ANALISA PONDASI

DESKRIPSI SITE
consultant Project
PRIVATE LTE PAMA
Site Name
OFFICE MTBU NEW XL
Site ID

Tower Type
PT. WHIDIA BHARAYA T4L-92-MEDIUM LIGHT-GF
Jln KATALIA 1, NO 20, RT: 005, RW :008 Foundation Type
Kota Bambu Utara, Palmerah, Jakarta Barat Raft & Pile
Pile
NEW SITE
wb date
04 September 2023
v23.04.07 F
NEW SITE FOUNDATION SUMMARY
SITE NAME : OFFICE MTBU NEW XL
SITE ID :

TOWER DATA

Project PRIVATE LTE PAMA


Tower Type T4L-92-MEDIUM LIGHT-GF
Flood Elv -

SUPPORT REACTION

Maximum Compress Reaction = 1126.37 kN

FOUNDATION DESCRIPTION
Foundation Type Raft + Pile Slab Dimension 4000 x 4000 mm
Depth of Foundation 1200 mm Ticknes Slab 150 mm
Pedestal Dimension 700 x 700 mm Total Number of Pile 24
Pad Dimension 13200 x 13200 mm Diameter of Pile 500 mm
Ticknes Pad 350 mm L Pile 7600 mm

DESIGN OUTPUT SUMMARY


Description Output Comparison Limitation Note
Overtunning / Uplift 4.50 > 2 (OK)
SF Bearing 2.27 > 2.0 (OK)
Sliding 31.98 > 1.5 (OK)
Punch Shear 1.86 > 1.5 (OK)
Displacement Down 2.886 mm < 150 mm (OK)
Penurunan Segera 2.70072 mm < 150 mm (OK)
Penurunan Konsolidasi 2.95314 mm < 150 mm (OK)
Column Bar 28 D 16
Pad Bar D16 - 100

REMARK
Catatan :

Jakarta, 29 Mei 2023

Prepared By, Approved By, Approved By, Approved By,


PT. WHIDIA BHARAYA PT. HUAWEI TECH PT. XL AXIATA PT. PAMAPERSADA
 
INVESTMENT

 
Dewantara M Zahirsah Fachryan Dwi R Reza Kurniawan Bakhtiar
DESIGN CRITERIA

1 DESIGN CODE REFERENCES

The design code and standard of foundation analysis are :


a. American Concrete Institute (ACI 318-02)
b. Persyaratan Perancangan Geoteknik (SNI-8640-2017)
c. Baja Tulangan Beton (SNI 1729-2020)
d. Support Reaksi Tower based on TIA-EIA-222-G

2 STANDARD OF ANALYSIS

The foundation design / analysis tolerances are :


a. Overturning Moment = Minimum 2 (SNI-8460-2017, Point 9.3.3)
b. Sliding Force = Minimum 1.5 (SNI-8460-2017, Point 9.3.3)
c. Uplift Force = Minimum 1.5 (TIA-EIA-222-G)
d. Displacement Down = Minimum <15cm / 150mm (SNI-8640-2017, Point 9.4.5)
e. Penurunan Segera = Minimum <15cm / 150mm (SNI-8640-2017, Point 9.4.5)
f. Penurunan Konsolidasi = Minimum <15cm / 150mm (SNI-8640-2017, Point 9.4.5)

3 MATERIALS

Concrete shall have a compressive strength K250 (fc = 20.75 kN/mm2)


Concrete for work floor shall have a compressive strength K100 (fc = 8.3 kN/mm2)
b. Rebar
Quality of reinforcement concrete used in the following :
- to Ø 8 mm used plain steel U-24 or BJPT-24
Specified minimum yield stress fy : 240 N/mm2
- to D 10 mm used steel screw U-28 or BJPT-28
Specified minimum yield stress fy : 280 N/mm2
- to D > 13 mm used steel screw U-42 or BJPT-42
Specified minimum yield stress fy :420 N/mm2
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA

