PAGE: 1 OF 32
REV. 2
DATE: JUNE 2019
CONTRACT: 1-BD-1022A
CLIENT: SGCOC- Surhan Gas Chemical Operating Company
PROJECT TITLE: M25 Project
PROJECT LOCATION: Uzbekistan, Surkhandarya region
DISCLAIMER
All information contained in this report is intended for use only by recipient and shall not be used
for any purpose other than that for which it is specifically furnished. It is not intended for use by
recipient for the purpose of design and/or construction. Any use of the information for realization
purposes is forbidden. Amec Foster Wheeler Italiana disclaims any warranty, express or implied, as
to the accuracy of the information, and will have no liability for any loss of profit, loss of contracts,
loss of goodwill, however arising out of the use of this report.
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 2 OF 32
REV. 2
DATE: JUNE 2019
TABLE OF CONTENT
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 3 OF 32
REV. 2
DATE: JUNE 2019
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 4 OF 32
REV. 2
DATE: JUNE 2019
Plant capacity
GPP design capacity is 5.0 BCMA (billion Nm3/y) of raw natural gas from gas
field.
Design Life
The design life for all the facilities is 25 years.
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 5 OF 32
REV. 2
DATE: JUNE 2019
Plant location
GPP site (plot #9) is a greenfield location in the Baysun district of the
Surkhandarya region of Republic of Uzbekistan, as per following map.
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 6 OF 32
REV. 2
DATE: JUNE 2019
► Seismicity
The seismicity of the area (MSK-64), according to Appendix #1 KMK
2.01.03 - 96, is estimated:
► in 7 (seven) - with the frequency of earthquakes 1 time in 100
years;
► in 8 (eight) - points with the frequency of occurrence of
earthquakes 1 time in 500 years (for the settlement of Baysun).
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 7 OF 32
REV. 2
DATE: JUNE 2019
Final parameters of meteorological conditions will be confirmed at the BDP and FEED
stages.
Plant availability
M25 GPP shall be designed, built, operated and maintained for an overall plant
availability of 8000 h/y.
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 8 OF 32
REV. 2
DATE: JUNE 2019
Project phases
M25 Project shall be executed in two different steps:
► Step 1: 100 % treated gas (504796 Nm3/h, equivalent to 4.0 BCMA) from GPP
for sale (to be realized in 2 consecutive phases, based on 2 GPP parallel trains)
► Phase 1: operation of gas processing line 1 (2.5 billion Nm3/y raw gas design
capacity), treated gas from GPP routed to Shurtan-Sherabad existing gas
pipeline.
► Phase 2: operation of both gas processing lines 1 and 2 (5 billion Nm3/y raw
gas design total capacity), treated gas from GPP routed to line D.
Net treated gas for sale is 480165 Nm3/h, for considering 24630 Nm3/h fuel gas
GPP users demand.
Additional 110600 Nm3/h of treated gas will be received from Early Gas
Treatment Unit, for a total treated gas export of 590765 Nm3/h.
► Step 2: treated gas from GPP for sale will consider
► 24630 Nm3/h GPP fuel gas users demand
► 139317 Nm3/h (1.1 BCMA) natural gas from GPP to GCC for 500 KTA
polyolefin production
► 31300 Nm3/h GCC fuel gas users demand
Net treated gas for sale is 309548 Nm3/h.
GPP and GCC erection schedule is to be intended completely independent; all GPP
Units, both process and U&O units, will not have interfaces with GCC Units.
According to the latest plan, GPP will be built onto the plot #9, following below
planned schedule:
► GPP train #1: by the end of 2021;
► GPP train #2: by the end of 2022;
► One BCM Earlier gas facility: by the end of 2019 (this will be located inside of
GPP);
► Common utility system and auxiliary facilities for GPP train #1 and #2: by the end
of 2021;
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 9 OF 32
REV. 2
DATE: JUNE 2019
► Related Infra structures (CAMP, raw water supply, raw gas & sales gas pipe line)
for GPP train #1 and train #2: by the end of 2021.
