SITE SURVEY FORM FOR CIVIL ENGINEERING WORKS


1. GENERAL:
(a) Name of work ..

(b) Name of clients ..


(c) Estimated Cost ..
(d) Completion Period ..
(e) Maintenance Period ..
2. LOCATION:
(a) Name of place ..
Start Point of

End point is
(b) Distance from and conditions of access road to site ..
i) Nearest Railway Station ..

ii) Nearest Airport ..


iii) Nearest town with marketing facilities ..
iv) Nearest telephone exchange / telegraph/post office ..
v) National/State Highways ..
vi) Client's stores for issue of departmental materials, if any ..
vii) Nearest SPSCPL site & distance from this project site ..
3. METEOROLOGICAL DATA:
(a) Maximum rainfall in a year ..
(b) Period of rainy season ..
(c) Approximate number of non working days likely to be lost due to rains local ..
festivals in a year

(d) Maximum temperature ..


(e) Minimum temperature ..
(f) If site is on bank of river, give data on
i) H.F.L. ..
ii) Average water level ..
iii) L.W.L. ..
v) Width and depth of water in river during dry season (Working Season) ..

(g) Any other details for consideration ..


4. PHYSICAL FEATURES OF SITE:
(a) Plain ..
(b) Innundated ..
(c ) Rocky (soft or hard rock) ..
(d) Desert ..
5. SOIL DATA:
(a) Type of substrata met with up to hard ground or rock as obtained from borings ..
or trial pits. Copie of bore logs/trial pit charts to be enclosed.

(b) Depth of subsoil water ..

(c) Specify at what depth of excavation, shoring and strutting may be required to ..
retain the sides.
6. INFRASTRUCTURAL FACILITIES:
(a) Water:
i) Availability and source of water during working season. If bored wells/ ..
open wells required and cost of the same.
ii) Quality of water ..
iii) Cost of water supply arrangements with details ..

Page 1 of 18
SP Singla Constructions Pvt Ltd.
SITE SURVEY FORM FOR CIVIL ENGINEERING WORKS
iv) Tariff of water supply if municipal supply available. ..
v) Availability of Water Tankers and Cost of Water by Water tanker ..
(b) Electricity:
i) Availability source and lead to worksite of elec. supply, if available ..

ii) Supply voltage single/three phase cost of installation and distribution ..


systems with annual maintenance cost thereof.

iii) Tariff of electricity supply. ..


(c) Accommodation:
i) Availibility of houses on rentals with approx. distance from work site.

ii) Normal rentals per month with corresponding areas of houses. ..

iii) Rates for building temporary staff quarters, labour hutments, site offices / ..
stores / work shops etc.
iv) Availibility of land and rental thereof, if any. ..

v) Condition of land-low lying etc. to be indicated along- with cost of ..


development of land giving break up of reclaimation or filling cost,
maintenance of approache roads etc. for the quarters.

(d) P.O.L.:
i) Nearest supply depot for petrol, H.S. diesel and lubricants. ..
ii) Whether P.O.L. is available sifficients, or are there frequent shortages? ..

iii) Ex-supply depot rates for ..


Petrol per litre ..
H.S. Diesel per litre ..
Lubricants per litre ..
iv) Transportation cost from supply depot to worksite ..
(e) Any other item of specific significance:..
7. MATERIALS RATES:

8. LABOUR WAGES:
9. PROPOSED SITE LAYOUT AND CRITICAL SITE CONDITIONS:
(a) ..
Give plan with approximate ground levels showing thereon details of proposed
locations for offices, stores, workshops, stacking yards, casting yards, staff and
labour camps with relative locations of water and access roads.

(b) Appx. Cost of Development of Site ..


(c) ..
Critical conditions at site, if any, warranting special attention/ arrangement to be
catered for during tendering stage and/or execution stage, such as subsoil
water table, special local requirements/obligations, etc.

(d) ..
Cost and length of approach road to the work site and cost of maintenance/
year for same.

(e) Cost of construction of temperary jetties for loading and unloading of ..


construction materials, indicating length of the jetties and cost of maintenance/
year.
(f) Availability of Barges with capacity and rental changes ..
(g) Availability of launchers, motor boats and monthly charges ..
(h) Requirement of watch & Ward for security ..
10. MISCELLANEOUS INFORMATION:
(a) Nearest banking facilities available. ..