SITE ID : TOWER TYPE : T4L-92-MEDIUM LIGHT-GF

NEW SITE

ANALISA PONDASI
DESCRIPTION
Base Width (BW) = 8.442 m Slab
Concrete Cover = 70 mm Dimension (m) = 4 x 4 x 0.15
Number of Pedestal = 4
Pedestal Tie Beam Number of Beam = 0
Pedestal Dimension = 0.7 x 0.7 m Dimension = 0 x 0 m
Above Ground Level = 0.7 m Bottom Elv (-) = 0 m
H Pedestal Under Ground Level = 0.7 m
Pad Pile
Pad Dimension (B) = 13.20 x 13.20 x 0.35 m Total Number of Pile = 24
Depth of Foundation = 1.20 m Dimension = 0.5 m (Diameter)
Number of Pad = 1 Elevation (-) = 8.8 m

MATERIAL SPESIFIKASI
Soil
qc = 17 kgf/cm2
qall = qc / 15 = 1.13 kgf/cm2 = 111.1 KN/m2

Ground Water Level (GWL) = 100 m


Angle of back fill (Φbf) = 30 deg
Soil Condition = Dry
Unit weight of Soil (submerge)
γsoilsm = 800 kgf/m³ = 7.85 KN/m3
Unit weight of Soil (dry)
γsoild = 1600 kgf/m³ = 15.69 KN/m3
Unit weight of Water (γw) = 981 kgf/m³

Concrete
Specified Compressive strength
K = 25.0 N/mm²
fc = 20.75 N/mm²
Unit weight of Concrete (submerge)
γcsm = 1400 kgf/m³
Concrete strength of factor
β1 = 0.85
Unit weight of Concrete (dry)
γcd = 2400 kgf/m³ = 23.54 KN/m3

Rebar
Unit weight of Steel (γs) = 7850 kgf/m³ = 76.98 KN/m3
Specified Yield strength
fy1 = 280 N/mm² ( to D 10 mm used steel screw U-28 or BJPT-28 )
fy2 = 420 N/mm² ( to D > 13 mm used steel screw U-42 or BJPT-42 )
fy3 = 240 N/mm² ( to Ø 8 mm used plain steel U-24 or BJPT-24 )
Diamater Pad rebar (Prd) = 16 mm D Beam Rebar = 16 mm
Diamater Ped. rebar (Pdrd) = 16 mm D Beam Stirrup = 10 mm
Diamater Ped.Stirrup (Pdsd) = 10 mm D Pile Rebar = 16 mm
Diamater Slab rebar (Srd) = 16 mm D Pile Stirrup = 10 mm

v23.04.07 1 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA

SITE ID : TOWER TYPE : T4L-92-MEDIUM LIGHT-GF

NEW SITE

SUPPORT REACTION (BEBAN)

Lateral Wind Load


Node FX FY FZ MX MY MZ
2516 69.282 34.568 811.985 0.782 0.078 -0.202
2534 69.852 -34.402 816.707 -0.795 0.083 0.203
2552 57.672 -23.064 -601.212 -0.585 0.274 -0.202
2570 57.899 22.429 -596.484 0.59 0.288 0.203

Diagonal Wind Load


Node FX FY FZ MX MY MZ
2516 31.36 -19.993 103.041 0.736 0.543 -0.312
2534 72.912 -72.806 1126.37 -0.456 -0.454 0
2552 61.015 -61.186 -910.876 -0.252 -0.256 0
2570 19.695 -31.85 112.462 0.537 0.746 0.312

PERHITUNGAN BERAT BETON


Weight = Volume * Unit Weight

Pedestal Slab
Volume = 2.74 m3 Volume = 9.60 m3
H Dry = 1.40 m H Dry = 0.15 m
H Submerge = 0.00 m H Submerge = 0.00 m
Dry Weight = 6585.60 kgf Dry Weight = 23040.00 kgf
Surmerge Weight = 0.00 kgf Surmerge Weight = 0.00 kgf
Total Weight = 6585.60 kgf Total Weight = 23040.00 kgf
= 64.58 kN
Tie Beam
Pad Volume = 0.00 m3
3
Volume = 60.98 m H Dry = 0.00 m
H Dry = 0.35 m H Submerge = 0.00 m
H Submerge = 0.00 m Dry Weight = 0.00 kgf
Dry Weight = 146361.60 kgf Surmerge Weight = 0.00 kgf
Surmerge Weight = 0.00 kgf Total Weight = 0.00 kgf
Total Weight = 146361.60 kgf
= 1435.37 kN Existing Foundation
Weight of Concrete = 0 kgf
TOTAL BERAT BETON Weight of Backfill = 0 kgf
3
Total Volume = 73.33 m
Total Weight = 175987.20 kgf Luas Lubang Pad = 0 m2
= 1725.91 kN Volume = 0.00 m3
H Dry = 0.35 m
H Submerge = 0.00 m
Dry Weight = 0.00 kgf
Surmerge Weight = 0.00 kgf
Weight = 0.00 kgf

