ANNEX1

On-Site Photos of Key Check Points

01. Hole depth 02. Pole verticality 03. Guy installation

04. Pole protection 05. Ground resistance 06. Cable spacing and protection

07. Cable fixed on new pole 08. Cable Reservation and Fixing 09. Process quality in joint closure
12. Safe distance from other
10. Joint closure fixing 11. Installation of cabinet & box
facilities

13. Duct Plugging 14. Plugged for waterproof 15. Cable tag in CO

16. ODF rack installation 17. Grounding wire installation 18. Fiber termination

* Do not forget meter marks for outdoor and indoor. Upload all the photos in EPMS using this template,
OSP Site Access and Backbone Acceptance Photo Gallery.
* All the poles should be straight in the photo, no leaning pole should be upload.

MAKE SURE ALL THE PHOTOS ARE TRUE AND PASSED IN QUALITY STANDARDS.