Professional Documents
Culture Documents
+ + +
LIBRARY
1. General Conditions of the Contract (AIA Document A-201) apply to this project. A1.00 GENERAL NOTES
A Wall Type (see wall type schedule) A1.01 DIMENSION FLOOR PLAN
2. All work shall comply with State and local Building Codes, fire department regulations, utility A1.02 FURNITURE & FIXTURE FLOOR PLAN
company standards, and the best trade practices.
101 Door Type (see door schedule)
3. The General Contractor shall arrange all inspections and tests as specified or required by the
building department and shall pay all costs and fees for same. The Contractor shall secure A Window Type (see window schedule)
all building permits and upon completion of the project (prior to final payment) deliver to the
Owner a Certificate of Occupancy or Use from the building department.
A
A3.0 Building Section
4. All plumbing and electrical work shall be performed by State licensed contractors.
Contractors shall submit all required permits, certificates, and sign-offs to Owner and 1
Architect for their records. A4.0 Wall Section
5. The General Contractor shall verify all dimensions, be familiar with the existing conditions, X
Detail Number
AX.X
and bring any discrepancies to the attention of the Architect prior to submission of
construction proposal and before beginning work. The Drawings reflect conditions reasonably
inferred from the existing visible conditions but cannot guaranteed by the Architect. 1
A4.0
Elevation (without line)
Drawings may be scaled for estimating purposes and for general reference only. For all
SAUDI ARABIA
OBK
other dimensions or locations consult the Architect or refer to dimensions on Drawings.
Verify all dimensions in the field. 3 A5.5 2 Interior Elevation Mark
RIYADH
6. The General Contractor shall lay out all work and be responsible for all dimensions and +8'-0" Elevation Mark
conditions for trades such as electrical, plumbing, etc.
ROOM
7. The General Contractor shall provide and maintain access to the premises at all times. 110 Room Name / Number Project No. RA 173.
8. The Construction Manager shall make the premises secure from the elements and trespass
on a daily basis. A.8 Column Line
+
9. The General Contractor shall keep the construction site free and clear of all debris and keep
out all unauthorized persons. Upon completion of Work, the entire construction area is to be
CL Centerline
thoroughly cleaned and prepared for occupancy by Owner. All materials and debris resulting
from the Contractor's work shall be removed from the site and disposed of properly. Care
shall be taken during construction that no debris or materials are deposited in any Right of
Way area.
1 Revision Tag ENERGY CODE
SYSTEM
Windows:
+ (YEAR) IECC CODE REQUIRED MINIMUMS
U-value: 0.00
14 DEC 2022
10. The General Contractor shall be responsible for protecting all existing and new conditions A.C.I. AMERICAN CONCRETE INSTITUTE Skylights: U-value: 0.00
+
and materials on the site. Any damage caused by or during the execution of the Work is the BLDG. BUILDING Ceiling: RXX
Revisions
Contractor's responsibility and shall be repaired to the Owner's satisfaction at the CONC. CONCRETE Walls: RXX or XX (cavity) + X (insulated shtg)
Contractor's expense. C.J. CONTROL JOINT Floor: RXX (or fill framing cavity RXX min) 1
14. Written words take precedence over drawn lines. Large-scale details and plans take
GALV.
GYP.
I.D.
JT.
GALVANIZED
GYPSUM
INSIDE DIAMETER
JOINT
+ WALL TYPE SCHEDULE
DOOR SCHEDULE
MECH. MECHANICAL HARDWARE SCHEDULE
precedence over smaller details and plans. Should a conflict arrive between the MIN. MINIMUM WINDOW SCHEDULE
Specifications and Drawings, the requirements deemed most stringent shall be used. N.T.S. NOT TO SCALE PLUMBING SCHEDULE
NO. NUMBER ELECTRICAL SCHEDULE
15. Minor details not usually shown or specified but necessary for proper and acceptable O.C. ON CENTER APPLIANCE SCHEDULE
construction, installation, or operation of any part of the Work as determined by the Architect OPG. OPENING FINISH SCHEDULE
shall be included in the Work as if it were specified or indicated on the Drawings. O.D OUTSIDE DIAMETER Notes
U.N.O. UNLESS NOTED OTHERWISE
16. All architectural drawings and construction notes are complimentary. What is indicated and
SPECIFICATIONS
1. Your note number one.
REF. REFERENCE
+
2. Your note number two.
called for by one shall be binding as though called for by all. R. RISER 3.