v23.04.07 2 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA

SITE ID : TOWER TYPE : T4L-92-MEDIUM LIGHT-GF

NEW SITE

PERHITUNGAN BERAT BACKFILL


Volume = (A+(A*A')2+A')H/3 Submerge Backfill
Weight = Volume * Unit Weight H Submerge (H) = 0.00 m
Bottom Area (A) = 174.24 m2
Total Backfill Top Area (A') = 174.24 m2
Backfill Thickness (H) = 0.85 m Nett Volume = 0.00 m3
Pad Area (A) = 174.24 m2 Submerge Weight = 0.00 kgf
Backfill Top Area (A') = 201.11 m2
Gross Volume (GV) = 159.39 m3 Dry Backfill
Nett Volume (NV) = 148.42 m3 H Dry = 0.85 m
Dry Volume = 148.42 m3
TOTAL BERAT BACKFILL Dry Weight = 237467.72 kgf
3
Total Volume = 148.42 m
Total Weight = 237467.72 kgf
= 2328.85 kN

PERHITUNGAN VOLUME

LEAN CONCRETE SAND LAYER


Thickness (H.lc) = 0.05 m Thickness (H.sl) = 0.1 m
Volume Total (V.lc) = A*H.lc*np Volume Total (V.sl) = A*H.sl*np
= 8.712 m3 = 17.424 m3

EXCAVATION BACK FILL SOIL


Thickness (H.exc) = 1.35 m Volume of Backfill = 144.31 m3
Volume of Soil (V.exc) = A*H.exc*np
= 242.406 m3
BEBAN BTS
COUNTER WEIGHT (CW) = 0.0 kN.m Total Valume of BTS Foundation (Conc) = 1.25 m3
Type = Concrete Total Valume of BTS Foundation (Stone) = 0 m3
2
Area = 0m Total weight of BTS Foundation = 3000 kgf
Thickness = 2m Total Load of BTS Equipments = 2000 kgf
Unit weight = 2400 kgf/m³ Total Load = 49.04 kN
Number of CW = 1 Number of Pad Foundation = 6
3
Volume = 0.00 m Area of Pad Dimension = 0.04 m2
Weight = 0.00 kgf BTS Foundation Load (per Pad) = 204312.50 Pa

v23.04.07 3 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA

SITE ID : TOWER TYPE : T4L-92-MEDIUM LIGHT-G

NEW SITE

Sliding Capacity
Friction Coefficient (∂fr) = 0.45

F.resisting = [(Wbf+Wcon+Pressure Down) * (∂fr)


= 2331.51 kN

Horizontal Force
Fa = 72.91 kN

SFsliding = Fresisting
Fa

= 31.98 > 1.5 (OK)

Overturning Moment Capacity


M. overturning = horizontal force.h + total moment + total uplift force
= 13444.93 kN m

M. Resisting = (total compress force) + [(Wbf + Wcon).0,5.B]


= 60501.01 kN m

SF Overturning = M resisting
M overturning
= 4.50 > 2 (OK)

Bearing Capacity
PCAmats Output = 19103.43 kgf

Pile Bearing Capacity = 346378.23 kgf (Pile Group)


= 43297.28 kgf (Per Pile)

SF bearing = 43297.28 = 2.27 > 2 (OK)


19103.43

v23.04.07 4 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA

SITE ID : TOWER TYPE : T4L-92-MEDIUM LIGHT-G

NEW SITE

Punching Shear

Shear resistance factor = 0.75


Shear resistance (Φ Vc) = 2079.84 kN
Shear stress (Vu) = 1116.81 kN

SF Punch Shear = Φ Vc / Vu
= 1.86 > 1.5 (OK)

