HIRARC FORM

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL


REV. 0
FORM
(HIRARC FORM)
PROJECT TITLE: DRX ASCEND INSTALLATION

Function / Main Activity: INSTALLATION OF X-


Company: BEST CONTACT (M) SDN BHD Date: 16/02/2021
RAY SYSTEM (DRX ASCEND)
Reviewed and Approved By:
Name Designation Signature

Prepared by: Faiz Project Engineer

Reviewed by:

RISK
N ACTIVITY HAZARD RESIDUAL
HAZARD VALUE CONTROL MEASURES RESPONSIBLE
° DESCRIPTION EFFECT RISK
R=SxL

1.1.1 Work with caution.

1.1.2 Identify route and any obstruction.

1.1 Trip and fall 1.1.3 Use PPE – Wear Safety shoes with
good sole.
1.2 Slippery and
uneven ground. 1.1.4 Identify route and any obstruction.

1.3 Heavy object 1.1.5 Secure materials on trailer properly


Bodily injury
Handling 1.4 Falling Load 1.1.6 When lifting, ensure weight is Supervisor/Foreman
1. 9M=3x3 3L=3x1
material to site Hand and finger distributed equally.
1.5 Collision of injury
materials during 1.1.7 Ensure lifting tackles are in good
handling. condition and used properly.

1.6 Faulty 1.1.8 Predetermined route location for


Equipment & Lifting equipment transportation and unloading.
Tackles
1.1.9 Personnel to guide vehicle to
designated area.
HIRARC FORM

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL


REV. 0
FORM
(HIRARC FORM)
PROJECT TITLE: DRX ASCEND INSTALLATION

2.1.1 Inform panel operator and shift


supervisor to understand clearly the job
steps to be taken and the nature of the job.

2.1.2 Perform tool box meeting before


Damage to
start the activity Supervisor
Work 2.1 equipmemt
2. 6L=2x3 4L=2x2 PTW
preparation Miscommunication
2.1.3 Apply PTW c/w all supported Workers
Hand Injury
documents and adequate at work area.

2.1.4 Only competent person to conduct


the job

3.1.1 Work with caution

3.1.2 Compatible accessories shall be


compiled.
Major injury
3.1 Fall from heights 3.2.3 Ensure drill guards are in place.
Ceiling work/ Hand and finger Supervisor
3 3.2 Struck by 9M=3x3 3.2.4 Only trained & skilled person are 4L=2x2
/brackets & injury PTW
materials allowed to use drills.
supports at Workers
site.
3.3.5 Do not enter for all unauthorised
person into electrical activities.

3.3.6 Electrical Proper PPE to be used.


HIRARC FORM

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL


REV. 0
FORM
(HIRARC FORM)
PROJECT TITLE: DRX ASCEND INSTALLATION

4.1.1 Thinner or other solvents shall be


kept in a secured container and
adequately labelled.

4.1.2 provide portable fire extinguisher


4.1 Exposed to within the reach of the paint mixing worker.
inhalation of Potential to cause
chemical respiratory problem 4.1.3 Mixing work to be carried out in well
Supervisor
Painting vapour/fume ventilated area.
4. 6L=2x3 4L=2x2 PTW
Work Potential to cause
Workers
4.2 Exposed to fire, burns and 4.1.4 Conduct Tool Box Talk on flammable
flammable liquid i.e. property damage liquid hazard and control prior to paint
thinner (solvent) mixing work.

4.1.5 Wearing of safety helmet, safety


shoes/ boots, safety vest and chemical
resistant gloves should be made
mandatory.

5.1.1 Work must be


carried out by trained personnel.

5.1.2 Never lift heavy load alone, seek


assistance from other.

5.1.3 Conduct Tool Box Talk on manual


Potential to fall
5.1 Excessive handling hazard and control prior to
down and caused
manual handling Fall wiring work
bodily injury
from heights
Supervisor
5 Electrical Work 9M=3x3 5.1.4 Work with caution 3L=3x1
Hand and finger PTW
5.2 Potential to
injury Workers
sustain
electrocuted 5.1.5 Do not enter for all unauthorised
burn
person into electrical activities.

5.1.6 Electrical Proper PPE to be used.

5.1.7 Use proper PPE. – Use rubber


hand gloves & insulated safety shoes and
ear protection.
HIRARC FORM

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL


REV. 0
FORM
(HIRARC FORM)
PROJECT TITLE: DRX ASCEND INSTALLATION

6.1.1 Work must be


carried out by trained personnel.

6.1.2 Work with caution


6.1 Potential to
sustain 6.1.3 Do not enter for all unauthorised
Bodily injury
X-Ray electrocuted person into X-ray and electrical activities.
Supervisor
6 Installation 12M=4x3 6L=3x2
Skin burns PTW
work. 6.2 X-ray exposed 6.1.4 Use lead gown during calibration X-
Workers
ray.
Cancer
6.1.5Use proper PPE. – Use rubber hand
gloves & insulated safety shoes

7.1.1 After completion of job all unwanted


7.1 Sharp edge
materials shall be removed and area
Slip and fall shall be thoroughly cleaned. Supervisor
7 Housekeeping 7.2 Trip & fall 6L=3x2 3L=3x1
Hand finger injury PTW
7.1.2 Use suitable PPE Workers
7.3 Pinch point.
8.1.3 Remove any obstruction
HIRARC FORM

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL


REV. 0
FORM
(HIRARC FORM)
PROJECT TITLE: DRX ASCEND INSTALLATION

LIKELIHOOD
PEOPLE ASSETS Extremely unlikely Very Unlikely Occasional Probable frequent

RATE
requires Possible or known to Event or near miss or
Remote Possibillity common or repeating occurrence
Risk to safety multiple failures occur having occurred
Financial
Risk 1 2 3 4 5
high multiple 5
SEVERITY

single fatality 4
medium Disability 3 Low medium high
lost time
injury 2
low 1