Find supplymentary re-bars for resisted breakout concrete . hef/3 = 133.33 mm.

effective area of anchorage


1. find amount of vertical reinforcing steel

Tension force = 174196.10 N


concrete breakout force = 35067.5 N
fy ( for reinforcing bar) = 4000 ksc
Dia of reinforcing bar = 20 mm.
hef = 400 mm. covering
covering top = 40 mm.
number of rebar in ld_avilalble
400 mm.
effective anchorage = 2 NOS
tension 35⁰
As = 6.28 cm2
40 < hef/3, OK
re-bar requirement = 0.101*(174196.1-35067.5) ( from Figure)
Φ *fy* As ,for anchor Φ = 0.75

= 0.101*(174196.1-35067.5)
0.75*4000*6.28

= 0.7459 < provided effective number of rebar, OK

2. find development length

(use stirrups or tie =1 , not provided stirrups or tie=2) = 1


Clear spacing of bar = 7 cm.
Clear covering = 4 cm.
bar location factor ; (ψt) = 1 ( for vertical rebar)
coating factor ;(ψe) = 1 ( for uncoat bar)
concrete density factor ;(λ) = 1 ( for normal concrete)
fc' ( concrete strength) = 280 ksc
fy ( re-bar yeild strength) = 4000 ksc
For Hook bar
2
lhd = 0.075 Ψe λ fy* db kgf/cm unit
0.5
fc'

lhd = 35.9 cm.

lhd_reduced = lhd* As_req ,ACI318-05, 12.2.5


As_provided
= 35.9*0.746/1
= 26.78 cm.

Available development length based on pier height and the embedment depth of the anchor bolt
ld_available = hef - concrete_cover - dactual*tan35
= 400-40-40*tan(35) mm.
= 33.2 cm. > lhd, OK