant Project
PRIVATE LTE PAMA
Site Name
OFFICE MTBU NEW XL
Site ID
Tower Type
PT. WHIDIA BHARAYA T4L-92-MEDIUM LIGHT-GF
Jln KATALIA 1, NO 20, RT: 005, RW :008 Foundation Type
Kota Bambu Utara, Palmerah, Jakarta Barat Raft & Pile
Pile
NEW SITE
wb date
04 September 2023
v23.04.07 F
NEW SITE FOUNDATION SUMMARY
SITE NAME : OFFICE MTBU NEW XL
SITE ID :
TOWER DATA
SUPPORT REACTION
Maximum Compress Reaction = 1126.37 kN
FOUNDATION DESCRIPTION
Foundation Type Raft + Pile Slab Dimension 4000 x 4000 mm
Depth of Foundation 1200 mm Ticknes Slab 150 mm
Pedestal Dimension 700 x 700 mm Total Number of Pile 24
Pad Dimension 13200 x 13200 mm Diameter of Pile 500 mm
Ticknes Pad 350 mm L Pile 7600 mm
REMARK
Catatan :
Dewantara M Zahirsah Fachryan Dwi R Reza Kurniawan Bakhtiar
DESIGN CRITERIA
2 STANDARD OF ANALYSIS
3 MATERIALS
NEW SITE
ANALISA PONDASI
DESCRIPTION
Base Width (BW) = 8.442 m Slab
Concrete Cover = 70 mm Dimension (m) = 4 x 4 x 0.15
Number of Pedestal = 4
Pedestal Tie Beam Number of Beam = 0
Pedestal Dimension = 0.7 x 0.7 m Dimension = 0 x 0 m
Above Ground Level = 0.7 m Bottom Elv (-) = 0 m
H Pedestal Under Ground Level = 0.7 m
Pad Pile
Pad Dimension (B) = 13.20 x 13.20 x 0.35 m Total Number of Pile = 24
Depth of Foundation = 1.20 m Dimension = 0.5 m (Diameter)
Number of Pad = 1 Elevation (-) = 8.8 m
MATERIAL SPESIFIKASI
Soil
qc = 17 kgf/cm2
qall = qc / 15 = 1.13 kgf/cm2 = 111.1 KN/m2
Concrete
Specified Compressive strength
K = 25.0 N/mm²
fc = 20.75 N/mm²
Unit weight of Concrete (submerge)
γcsm = 1400 kgf/m³
Concrete strength of factor
β1 = 0.85
Unit weight of Concrete (dry)
γcd = 2400 kgf/m³ = 23.54 KN/m3
Rebar
Unit weight of Steel (γs) = 7850 kgf/m³ = 76.98 KN/m3
Specified Yield strength
fy1 = 280 N/mm² ( to D 10 mm used steel screw U-28 or BJPT-28 )
fy2 = 420 N/mm² ( to D > 13 mm used steel screw U-42 or BJPT-42 )
fy3 = 240 N/mm² ( to Ø 8 mm used plain steel U-24 or BJPT-24 )
Diamater Pad rebar (Prd) = 16 mm D Beam Rebar = 16 mm
Diamater Ped. rebar (Pdrd) = 16 mm D Beam Stirrup = 10 mm
Diamater Ped.Stirrup (Pdsd) = 10 mm D Pile Rebar = 16 mm
Diamater Slab rebar (Srd) = 16 mm D Pile Stirrup = 10 mm
v23.04.07 1 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA
NEW SITE
Pedestal Slab
Volume = 2.74 m3 Volume = 9.60 m3
H Dry = 1.40 m H Dry = 0.15 m
H Submerge = 0.00 m H Submerge = 0.00 m
Dry Weight = 6585.60 kgf Dry Weight = 23040.00 kgf
