Professional Documents
Culture Documents
Trouble Report - TSFTE-99
Trouble Report - TSFTE-99
: SF-AUX-34
ASHUGANJ POWER STATION
REVISION NO.: 00
COMPANY LIMITED
FORMS EFFECTIVE DATE: 14 MARCH 15
TROUBLE REPORT
Control Room: Shift, 400MW CCPP (East)
28-Jun-23
Mohammad Fayezur Rahman
Executive Engineer (Shift)
Copy to:
1. Md. Alamgir Kabir, Executive Engineer (Operation), Operation, 400MW CCPP (East)