Page 2 of 18
SP Singla Constructions Pvt Ltd.
SITE SURVEY FORM FOR CIVIL ENGINEERING WORKS
(b) Nearest hospital facilities available. ..
(c) Nearest police station. ..
(d) Local taxes, e.g. sales tax, VAT municipal taxes, octroi, entry tax etc. ..
(e) State briefly general construction activities going on in the area and their ..
problems if any.

(f) General law and order siuation of area, labour problems, etc. ..
(g) Availability of Local labour / PRW contractors. ..
Name of other bidders who visited the site for investigation.

Page 3 of 18
PRW Rates

Please indicate local P.R.W. labour rates for following items :


Sl. No. Item Unit Rate (Rs)

Pipe Culvert
Excavation ( manually ) CUM ###
Soil/ Granular material dressing/ slush removing SQM ###
back fillig with soil / granular material CUM ###
PCC Below Head wall CUM ###
Shuttering SQM ###
Pipe Laying (1m) NOS ###
Pipe laying (1.2m) NOS ###
PCC Head Wall CUM ###
Structure Work (Box Culvert / VUP / Minor Bridge / Major Bridges) ###
Excavation ( manually ) CUM ###
soil / granular material dressing / Slush removing SQM ###
Back filling with soil / granular material CUM ###
Pile - Liner making & driving (Plate cutting/rolling/jointing/shifting/driving) Rmt ###
Liner Driving Rmt ###
Liner Cutting & removing from cut-off level Rmt ###
Bentonate mixing (Loading, Unloading, Shifting & Mixing) CUM ###
Pile - Boring installation of bored Cast-in Situ Vertical piles of 1500mm Dia (By Hydraulic Rig
Rmt ###
E.G.L to Cut-off level including concreting by trimie pipe

Pile - Boring installation of bored Cast-in Situ Vertical piles of 1500mm Dia (By Hydraulic Rig
Rmt ###
E.G.L to Cut-off level to toe of the pile including concreting by trimie pipe (30 to 40 Mtr Depth)

Pile - Reinforcement cutting, bending, binding and welding including binding and welding Rod Mt ###

Pile Head Chipping (1.5m Dia Pile) RMT ###


Well Sinking Work RMT ###
HYSD cutting / bending & fixing MTS ###
HYSD Cutting/Bending MTS ###
HYSD Fixing MTS ###
HYSD / Block Loading MTR ###
HYSD Unloading MTR ###
Shuttering Fixing & Removing - Well curb & steining / Pile Cap SQM ###
Shuttering Fixing & Removing - Foundation SQM ###
Shuttering Fixing & Removing - sub structure SQM ###
Shuttering Fixing & Removing - Super structure SQM ###
Concreting - foundation CUM ###
Concreting - Sub structure CUM ###
Concreting - Super structure CUM ###
Concreting - Well curb & steining by pump line CUM ###
Concreting - Boom Placer CUM ###
Concreting - Pump pipe line CUM ###
Concreting - Tremie Pipe (Assembling / Dismantling / Shifting from one) CUM ###
Cup lock staging fixing & removing CUM ###
Please indicate local P.R.W. labour rates for following items :
Sl. No. Item Unit Rate (Rs)

Cribs staging fixing CUM ###


Cribs Staging Removing CUM ###
Pedestal casting with steel fixing , shuttering & concreting NOS ###
Fixing of bearing NOS ###
Expansion joint with staging , shuttering , fixing & concreting MTR ###
RCC Crash barrier with all reinforcement , shuttering & concreting MTR ###
Hand Railing Beam : Cage fixing , shuttering, Deshuttering and concreting complate. MTS ###
Shuttering, Steel fixing & Concreting of Curve And Post & Beam Fixing. all work related with
MTS ###
Hand Railing
Steel cutting,bending,fixing,Shuttering Concreting & Curing with all respects. Concrete
Sqm ###
Wearing Coat (M-30) on Slab (PUP / LVUP / VUP)
Steel cutting,bending,fixing,Concreting & Curing with all respects. Concrete Wearing Coat
Span ###
(M-30) on footpath (1.5 X 41.3)

Construction of "I" beam casting Yard Location with all complete (steel cutting/binding/fixing,
cable profiling, HT Strand Treading, Curing, grouting and shifting to storage yard. (18 Mtr to NOS ###
21 Mtr Length)

Construction of "I" beam casting yard location with all complete (steel cutting/bending/fixing,
Shuttering , fixing & removing , Concreting , Cable profiling , HT Strand Treading & grouting ) NOS ###
Cast in situ 30 mtr & above Lenght

I-Beam Erection ,loading/unloading, from tailor as per there location , sand filling/removing of
sand from sand jack as well as placing /removing of these jacks at pier cap top/Bottom side NOS ###
support arrangement to be done at site. Including all activity.