1.7.1. Feedstock
The feed to the GPP is raw natural gas from “Mustaqulligning 25 yilligi” gas field
located in the Surkhandarya region of Republic of Uzbekistan, with the
characteristics and conditions indicated in the following table, to be considered
at GPP inlet battery limits.
No other feedstocks are envisaged.
Water content
Water content based on gas field wellhead bottom conditions as 650 barg
and 137°C.
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 10 OF 32
REV. 2
DATE: JUNE 2019
Mercaptans content
200 mg/Nm3 of Methyl-Mercaptan considered in the raw natural gas.
Mercury content
No Mercury content envisaged in raw natural gas as long as final raw gas
composition will be available.
1.7.2. Products
The M25 GPP will be designed to target the following final product qualities.
ITEM LIMIT
H2S content 5 mg/Nm3 (max)
CO2 content 1.5% vol.
Mercaptans content 15 mg/Nm3
Water Dew point -7°C max (@ 70 barg, winter condition)
-2°C max (@ 70 barg, summer condition)
Hydrocarbon Dew Point - 5°C max (winter cond.):
(at working pressure) 0°C max (summer cond.)
The treated Natural Gas specifications shall be considered for GPP design
either for treated gas delivered to Shurtan-Sherabad existing gas pipeline and
to new gas pipeline line D and considering the following final delivery pressures:
► Treated Gas to Shurtan-Sherabad existing gas pipeline: 30 barg min.
► Treated Gas to new gas pipeline (line D): 40 barg min.
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 11 OF 32
REV. 2
DATE: JUNE 2019
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 12 OF 32
REV. 2
DATE: JUNE 2019
GPP shall consist in two (2) parallel trains, each train designed for 2.5 BCMA and
consisting in the following main process units:
► Process Units
► Acid Gas Treatment Unit made of Sulfinol Unit and ADIP Unit (U-120 and U-
125 / U-220 and U-225)
► Dehydration Unit (U-130 / U-230)
► Sulphur Recovery Unit (SRU), including Tail Gas Treatment Unit (TGTU) (U-
150 / U-250)
Integrated configuration for Acid Gas Treatment Unit and SRU has been selected
according to Shell design.
Additional Process Units included in GPP are the following:
► Sour Water Stripping Unit (U-100, HOLD)
► Raw Gas Metering Unit (U-110 / U-210)
► Treated Gas Metering Unit (U-140 / U-240)
► Sulfur Granulation Unit (U-155)
Treated Gas from GPP shall be connected though dedicated pipelines to:
► Shurtan-Sherabad existing gas pipeline for domestic gas export (Phase
1 of Step 1)
► New 4th gas pipeline of Turkmenistan-China gas pipeline (line D) for gas
export (Phase 2 of Step 1)
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 13 OF 32
REV. 2
DATE: JUNE 2019
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 14 OF 32
REV. 2
DATE: JUNE 2019
► Administration Buildings
► Laboratory Buildings
► Mechanical Repair Shop
► Garage
► Vehicle Repair and Car Wash
► Main Entrance Checkpoint
► Fire Department Station
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 15 OF 32
REV. 2
DATE: JUNE 2019
Battery Limits
The main battery limits of M25 GPP are shown in the following table:
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 16 OF 32
REV. 2
DATE: JUNE 2019
Plant availability
The M25 GPP shall be generally designed to maximize the whole plant
availability.
Emissions
M25 GPP shall be designed with environmental emissions in compliance with
the Law “On protection of atmospheric air” dtd. December 27, 1996, N 353-
I, according to which atmospheric air, as an integral part of natural resources, is
national wealth and protected by the state, as well as by other by laws.