R.O. ROUGH OPENING
17. No deviation from the Drawings or Specifications or intent of same shall be made without RM. ROOM 01 GENERAL REQUIREMENTS
the Architect's written authorization. S/STL. STAINLESS STEEL 02 SITE WORK
STRUCT. STRUCTURAL 03 CONCRETE
18. All Work shall be guaranteed for one year after final approval. The General Contractor shall SPEC. SPECIFICATIONS 04 MASONRY
sign the written guarantee as provided by the Owner. The guarantee shall cover all general T.O. TOP OF (...) 05 METALS
and subcontractor work. All defects discovered during this period shall be repaired to the T.O.CONC. TOP OF CONCRETE 06 WOOD
Owner's satisfaction at the Contractor's expense. T.O.F. TOP OF FRAMING Project North
07 THERMAL + MOISTURE PROTECTION
T.O.STL. TOP OF STEEL 08 DOORS + WINDOWS
19. All dimensions are to face of stud or centerline of structure unless otherwise noted (UON). T.O.W. TOP OF WALL 09 FINISHES
T. TREAD 10 SPECIALTIES
20. Door and window details are indicated on the Door and Window Schedules. TYP. TYPICAL 11 EQUIPMENT
@ AT 12 MECHANCIAL
21. Door and window dimensions are to centerlines of units UNO. + AND 13 ELECTRICAL
BD. BOARD
A.F.F. ABOVE FINISHED FLOOR
U.N.O. UNLESS OTHERWISE NOTED
V.I.F. VERIFY IN FIELD NIL
Scale
GENERAL NOTES
A1.1
Sheet No.
LIBRARY OBK
SAUDI ARABIA
RIYADH
Project No. RA 173.
14 DEC 2022
+
Revisions
1
Notes
Project North
Plane962440%
Plane9604
Plane9605
Plane9599
SOIL014
Plane9601
Plane9565
Plane9600
Plane9606 40%40%
40%
Scale NIL
FLOOR PLAN
A1.2
Sheet No.
SYMBOL INFORMATION
LIBRARY
WALL HANGING LIGHT.
SPOT LIGHT
SAUDI ARABIA
the RIYADH
DOUBLE SPOT LIGHT
TRACK LIGHT
14-DEC-2022
+
Revisions
CHANDLIER 1
Notes
Project North
Plane962440%
Plane9604
Plane9605
Plane9599
SOIL014
Plane9601
Plane9565
Plane9600
Plane9606 40%40%
40%
Scale NIL
LIGHTING PLAN
A1.3
Sheet No.
SYMBOL INFORMATION
FB1
LIBRARY
FB1
FB1
FB1
SAUDI ARABIA
the RIYADH
Project No. RA 173
FB1
FB1
FB1
FB1
14-DEC-2022
+
Revisions
1
Plane9624
Plane9604
Plane9605
Plane9599
Plane9601
Plane9565
Plane9600
Plane9606
SOIL014 40%
40% 40%
40%
Plane962440%
Plane9604
Plane9605
Plane9599
SOIL014
Plane9601
Plane9565
Plane9600
Plane9606 40%40%
40%
Notes
Project North
FB1 FB1
Scale NIL
Plane962440%
Plane9604
Plane9605
Plane9599
SOIL014
Plane9601
Plane9565
Plane9600
Plane9606 40%40%
40%
POWER PLAN
A1.4
Sheet No.