Recess Filling & Cross Girder surface chipping works NOS ###
Fixing of drainage spout NOS ###
Boulder Pitching Cum ###
Laying of 25mm thick Mastic over Bitumenious Concrete (41.3 m each span "13 x 40.9" ) as
SQM ###
per direction of Engineer In-charge.
###
Segment Casting Work ###
Mould Preparation (Deshuttering,shuttering,cage lowering for concreting including house
CUM ###
keeping & segment shifting from casting bed to stacking yard)
Cable profiling Each ###
Concreting of segment by concrete pump (boom placer) CUM ###
Concreting of segment by concrete pump line CUM ###
Steel Cutting,bending & binding of cage for Box Girder Per Mt. ###
Steel Cutting,bending & binding of cage for End Box Girder Per Mt. ###
Cage making for stacking of segment NOS ###
MS Rivet and Aluminium Channel Fixing in Segment at Casting Yard For Geometry Control. NOS ###
Segment Id Writing work Each ###
Cover block making NOS ###
Segment finishing ( Sand blasting , putty, foam removing, extra concrete removing from
Each ###
matching faces)
Segment Loading And Re-handling work Each ###
Please indicate local P.R.W. labour rates for following items :
Sl. No. Item Unit Rate (Rs)

Segment Erection Work by Under Slung (41.3 Mtr Span) -

Ground levling for pre-cast block shifting and placing as per alignment, tresstle erection with
braceing at Intermediate, Tresstle head, ISMB-300 / 600 and top screw jack in all respect &
welding if required (including dismantling and shifting at next span of above items). As well as Span ###
ground level for rail pre-cast block placing & shifting including fixing of rail track (both side) &
also shifing to next span as per site requirement.

Segment unloading from trailor, pre-stressing frame (top/bottom) placing & removing, erection
of segment with the help of EOT Gantry, dry matching and gluing of complete span, including Span ###
span lowering and sand pouring in pedestal also.

Cable bundel shifting, cutting, threading, shifting of bearing plate/ wedges cleaning if any and
fixing of pre-stressing jack, all pre stressing activities also live end / dead end stressed caable Span ###
cutting including all work.

Grout Cap Fixing, Cement unloading Water testing, Repairing if any and Cement grouting
Span ###
with the help of grout Pump/Agitator in all respects.
Segment Erection Work by Launching Gantry ###
Auto Launching of Launching Girder(move to next span for erection), Segment lifting from
Trailer, Dry matching ,Gluing of segments, lowering of Span at Temporary stools in all Span ###
respects. Unit Span

Cable Bundle fixed at D-coiler, Cable cutting, Shifting, Threading, Bearing Plate /wedges
Per Mt. ###
fixing and cleaning Jack fixing/Removing and Stressing of Cable in all respects.

Span Alignment, Temporary Stool Removing POT PTFE Bearing Fixing,GP2 Grouting, Span
NOS ###
lowering and Span jack removing in all respects.
Pedestal Shutter Removing , Sand Cleaning , Washing, Shutter Fixing, Concreting and De-
NOS ###
shuttering including all activity related with Pedestal Casting.
Sesmic arrester Shuttering ; concreting ; De-shuttering, Shifting, all work related with sesmic
NOS ###
casting.
All three web Recess filling , Shuttering , deshuttering, Grout Cap Chipping, Applying of Epoxy
NOS ###
on old surface and casting.
Shuttering/Stagging of expansion Joint , Concrete baking , Steel Fixing, Expansion joint fixing
MTR ###
as per line level, Concreting. Deshuttering, Stagging removing
Cable cutting (live/dead end),Grout Cap Fixing, Water testing, Repairing if any and Cement
Per Mt. ###
grouting through grout Pump/Agitator in all respects.
Launcher girder dismantling,nut bolt removing and loading at trailor in all respects. Per Mt. ###
Launching Girder erection, allignment,nut bolt fixing and torqueing in all respects. Per Mt. ###
Temporary Tresstle erection and dismantling for launching girder in all respects. Per Mt. ###
Counter weight Shifting and placing with cutting welding for locking. NOS ###
Other Work ###
One Coat Primer with one coat enamel paint SQM ###
One coat samosam paint SQM ###
Painting Work (Other) SQM ###
Erection of 20 / 80 / 100 / 120 MT Gantry Each ###
Please indicate local P.R.W. labour rates for following items :
Sl. No. Item Unit Rate (Rs)