Displacement Down

Max Displacement Down = 2.886 mm < 150 mm (OK)

v23.04.07 5 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA

SITE ID : TOWER TYPE : T4L-92-MEDIUM LIGHT-G

NEW SITE

PENULANGAN PEDESTAL
Load Factor (µf) = 1.3

Stirrup Bar
Quantity of section (ns) = 2 strength reduction factor for shear
Horizontal force (Vn) = 94.79 kN Φsh = 0.75
Effective depth (Ef.d) = 612 mm
Nominal shear strength of the concrete
Vcon = Φsh*(bb/6)*Ef.d*√fc Stirrup Spacing
= 243.932 kN s = Av*fy*Ef.d/Vs
Minimum Stirrup Spacing = 284 mm

Stirrup Shear Resisting = - kN Maximun Stirrup Spacing = 306 mm


Stirrup Shear Force (Vs) = 94.79 kN
Recommendation
Total are of the stirrup crossing the crack S stirrup = 150 mm
2
Av = ns*((π/4)*Pdsd )
= 157.14 mm²

Flexure Bar
minimum reinforcement area minimum Number of bar
As.minp = 0.01*b.t*b.b Nbar = As.minp/((π/4)*Pdrd2)
= 4900 mm² = 25 or 28
Trial 28
Pcacol Input
Pedestal Dimension = 700 x 700 mm Specified Yield Strength of Steel
Factored Tension = -1184.139 kN fy = 420 N/mm²
Factored Compress = 1464.281 kN
Factored Moment = 132.700 kN.m Specified Yield Strength of Conrete
fc = 20.75 N/mm²
From Pcacol Output
Recommendation :
Ped Bar 28 D 16
Stirrup D 10 - 150

(OK)

v23.04.07 6 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA

SITE ID : TOWER TYPE : T4L-92-MEDIUM LIGHT-G

NEW SITE

PENULANGAN PAD

Tulangan Pad Tulangan Sekitar Pedestal


As req = 699.999 mm2 As req = 1941.822 mm2
D = 16 mm D = 16 mm
As = 201.14 mm2 As = 201.14 mm2
n = 3.5 bar / m n = 9.7 bar / m

Spacing Spacing
s = ( 1000 mm ) / ( n ) s = ( 1000 mm ) / ( n )
s = 287.35 mm s = 103.58 mm
s = 280 mm s = 100 mm
= 200 mm = 100 mm
digunakan tulangan, D16 - 200 mm digunakan tulangan, D16 - 100 mm

Tulangan Pad yg direkomendasikan


D16 - 200 mm 200

Diperlukan tulangan rapat sekitar pedestal,


D16 - 100 mm

v23.04.07 7 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA

SITE ID : TOWER TYPE : T4L-92-MEDIUM LIGHT-GF

NEW SITE

PILE CALCULATION

DESCRIPTION
Pile Dimension (D) 0.5 m
Total Number of Pile (n) 24 Pile
Depth Of Foundation (H Depth) 1.20 m
Bottom Pile Elevation (L Depth) 8.80 m
Specified Compressive Conc. Strength K= 25.0 MPa
fc' = 20.75 MPa
Unit weight of Concrete (Wc) = 2400 kgf/m3
= 23.54 kN/m3
Unit weight of Soil 1600 kgf/m3
Number of Piles in the direction ( n piley ) 2
( n pilex ) 1
Distance of Pile (Sp) 1.5 m
Cross Section Area Ad = p / 4 * D2 = 0.20 m2
= 1964.3 cm2
Perimeter Ro = 3.14 X D = 1.57 m
Circumference Ac = Ro * L 11.94 m2
= 119429 cm2
Weight of Pile Wp = A * L * wc = 3582.86 kgf

REINFORCEMENT
Rebar Diamater (RD) 16 mm
2
Cross Section Area (Ab) Ab = p / 4 * RD = 201.06 mm2
minimum reinforcement area As.minp = 0.01*Ad = 1964.29 mm²
minimum Number of bar N Bar = As.minp/Ab = 10
=> 10 Bar / Pile
Shear Bar
Diameter Pile 500 mm
Spacing Diamater Pile / 2 = 250 mm
=> 150 mm

Recommendation :
Pile Bar 10 D 16
Stirrup ø 10 - 150

Pile Calculation‐1 9/4/2023
SITE NAME : OFFICE MTBU NEW XL PROJECT : PRIVATE LTE PAMA

SITE ID : TOWER TYPE : T4L-92-MEDIUM LIGHT-GF

NEW SITE

Calculation
Compression Capacity of Concrete Pn = 1/3* fc' * A = 1358.63 kN
= 138542.32 kgf