Based on the above document, quotas for pollutants emitted into the
atmospheric air by enterprises of the Republic of Uzbekistan are indicated in the
table below:
Quotas in MPC fractions depending on
Territories of the Republic of Uzbekistan hazard class of emission
1 2 3 4
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 17 OF 32
REV. 2
DATE: JUNE 2019
The list of main pollutants typical for gas processing plant and gas chemical
complex, their hazard class and specified quotas are presented in the table
below:
Quotas (MPC MPC for work area,
MPC one- Hazard
Name of component fractions) for mg/m3
time, mg/m3 Class
Surkhandarya Region
Hydrogen oxide 5 4 0,5 20
Nitrogen dioxide 0,085 2 0,25 2
Nitrogen oxide 0,6 3 0,33 5
Methane 50 4 0,5 7 000
Sulfur dioxide 0,5 3 0,33 10
10
Hydrogen sulfide 0,008 2 0,25 mixed with
hydrocarbons 3
Hydrocarbon 1,0 4 0,5 900/300
Carbon soot 0,15 3 0,33 4
Elementary sulfur dust 0,07 3 0,33 6
The following requirements have to be considered for limiting noise and the level
of radiation of the flare.
The sound pressure level measured at a height of 1.2 to 1.5 meters above
ground level at the boundary of the property (fencing) must be less than 50 dBA.
The noise level at a distance of 1m from each piece of process equipment and
a control valve is 80 dBA.
The limitation of the radiation level of the Flare stated below is recommended to
adopt under the following conditions in accordance with the Standard of
the Republic of Uzbekistan 12-20-08 “Rules for the Construction and Safe
Operation of Flare Systems”:
► At flare stake ground level: 9.4 [kW/m2];
► In case of evacuation of personnel within 30 seconds: 4.8 [kW/m2];
► At the B.L. of the flare unit and evacuation of personnel within 3 minutes: 2.8
[kW/m2];
► Unlimited staff stay: 1.4 [kW/m2]
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 18 OF 32
REV. 2
DATE: JUNE 2019
Software Codes
For the development of the study and specific process activity needs, the
following software codes have been used:
► HYSYS v8.6 (by Aspen Technology, Inc.): Process Simulator used for
process simulations activities
► Aspen Capital Cost Estimator: Software simulator for process plants cost
estimate development.
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 19 OF 32
REV. 2
DATE: JUNE 2019
Raw water is supplied to M25 GPP battery limit from Water Reservoir.
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 20 OF 32
REV. 2
DATE: JUNE 2019
Chemical analysis data for nitrogen and iron in water are reported in the
following table:
Mass spectrometric analysis data of water content of heavy metals and toxic
elements are reported in the following table:
Station UoM Be Hg Cd Mo As Pb Se Sr Ni Mn Cu Zn Br
Autumn
2017 (Nov.)
ST-15 µg/l <0,07 <0,14 <0,2 1,13 <0,01 0,11 2,21 3521 1,32 0,34 1,00 2,09 170
Spring 2018
(Mar.)
ST-15 µg/l <0,07 <0,14 0,026 1,00 0,81 0,48 1,30 2300 2,70 2,20 2,90 7,10 87
Raw Water Unit design capacity: 240 t/h (216 t/h process requirement plus 10%
overdesign margin).
Treated Water conditions:
► Operating pressure at users’ inlet: 5.0 barg
► Mechanical design pressure: 10.0 barg
► Supply temperature: 25°C
► Mechanical design temperature: 70°C
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 21 OF 32
REV. 2
DATE: JUNE 2019
Typical specification requirements for cooling water are listed here below (to be
confirmed during next engineering phase):
Cooling Water Unit design capacity: 2303 t/h (circulating cooling water flow).
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 22 OF 32
REV. 2
DATE: JUNE 2019
Demin Water Unit design capacity: 125 t/h (112 t/h process requirement plus 10%
overdesign margin).
Demin Water conditions:
► Operating pressure at users’ inlet: 7.0 barg
► Mechanical design pressure: 12.0 barg
► Supply temperature: 25°C
► Mechanical design temperature: 70°C
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 23 OF 32
REV. 2
DATE: JUNE 2019
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 24 OF 32
REV. 2
DATE: JUNE 2019
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 25 OF 32
REV. 2
DATE: JUNE 2019
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 26 OF 32
REV. 2
DATE: JUNE 2019
Sanitary and Epidemiological Oversight the water research is carried out for the
presence of causative agents of infectious diseases of bacterial and the viral
nature involving for these purposes specialized laboratories.