Dismental of 20 / 80 / 100 / 120 MT Gantry Each ###


Fabrication - New Fabrication MTS ###
Fabrication - Old Modification MTS ###
Fabrication of Insert Plate (old Material Cutting, Glossing & Grinding Work) Nos ###
Old Shutter Material Cutting, Glossing & Grinding Work Per Mt. ###
SS Plate Cutting, welding over Gantry box Per Mt. ###
Plate & ISMB dismantling for Batching Plant in all respects. Per Mt. ###
Threading charges for 16mm dia Tie Rod in structure NOS ###
Reinforcement Threading - One Face NOS ###
M.S Pipe Fitting over Crash barrier MTR ###
300mm Dia of Pipe Driving (manually) NOS ###
Cement Unloading BAG ###
Cement Loading BAG ###
Lime Unloading BAG ###
Cement carriage from store to hopper at and cutting into cement hopper BAG ###
Tempporary Pile Bridge - Steel bridge Erection work(MS pipe driving work, Transverse &
longitudinal beam erection work,chequer plate cutting & erection work,stiffner & channel Rmt ###
welding work)
Temporary Pile bridge dismentling Rmt ###
Miscellaneous - Making of walk way platform MTR ###
Miscellaneous - Weep hole fixing NOS ###
Miscellaneous - Sand/soil filling & pitching NOS ###
Miscellaneous - House Keeping in months (Structure Slab Area) SQM ###
Miscellaneouis - Concrete block making NOS ###
Miscellaneous - Labour hutment making SQM ###
Miscellaneous - Cover block making NOS ###
Miscellaneous - Cage making for Segment stacking block NOS ###
Camp Development ###
Excavation Cum ###
Brick work Cum ###
Plastering Sqm ###
Flooring Sqm ###
Rooffing Sqm ###
Door fixing Nos ###
Window fixing Nos ###
Backfilling Cum ###
Pointing Sqm ###
Mat with Material sq.ft ###
Tiles with Material sq.ft ###
False ceiling with Material sq.ft ###
False ceiling dismantling work sq.ft ###
Putty work sq.ft ###
Paint sq.ft ###
Two coat white wash sq.ft ###
Please indicate local P.R.W. labour rates for following items :
Sl. No. Item Unit Rate (Rs)

Door fitting Nos ###


Window fixing Nos ###
Labour charge for door fitting including Handel, Tower bolt, Handel lock & Fittings excluding
No ###
ply as per direction of Engineer In-Charge
Supplying and application of enamal paint including (Door) all material complete as per
No ###
direction of Engineer In-Charge.
Supplying and fitting of glass with putty for windows as per direction of Engineer In-Charge. Sqf ###
Supplying and fixing of Zipsom False Ceiling including all material complete as per direction of
Sqf ###
Engineer In-Charge.
Supplying and fixing of 6mm Ply False Ceiling including all material complete as per direction
Sqf ###
of Engineer In-Charge.
Window: Supplying and application of enamal paint including all material complete as per
No ###
direction of Engineer In-Charge.
Supplying and application of two coat white wash including all material complete as per
Sqft ###
direction of Engineer In-Charge.
Supplying and application of one coat white wash and one coat water proof paint including all
Sqft ###
material complete as per direction of Engineer In-Charge.
Supplying and application of two coat plastic paint (Asian Paint) including all material and
Sqf ###
manpower complete as per direction of Engineer In-Charge.
Supplying and fixing of wall tiles including all material and labour charges complete as per
Sqf ###
direction of Engineer In-Charge.
Door fitting , supplying & fitting of ply wood, painting, all material SQM ###
Supplying & fixing of Window pannel Nos ###
Door fitting, supplying & fitting of ply wood, painting, all material Sqm ###
Supplying and fixing of window with iron frame with glass fitting with all complete as per
No ###
direction of Engineer In-Charge.

Supplying and fixing of door fitting including ply, Handel, Tower bolt, Handel lock & application
of enamal paint including all material (Excluding Door Frame) as per direction of Engineer In- Nos ###
Charge

Supplying and fixing of Aluminium Door with fitting with all complete as per direction of
No ###
Engineer In-Charge.

Supplying, Fitting & fixing of 1.5 Inch Boring 125 feet with PVC Pipe, Iron Pipe, Hand Pump
and all accessories including labour charges with all complete as per direction of Engineer In- Nos ###
Charge.