⎛ ⎛ φpile ⎟⎞ ⎟⎞ ⎛ 180 ⎞
Φ := ⎜ atan ⎜ ⋅⎜ ⎟ = 18.43 deg
⎜ ⎜ sp ⎟ ⎟ ⎝ π ⎠
⎝ ⎝ ⎠⎠
Effenciency group of pile (Labbare Convercion)

( ) ( )
⎡⎣ npilex − 1 ⋅ npiley⎤⎦ + npiley − 1 ⋅ npilex
η := 1 − Φ ⋅ 0.90
90 ⋅ npilex ⋅ npiley

Pile Bearing Capacity


Undrain cohesion at the pile toe ( Cb ) 2.53 kgf/cm2
Bearing Capacity factor (Nc) 9
Adhesion of the soil surronding the pile sharf ( Cu) 0.907 kgf/cm2
Allowable Bearing Capacity
Q ug = Nc*Cb*Ad + 0.7*Cu*Ac 120588.46 kgf
Allowable Bearing Capacity

Q ug = η x npile x 120588.46 = 346378.23 kgf (Pile Group)


2.5 = 43297.28 kgf (Per Pile)
= 424.60 kN (Per Pile)

Pile Tension Capacity


Skin Friction Capacity
Tu = η *0.7*Cu*Ac + Wp = 26263.67 kgf (Per Pile)
3 = 257.57 kN (Per Pile)

Pile Calculation‐2 9/4/2023
FOUNDATION SETTLEMENT

Penurunan Segera (Steinbrenner - 1934)

Si = Penurunan Segera (m)


qn
Si = ‫݌ܫ‬. ‫ܤ‬
E
qn = Tekanan Pondasi Netto (ton/m2)

qn = ‫ ݍ‬െ ‫݂ܦ‬. ܻܾ
E = Modulus Elastisitas
ʅ = Angka Poisson
Ip = Faktor Pengarung untuk beban persegi empat

Ip = 1 െ Ɋ2 F1 + 1 െ Ɋ െ ʹɊ; F2

Ip = 1 െ Ɋ2 F1 + 1 െ Ɋ െ ʹɊ; F2

D = 1.2 M
H = 10.8 M
L = 13.2 M
B = 13.2 M
H/B = 3.272727273 M
L/B = 1 M
F1 = 0.4
F2 = 0.05

q = 15.56 ton/m2
Df = 1.2 m
Yb = 1.6 ton/m2
qn = 13.64
E = 20000 ton/m2
ʅ = 0.5
Ip = 0.3
Si = 0.00270072 m
Si = 2.70072 mm < 150 mm (OK)

Penurunan Konsolidasi Primer

Sc = Penurunan Konsolidasi Primer


ѐe
Sc = ‫ܪ‬
1+e0
ѐe = Lempung normally consolidated
ܲo+ѐ‫݌‬
ѐe = ‫݈ܿܥ‬o݃
ܲ0
ѐe = Lempung over consolidated

Jika P1 <Pc
ܲ1 ܲϬнѐ‫݌‬
ѐe = ‫݈ݎܥ‬o݃ = ‫݈ݎܥ‬o݃
ܲ0 ܲ0

Jika P0<Pc<P1
ܲܿ ܲϬнѐ‫݌‬
ѐe = ‫݈ݎܥ‬o݃ + ‫݈ܿܥ‬o݃
ܲ0 ܲ0

P0 = Tekanan Overburden
P0 = ‫݂ܦ‬. ܻܾ

e0 = Angka Pori
H = Kedalaman Lapisan Tanah

ѐp =

ѐp = 4. ‫݌ܫ‬. ‫݊ݍ‬

Z = 6 M
L = 3.3 M
B = 3.3 M
L/B = 1 M
B/Z = 0.55 M
L/Z = 0.55
Ip = 0.095

q = 15.56 ton/m2
Df = 1.2 m
Yb = 1.6 ton/m2
qn = 13.64 ton/m2
H0 = 6 m
e0 = 0.87
Cc = 0.3763
Cr = 0.143
P'c = 10.94 ton/m2
P0' = 9.6 ton/m2
ѐp = 5.1832
P'c < WϬнѐƉ
ѐe = 0.078669894
Sc = 0.000252417 m
Sc = 0.252416773 mm

Si-total = Si+Sc mm
Si-total = 2.95314 mm < 150 mm (OK)