Surmerge Weight = 0.00 kgf Surmerge Weight = 0.00 kgf
Total Weight = 6585.60 kgf Total Weight = 23040.00 kgf
= 64.58 kN
Tie Beam
Pad Volume = 0.00 m3
3
Volume = 60.98 m H Dry = 0.00 m
H Dry = 0.35 m H Submerge = 0.00 m
H Submerge = 0.00 m Dry Weight = 0.00 kgf
Dry Weight = 146361.60 kgf Surmerge Weight = 0.00 kgf
Surmerge Weight = 0.00 kgf Total Weight = 0.00 kgf
Total Weight = 146361.60 kgf
= 1435.37 kN Existing Foundation
Weight of Concrete = 0 kgf
TOTAL BERAT BETON Weight of Backfill = 0 kgf
3
Total Volume = 73.33 m
Total Weight = 175987.20 kgf Luas Lubang Pad = 0 m2
= 1725.91 kN Volume = 0.00 m3
H Dry = 0.35 m
H Submerge = 0.00 m
Dry Weight = 0.00 kgf
Surmerge Weight = 0.00 kgf
Weight = 0.00 kgf
v23.04.07 2 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA
NEW SITE
PERHITUNGAN VOLUME
v23.04.07 3 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA
NEW SITE
Sliding Capacity
Friction Coefficient (∂fr) = 0.45
Horizontal Force
Fa = 72.91 kN
SFsliding = Fresisting
Fa
SF Overturning = M resisting
M overturning
= 4.50 > 2 (OK)
Bearing Capacity
PCAmats Output = 19103.43 kgf
v23.04.07 4 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA
NEW SITE
Punching Shear
SF Punch Shear = Φ Vc / Vu
= 1.86 > 1.5 (OK)
Displacement Down
v23.04.07 5 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA
NEW SITE
PENULANGAN PEDESTAL
Load Factor (µf) = 1.3
Stirrup Bar
Quantity of section (ns) = 2 strength reduction factor for shear
Horizontal force (Vn) = 94.79 kN Φsh = 0.75
Effective depth (Ef.d) = 612 mm
Nominal shear strength of the concrete
Vcon = Φsh*(bb/6)*Ef.d*√fc Stirrup Spacing
= 243.932 kN s = Av*fy*Ef.d/Vs
Minimum Stirrup Spacing = 284 mm
Flexure Bar
minimum reinforcement area minimum Number of bar
As.minp = 0.01*b.t*b.b Nbar = As.minp/((π/4)*Pdrd2)
= 4900 mm² = 25 or 28
Trial 28
Pcacol Input
Pedestal Dimension = 700 x 700 mm Specified Yield Strength of Steel
Factored Tension = -1184.139 kN fy = 420 N/mm²
Factored Compress = 1464.281 kN
Factored Moment = 132.700 kN.m Specified Yield Strength of Conrete
fc = 20.75 N/mm²
From Pcacol Output
Recommendation :
Ped Bar 28 D 16
Stirrup D 10 - 150
(OK)
v23.04.07 6 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA
NEW SITE
PENULANGAN PAD
Spacing Spacing
s = ( 1000 mm ) / ( n ) s = ( 1000 mm ) / ( n )
s = 287.35 mm s = 103.58 mm
s = 280 mm s = 100 mm
= 200 mm = 100 mm
digunakan tulangan, D16 - 200 mm digunakan tulangan, D16 - 100 mm