Supplying, Fitting & fixing of 4 inch Boring 160 feet with 1 HP submersible Motar (CRI /
USHA / Crompton), PVC Pipe, Iron Pipe and all accessories including labour charges with all Nos ###
complete as per direction of Engineer In-Charge.

Supplying, Fitting & fixing of 1.5 Inch Boring 70 feet with Hand pump, PVC Pipe, Iron Pipe and
all accessories including labour charges with all complete as per direction of Engineer In- Nos ###
Charge.
Please indicate local P.R.W. labour rates for following items :
Sl. No. Item Unit Rate (Rs)

Supplying, Boaring, Fitting & fixing of 5/4 Boring 200 feet with 5 HP Sumersible Motar (CRI /
USHA / Crompton), PVC Pipe, Iron Pipe and all accessories including labour charges with all
Nos ###
complete as per direction of Engineer In-Charge. (Boaring 200Ft with iron Pipe
5 HP Sumersible Motar , 1000 Ltr Water Tenk, Other Fittings)

Test ###
Conducting High Strain Dynamic Pile Load Test(Vertical) with PDA on Cast-in-situ Piles
taking necessary readings, interpretation of test results by CAPWAP Analysis and Submitting Nos ###
two Copies of Reports for 1500mm dia pile.
Conducting Lateral Load Test Nos ###
Steel (Physical) Per Sample ###
Steel (Physical & Chemical) Per Sample ###
Cement (Compressive Strength & Setting Time) Per Sample ###
Cement ( Complete Test) Per Sample ###
Water (Construction) Per Sample ###
Water (Drinking) Per Sample ###
Admixture (Chemical) Per Sample ###
Ring and Ball Apparatus, Semi Automatic (Softening Point) Nos ###
Ductillity Testing Machine, Electrical Operated Nos ###
Flash Point (Open) and fire Point Penky Martens Nos ###
Universal Automatic Penetrometer with built-in Timer Nos ###
Digi modified Marshall Apparatus, 100 KN, Single Speed, New Model for 100 mm Dia sample
Nos ###
& 150 mm
Automatic Compactor for 100 mm Bituminous Mixes Nos ###
Absolute Viscosity at 600 C Paises Nos ###
Bitumen Extracter Test Machine Nos ###
Digital Thermometer Nos ###
Mastic Hardness Test Machine (Temp. & Dial Gauge) Nos ###
Polished Stone Value CA (10mm) as per BS:812:114
Per Sample ###
Note:- (Witness Facility Available with Prior Intimation)
Stone Boulder Pitching for Appron ###
Excavation Cum ###
Soil / Granular material Dressing Mannually Sqm ###
Back filling Mannually Cum ###
Boulder Pitching Cum ###
Cleaning of pipe/ Box Culvert (single/Double) man power supply Ls ###
Boulder Shifting (Loading/Unloading) Cum ###
Slope Making (1:2) Sqm ###
Cement Mortor Grouting Sqm ###
Road Work
Tree Cutting - 300mm to 600mm Grith Each
Tree Cutting - 600mm to 900mm Grith Each
Tree Cutting - 900mm to 1800mm Grith Each
Tree Cutting -Above 1800mm Grith Each
Please indicate local P.R.W. labour rates for following items :
Sl. No. Item Unit Rate (Rs)

Cleaning & Grubbing Road Land with Machinery Hectar


Cleaning & Grubbing Road Land only Labour Charges Hectar
Dismentiling of Flexible Pavements Only Labour Charges Cum
Dismentiling of Flexible Pavements with Machinry Cum
GSB with Compation without Material Cum
WMM with compation without Material Cum
Prime Coat Spreading with Machine Sqm
Tack Coat Spreading with Machine Sqm
DBM Laying & Compation Cum
BC Laying & Compation with Machinery without materials Cum
DLC Laying Labour Charges Cum
PQC Laying Labour Charges Cum
RCC Drain Labour Charges without Material (Inner vent 1 H x 1.2 V) Rmt
Kerb Laying Labour Charges Rmt
Road Signage Fixing with M-15 Concrete Nos
RE Pannel Casting Sqm
RE Pannel Erection Sqm
Fixing of W-Beam Crash Barrier Rmt
Aggregate & Sand Rate Details
(For _____________ End)

Distance of Rate Transportation charges from source


Total Price Applicable GST
Sl. No Item unit Name of source source from site "Rates are at Royalty to site incl. loading and unlading Final Rate (Rs.)
(Rs) 5%
in KM. source" charges

