You are on page 1of 4

CL

50mm dia upright rail/ balusters out


of 4mm thick stainless steel sleeve
encasement on 32mm dia x 2mm
thick corrosion resistant steel
core.

15mm dia stainless steel tube

Floor to finishes schedule

A[44]01cTypical elevation
CL Scale 1:10

The concrator should provide shop drawings before fabrication.


50 50
.

All component and assembly samples to Architect's approval


50 dia stainless steel tube
handrail to Architect's appoval

180
50mm dia upright rail/ balusters
out of 4mm thick stainless steel

180
sleeve encasement on 32mm
. dia x 2mm thick corrosion
resistant steel core.

1,000
980
180
50 dia mild steel tube 15mm dia stainless steel tube
handrail to architects approval.
.

This drawing is only illustrative,


5mm thick ms plate 20mm thick granite

180
welded to 5mm ms double plate
to Aarchitect's approval
C
L

150
5mm thick ms double plate
welded to 5mm thick ms plate

10
.

20 20

DISCLAIMER:
20
20
A[44]01d Plan - Typical baluster joint
Scale 1:5

A[44]01a Stainless Steel Handrail detail


A(44)01-Stainless steel Railing detail Scale 1:10
A[44]01b Stainless steel Hand rail section
1 Scale 1:10
1 : 10
NOTES Revisions: Client: Project Title:
rev date description Architect: Drawn: Checked:
1. This drawing is copyright. 7. Walls below 200mm thick to be reinforced with hoop iron at every alternate course. ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING
JULIUS DDAMULIRA C.G.O R.R
2. Do not scale off this drawing. 8. Depth of foundations to be decided on site.
3. All levels and dimensions to be checked on site before any Reg. No. 196 Date: Scale:
9. pv denotes permanent air vents over doors and windows as shown on drawings. Drawing Title:
building work commences. Location: Prac.No. 3101 MARCH 2020
11. Drain pipes passing under tarmac, driveways, and buildings to be encased in 150mm Stainless Steel
4. Any discrepancies to be reported to the office of the consultant. thick concrete surround. PLOT 2A,&2-4,BUTABIKA ROAD, Railing Detail
BUTABIKA,KAMPALA DISTRICT Published: 9/9/2021 12:06:57 1 : 10 @ A3
5. All work to be strictly in accordance to with the standard specifications and notes. 12. All reinforced concrete work to Structural Engineer's drawings.
6. This drawing is to be read in conjunction with specifications and all other relevant 13. All sanitary works to the entire satisfaction of MoH.
Job no. Drawing no.
TEL:+256 701-650587 A(44)01
drawings. 14. All roads, storm water drainage and foul sewerage to Civil Engineer's drawings.
5mm thick ms plate

The concrator should provide shop drawings before fabrication.


All component and assembly samples to Architect's approval
15mm mild steel solid rail

5mm thick ms double plate


welded to 5mm thick ms plate

This drawing is only illustrative,


150mm high plinth to
finishes inclusive.

.
A[44]02 c Typical elevation CL
Scale 1:10

50 dia mild steel tube

DISCLAIMER:
to Architect's approval

5mm thick ms plate


welded to 5mm ms double plate

15mm mild steel solid rail

5mm thick ms double plate


.
welded to 5mm thick ms plate

50 dia mild steel tube 150mm high concrete upstand


handrail to architects approval. .

5mm thick ms plate 8mm thick porcelain tile,


welded to 5mm ms double plate sample to Architect's approval
CL
cement screed

.
Paint to cement plaster
5mm thick ms double plate Rc tread
welded to 5mm thick ms plate

12
Staircase soffit to
finishes schedule
A[44]02d Plan - Typical baluster joint A[44]02b Mild steel Hand rail section
Scale 1:5
Scale 1:10
A[44]02a Mild Steel Handrail detail
Scale 1:10
A(44)02-Steel Railing detail
1
1 : 10
NOTES Revisions: Client: Project Title:
rev date description Architect: Drawn: Checked:
1. This drawing is copyright. 7. Walls below 200mm thick to be reinforced with hoop iron at every alternate course. ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING
JULIUS DDAMULIRA C.G.O R.R
2. Do not scale off this drawing. 8. Depth of foundations to be decided on site.
3. All levels and dimensions to be checked on site before any Reg. No. 196 Date: Scale:
9. pv denotes permanent air vents over doors and windows as shown on drawings. Drawing Title:
building work commences. Location: Prac.No. 3101 MARCH 2020
11. Drain pipes passing under tarmac, driveways, and buildings to be encased in 150mm Steel Railing detail
4. Any discrepancies to be reported to the office of the consultant. thick concrete surround. PLOT 2A,&2-4,BUTABIKA ROAD,
BUTABIKA,KAMPALA DISTRICT Published: 9/9/2021 12:07:02 1 : 10 @ A3
5. All work to be strictly in accordance to with the standard specifications and notes. 12. All reinforced concrete work to Structural Engineer's drawings.
6. This drawing is to be read in conjunction with specifications and all other relevant 13. All sanitary works to the entire satisfaction of MoH.
Job no. Drawing no.
TEL:+256 701-650587 A(44)02
drawings. 14. All roads, storm water drainage and foul sewerage to Civil Engineer's drawings.
Clear silicone