v23.04.07 7 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA
NEW SITE
PILE CALCULATION
DESCRIPTION
Pile Dimension (D) 0.5 m
Total Number of Pile (n) 24 Pile
Depth Of Foundation (H Depth) 1.20 m
Bottom Pile Elevation (L Depth) 8.80 m
Specified Compressive Conc. Strength K= 25.0 MPa
fc' = 20.75 MPa
Unit weight of Concrete (Wc) = 2400 kgf/m3
= 23.54 kN/m3
Unit weight of Soil 1600 kgf/m3
Number of Piles in the direction ( n piley ) 2
( n pilex ) 1
Distance of Pile (Sp) 1.5 m
Cross Section Area Ad = p / 4 * D2 = 0.20 m2
= 1964.3 cm2
Perimeter Ro = 3.14 X D = 1.57 m
Circumference Ac = Ro * L 11.94 m2
= 119429 cm2
Weight of Pile Wp = A * L * wc = 3582.86 kgf
REINFORCEMENT
Rebar Diamater (RD) 16 mm
2
Cross Section Area (Ab) Ab = p / 4 * RD = 201.06 mm2
minimum reinforcement area As.minp = 0.01*Ad = 1964.29 mm²
minimum Number of bar N Bar = As.minp/Ab = 10
=> 10 Bar / Pile
Shear Bar
Diameter Pile 500 mm
Spacing Diamater Pile / 2 = 250 mm
=> 150 mm
Recommendation :
Pile Bar 10 D 16
Stirrup ø 10 - 150
Pile Calculation‐1 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA
NEW SITE
Calculation
Compression Capacity of Concrete Pn = 1/3* fc' * A = 1358.63 kN
= 138542.32 kgf
⎛ ⎛ φpile ⎟⎞ ⎟⎞ ⎛ 180 ⎞
Φ := ⎜ atan ⎜ ⋅⎜ ⎟ = 18.43 deg
⎜ ⎜ sp ⎟ ⎟ ⎝ π ⎠
⎝ ⎝ ⎠⎠
Effenciency group of pile (Labbare Convercion)
( ) ( )
⎡⎣ npilex − 1 ⋅ npiley⎤⎦ + npiley − 1 ⋅ npilex
η := 1 − Φ ⋅ 0.90
90 ⋅ npilex ⋅ npiley
Pile Calculation‐2 9/4/2023
FOUNDATION SETTLEMENT
qn = ݍെ ݂ܦ. ܻܾ
E = Modulus Elastisitas
ʅ = Angka Poisson
Ip = Faktor Pengarung untuk beban persegi empat
Ip = 1 െ Ɋ2 F1 + 1 െ Ɋ െ ʹɊ; F2
Ip = 1 െ Ɋ2 F1 + 1 െ Ɋ െ ʹɊ; F2
D = 1.2 M
H = 10.8 M
L = 13.2 M
B = 13.2 M
H/B = 3.272727273 M
L/B = 1 M
F1 = 0.4
F2 = 0.05
q = 15.56 ton/m2
Df = 1.2 m
Yb = 1.6 ton/m2
qn = 13.64
E = 20000 ton/m2
ʅ = 0.5
Ip = 0.3
Si = 0.00270072 m
Si = 2.70072 mm < 150 mm (OK)
Jika P1 <Pc
ܲ1 ܲϬнѐ
ѐe = ݈ݎܥo݃ = ݈ݎܥo݃
ܲ0 ܲ0
Jika P0<Pc<P1
ܲܿ ܲϬнѐ
ѐe = ݈ݎܥo݃ + ݈ܿܥo݃
ܲ0 ܲ0
P0 = Tekanan Overburden
P0 = ݂ܦ. ܻܾ
e0 = Angka Pori
H = Kedalaman Lapisan Tanah
ѐp =
ѐp = 4. ܫ. ݊ݍ
Z = 6 M
L = 3.3 M
B = 3.3 M
L/B = 1 M
B/Z = 0.55 M
L/Z = 0.55
Ip = 0.095
q = 15.56 ton/m2
Df = 1.2 m
Yb = 1.6 ton/m2
qn = 13.64 ton/m2
H0 = 6 m
e0 = 0.87
Cc = 0.3763
Cr = 0.143
P'c = 10.94 ton/m2
P0' = 9.6 ton/m2
ѐp = 5.1832
P'c < WϬнѐƉ
ѐe = 0.078669894
Sc = 0.000252417 m
Sc = 0.252416773 mm
Si-total = Si+Sc mm
Si-total = 2.95314 mm < 150 mm (OK)