Note 5. The list of identifying pesticides in drinking water is compiled by bodies
of State Committee for Sanitary and Epidemiological Oversight taking into
account a particular situation in those regions of the republic in accordance with
SanPin of the Republic of Uzbekistan "Hygienic Standards of pesticides in the
environment and food".
Note 6. It is determined only on the water pipelines from surface water sources
and as agreed with the territorial Centres of State Committee for Sanitary and
Epidemiological Oversight according to epidemiological indications.
The values specified in the table in brackets are allowed.
* when processing for reagent containing aluminium.
** at guaranteed reliability of water disinfection.
*** when processing of highly coloured waters and mandatory control of
trihalomethanes in the case of water disinfection with chlorine.
**** for water pipelines feeding water without special treatment.
***** with the absence of water chlorination.
Potable Water Unit design capacity: 11 t/h (10 t/h process requirement plus 10%
overdesign margin).
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 27 OF 32
REV. 2
DATE: JUNE 2019
2.1.6. Steam
Steam is produced/consumed within M25 GPP at the conditions indicated in the
following table:
Steam Generation Unit design capacity: 250 t/h (224 t/h process requirement
plus 10% overdesign margin).
Recovered steam condensate will have the following characteristics:
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 28 OF 32
REV. 2
DATE: JUNE 2019
Condensate Polishing Unit design capacity: 420 t/h (381 t/h process requirement
plus 10% overdesign margin).
Polished condensate conditions are the same of demin water ones:
► Operating pressure at users’ inlet: 7.0 barg
► Mechanical design pressure: 12.0 barg
► Supply temperature: 25°C
► Mechanical design temperature: 70°C
2.1.8. BFW
Typical specification requirements for BFW are listed here below (to be
confirmed during next engineering phase):
BFW Unit design capacity: 530 t/h (480 t/h process requirement plus 10%
overdesign margin).
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 29 OF 32
REV. 2
DATE: JUNE 2019
LP BFW conditions:
► Operating pressure at users’ inlet: 20.0 barg
► Mechanical design pressure: 30.0 barg
► Supply temperature: 115°C
► Mechanical design temperature: 150°C
HP BFW conditions:
► Operating pressure at users’ inlet: 65.0 barg
► Mechanical design pressure: 85.0 barg
► Supply temperature: 115°C
► Mechanical design temperature: 150°C
Instrument and Plant Air Unit design capacity: 1000 Nm3/h (wet air) (905 Nm3/h
process requirement plus 10% overdesign margin).
2.1.10. Nitrogen
Nitrogen is produced by Nitrogen Production Unit at the following conditions:
► Supply pressure: 8.0 barg
► Supply temperature: 15 °C min
► Design pressure: 10.0 barg
► Design temperature: 60 °C
► Nitrogen content: 97 % vol.
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 30 OF 32
REV. 2
DATE: JUNE 2019
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 31 OF 32
REV. 2
DATE: JUNE 2019
Electric power
Power Generation system is designed for power provision to M25 GPP during
normal operation. Power is distributed to different users at the voltage levels
shown in the following table:
EACH REVISION SUPERSEDES PREVIOUS ISSUE. CHANGES ARE INDICATED IN RED COLOR OR A VERTICAL LINE.
THIS DOCUMENT IS THE PROPERTY OF AMEC FOSTER WHEELER ITALIANA AND HOLDERS CERTIFY THAT DISCLOSURE HAS BEEN LAWFULLY MADE TO THEM AND THAT ANY REPRODUCTION USE OR DISCLOSURE SHALL BE SUBJECT TO SPECIFIC PRIOR AUTHORISATION.
FEASIBILITY STUDY REPORT – GPP ONLY
PAGE: 32 OF 32
REV. 2
DATE: JUNE 2019