10mm tempered glass

100mm high aluminium channel

150mm high concrete upstand

A[44]03c Typical elevation


Scale 1:10

Rubber in Handrail
50 dia stainless steel tube
handrail to Architect's appoval Handrail

Silicone

10mm tempered Glass

10mm tempered glass


A[44]03d Plan - Typical baluster joint
Scale 1:5

950
Clear silicone

100mm high aluminium


. channel
to Architect's approval

10mm tempered
glass Silicone

Fastening Rubber Washer


Wedge

150
150mm high concrete upstand
Washer Aluminium Channel
cement screed
Rubber for glass
Finish Floor Level Rc tread
Counter sunk screw

Expendable nut A[44]03b Frameless Glass Handrail section


Floor slab to SE's Scale 1:10
details

A[44]03e Plan - Typical channel installation A[44]03a Frameless Glass Railing detail DISCLAIMER:
Scale 1:10 This drawing is only illustrative,
Scale 1:5
The concrator should provide shop drawings before fabrication.
A(44)03-Glass Railing detail All component and assembly samples to Architect's approval
1
1 : 10
NOTES Revisions: Client: Project Title:
rev date description Architect: Drawn: Checked:
1. This drawing is copyright. 7. Walls below 200mm thick to be reinforced with hoop iron at every alternate course. ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING
JULIUS DDAMULIRA C.G.O R.R
2. Do not scale off this drawing. 8. Depth of foundations to be decided on site.
3. All levels and dimensions to be checked on site before any Reg. No. 196 Date: Scale:
9. pv denotes permanent air vents over doors and windows as shown on drawings. Drawing Title:
building work commences. Location: Prac.No. 3101 MARCH 2020
11. Drain pipes passing under tarmac, driveways, and buildings to be encased in 150mm Glass Railing detail
4. Any discrepancies to be reported to the office of the consultant. thick concrete surround. PLOT 2A,&2-4,BUTABIKA ROAD,
BUTABIKA,KAMPALA DISTRICT Published: 9/9/2021 12:07:08 As indicated @ A3
5. All work to be strictly in accordance to with the standard specifications and notes. 12. All reinforced concrete work to Structural Engineer's drawings.
6. This drawing is to be read in conjunction with specifications and all other relevant 13. All sanitary works to the entire satisfaction of MoH.
Job no. Drawing no.
TEL:+256 701-650587 A(44)03
drawings. 14. All roads, storm water drainage and foul sewerage to Civil Engineer's drawings.
Line of wall finish to finishes
schedules

Line of wall finish to finishes schedules

42
43 21
50 dia stainless steel tube
handrail to architects approval. 50 dia mild steel tube
handrail to architects approval.

50

12mm dia stainless steel solid bar


to architects approval.

81° 30

77
90°
R 47
100

12mm dia mild steel solid bar


R30
to architects approval.

30
65mm dia ss plate with 4 no.5mm

35
dia screw holes & screws with

900mm from ffl/step nosing


65
1,050mm from ffl/step nosing

12mm m.s solid bar baluster

70

35
welded with angle
brackets

68

68
70mm dia ms plate with 3 no.5mm dia
screw holes & screws.

75

50 dia galvanised m.s. receptacle


with 15mm flange for screws
grouted into r.c. wall
finished floor level

finished floor level


A[44]04b Mild steel Handrail detail
Scale 1:2
A[44]04a Stainless steel Handrail detail
Scale 1:2 DISCLAIMER:
This drawing is only illustrative,
The concrator should provide shop
A(44)04-Handrail details drawings before fabrication.
All steel components are to be primed and
1 painted to Architect's approval
1:2

NOTES Revisions: Client: Project Title:


rev date description Architect: Drawn: Checked:
1. This drawing is copyright. 7. Walls below 200mm thick to be reinforced with hoop iron at every alternate course. ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING
JULIUS DDAMULIRA C.G.O R.R
2. Do not scale off this drawing. 8. Depth of foundations to be decided on site.
3. All levels and dimensions to be checked on site before any Reg. No. 196 Date: Scale:
9. pv denotes permanent air vents over doors and windows as shown on drawings. Drawing Title:
building work commences. Location: Prac.No. 3101 MARCH 2020
11. Drain pipes passing under tarmac, driveways, and buildings to be encased in 150mm Handrail Details
4. Any discrepancies to be reported to the office of the consultant. thick concrete surround. PLOT 2A,&2-4,BUTABIKA ROAD,
BUTABIKA,KAMPALA DISTRICT Published: 9/9/2021 12:07:13 1:2 @ A3
5. All work to be strictly in accordance to with the standard specifications and notes. 12. All reinforced concrete work to Structural Engineer's drawings.
6. This drawing is to be read in conjunction with specifications and all other relevant 13. All sanitary works to the entire satisfaction of MoH.
Job no. Drawing no.
TEL:+256 701-650587 A(44)04
drawings. 14. All roads, storm water drainage and foul sewerage to Civil Engineer's drawings.