1 40 mm MT Rs. 0 0 Rs. 0

2 20 mm MT Rs. 0 0 Rs. 0

3 10mm. MT Rs. 0 0 Rs. 0

4 Stone Dust MT Rs. 0 0 Rs. 0

4 GSB MT Rs. 0 0 Rs. 0

5 Sand MT Rs. 0 0 Rs. 0

Sherpur to Rafiganj
Sherpur to Shekpura
Average Lead
Add. Kacha Road from Quarry to Town
Total Lead for Aggregate
Major Materials Rate
MATERIAL BASE RATES

(A) CEMENT (PER BAG)

Rate+ GST +
Sl. Specify clients or our
Item Unit Tran. +
No. supply
Handling

1 OPC cement 43 Grade PER BAG

(B) Reinforced Steel (PER MT)

Sl. Specify clients or our Rate+ GST +


Item Unit
No. supply TCS
2) Reinforcement bars (tmt)
8 MM (Length: 12 mtrs) Mt
10 MM (Length: 12 mtrs) Mt
12 MM (Length: 12 mtrs) Mt
16 MM (Length: 12 mtrs) Mt
20 MM (Length: 12 mtrs) Mt
25 MM (Length: 12 mtrs) Mt
32 MM (Length: 12 mtrs) Mt

(c) Structural Steel

Sl. Specify clients or our Rate+ GST +


Item Unit
No. supply TCS
1 Structural Steel (ms plate)
3.15 MM Mt
10 MM Mt
12 MM Mt
16 MM Mt
20 MM Mt
25 MM Mt
Structural Steel (Flat and Angles)
6 MM thick and 50 MM wide flat Mt
65X65X6 MM angle Mt
50X50X6 MM angle Mt

(d) Pre-Stressing Materils

Sl. Specify clients or our Rate+ GST +


Item Unit
No. supply TCS
1 HT Strands
12.5mm Mt
15.2mm Mt
Other Stressing Materials
HDPE SEATHING PIPE 107 MM Mtr
Major Materials Rate

Remarks

UNLOADING EXTRA Rs.


----/ Bag

Remarks

Transportation Cost Rs.


_____ / Mt Extra including
GST 18%

Remarks

Transportation Cost Rs.


________ / Mt Extra
including GST 18%

Remarks

Transportation Cost Rs.


_______ / Mt Extra
including GST 18%
_______ / Mt Extra
including GST 18%
Earthwork Rate Calculation : ___________

Approximate Rate of Borrow Area / Kattha for 2meter(6.6ft) depth excavation


RS 25000
=

Area of one Kattha = SQFT - M2

Total soil excavated in one kattha in m3 = - M3

Rate of soil per m3 = #DIV/0!


Say #DIV/0! RS per M3

Rate of Purchase of soil per M3 = #DIV/0! RS per M3

Compaction of soil per M3 up to 3km lead = RS per M3

Cost For Extra lead of soil with Average 18 km Lead at Avg.


RS per M3
of Project @ 8 RS/m3/KM = ###

Royality of soil per M3 = RS per M3


Total cost of
soil per M3= #DIV/0! RS per M3
General Materials Rate

Distance of source
SL NO. ITEMS UNITS NAME OF SOURCE Total price at site for estimate purpose.
from site in KM.

1 Timber : WOODEN BLOCK Per Cft.

2 Coated Plywood - 12mm Ply Per Sq ft

3 Nail Kg.

4 Binding Wire Kg.

5 CGI sheets. Per sheet

6 Bricks. SIZE=230mmx125mmx75mm Per 1000 Nos.

7 Welding Electrodes. Per Pkt.

8 MS Nut-bolt(1/2''x2'') per kg

Conc. Hume Pipe


9 1000 mm dia(NP4) er pcs.
1200 mm dia (NP4)

PVC Pipe
110MM
10 Rmt
150MM
16t0MM

11 Enamal : Yellow / Red / Black Paint Ltr

12 CAUTION TAPE (Safety) Per ROL

13 Foam (2mtr x 1mtr) - White / White Pcs.

14 Shuttering Foam Solution Ltr

15 Shuttering Oil Ltr

16 White Cement Kg.

17 Cotton Waste Kg.

18 Hand Gloves - Cotton Pcs.

19 Hand Gloves - Rubber Pcs.

20 LPG(commercial) Per 19kg gas

21 OXYGEN 7 CUM Cylinder