QUOTATION FOR SUPPLY & INSTALLATION OF HYDRAULIC


ELEVATOR
Date: 05/10/2023

To
SHRUTHI REDDY
KOMPALLY
9949209135

Dear sir(s)/Madam,

Sub: Quotation for Supply & Installation of 408 Kgs Capacity 6


Persons Hydraulic Lift (Kompally)

We take this opportunity to briefly explain to you that this company has been promoted by
a group of engineers who are experienced in various fields of the lift industry.

As you are aware, lift service calls should be attended promptly. To achieve this
practically, we maintain the optimum stock of spares required in our service centers
manned by efficient service engineers who are trained thoroughly and can render
satisfactory after-sales service.

All the components used in our lifts are subjected to very stringent quality control
procedures since we strongly believe that quality product can provide real value for your
investment.

Yours faithfully,

For Lorven Elevators

LORVEN HOMES PVT. LTD.


Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627
LORVEN
ELEVATORS
Material specification
No. of elevators : ONE
Type : Passenger carrying
Capacity : 6 persons (408 kgs)
Speed approx. : 0.53 meters per second
Travel : 6.8 meters approx.
No. of floors to be served : Ground + 2
No. of landing entrances : 3 Landings
Available well size : 1219.2 (MM wide1219.2*MM depth)
Required well size : 1219.2*1219.2 (MM wide*MM depth)
Cabin Inner size. : 1119.2*819.2 (MM wide*MM depth)
Clear Opening. : 800 mm
Required pit size : 400 mm.
Position of car entrance : Front
Car enclosure : SS cabin
Car fittings : Light and fan with fall ceiling
Car flooring : PVC –standard
Entrance protection – car : Curtain sensor
Entrance protection – landing : SS big vision swing door
Type of control system : Microprocessor-based down the collective
controller.
Type of guide rails : 16*65*75 {Male – Female}
Power supply : 5 H.P, AC 400/440 volts, 3phase, 50 cycles
Rope : 8 MM, Usha Martin {ISO}
Indicators : Up/Dn arrow with floor indication.

Special features:
 Battery-operated emergency bell,
 Bilingual voice announcement for door open warning,
 Up and down arrows, digital floor indications at car
and landing, and call registration at all landing and
in car body,
Auto fan in car body, ARD Device.

LORVEN HOMES PVT. LTD. PRICE SCHEDULE


Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627
LORVEN
ELEVATORS

Design, supply, installation, testing, and elevator commissioning as per specification.


Rs: 8,10,000.00/- (Eight Lakhs Ten Thousand Rupees Only) + 18% GST
INSTALLATION OF STRUCTURE PRICE WILL BE:
Rs: 1,55,000/- (One Lakhs Fifty-Five Thousand Rupees Only) +18%GST
OUTER COVERING OF ACP SHEET PRICE WILL BE APPROX:
280per sft
Rs: 1,16,760/- (One Lakh Sixteen Thousand Seven Hundred Sixty Rupees
Only) +18% GST
CIVI L WORK PRICE WILL BE:
Rs: 65,000/- (Sixty-Five Thousand Rupees Only) +18%GST
3 PHASE CONNECTION PRICE WILL BE:
Rs:30,000/- (Thirty Thousand Rupees Only) +18 %GST
GOVA PRICE WILL BE:
Rs: 20,000/- (Twenty Thousand Rupees Only) +18 %GST

GRAND TOTAL: 11,96,760/- (Eleven Lakhs Ninety-Six Thousand Seven

Hundred Sixty Rupees Only) +18 % GST

TERMS OF PAYMENT
LORVEN HOMES PVT. LTD.
Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627
LORVEN
ELEVATORS
 50% of the contract value as advance payment.
 45% of the contract value against L/R.
 05 % of the contract value after handing over the site.

TERMS AND CONDITIONS

 In case of the offer is for more than one elevator, each elevator shall
be treated as an individual contract.

 We shall have the lien on the elevator until full payment is made to
us and we shall be entitled to recover our dues in the manner found
appropriate in our opinion.

 If there is any delay in handing over the completed site in all respects
for erection within one year from the date of the contract, you will be
liable to pay us an extra 12% increment of the actual contract price.

 If there is no permanent power supply received from authorities by


you and erection work.

SAFETY FEATURES & EQUIPMENT:


Slack cable main line disconnect switch, car gate & landing door interlocks
(Mechanical & Electrical Safety) broken cable instantaneous safety, overrun Switch
Both Terminal floor Sensing switch.

CAR FRAME:

Cantilever suspension made of strong steel frame with angle ironed heavy
Duty guide shoes and roller.

HYDRAULIC CONTROL:

The valves do include a safety check valve, direction control valve, zero Least
poppet valve, pressure compensated flow control proportional valve with electronic
drives, solenoid operated and designed to open and close Gradually to give smooth
control based on the special manifold at the top of power Pack tank with suitable
motor & pump.

Valve: -OMER MAKE FROM ITALY,


LORVEN HOMES
Pump: PVT.
-Autos LTD.
Make Italian products.
Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627
LORVEN
ELEVATORS
MOTOR
Vertical Flanged mounted 3 phase ‘’F’’ class insulation from OMER Make.

CONNECTION PIPE:

High-Pressure R2 series double-barded flexible pipe.

OIL:

Special hydraulic nontoxic biodegradable 68 nos. Excellent lubricity Extends


equipment life high viscosity index, creates improved viscosity Stability, operating
temp. 15 to 155 f.

WIRE ROPE:
Wire rope consists of 3 diameters 8*19 traction steel cables self-lubricated (USHA
MARTIN Ranchi’s) if required.

CYLINDER:

The cylinder is manufactured from heavy-duty steel pipe fitted with a solid Steel
piston rod of E N 8 B Material ground hard chrome plated.

OIL SEAL:

Polyurethane “U” cup seal, bronze field P T F E (Poly Tetra Floor Ethylene) step
seal, neoprene Rubber ‘O’ Rings. (Imported Material)

HAND PUMP:

Enables the elevators to be raised, and pressure is tasted during the inspection.

GUIDE RAIL: 16 MM heavy-duty T rails securely attached to the hoist way


structure by a Steel bracket.

CONTROL PANEL:

Microprocessor-based controller with the full collective system, phase failure


Detection, and in-built voltage monitoring unit, overpower protection, bipolar Led
indicator, high reliability, gold flashed contacts, and high dielectric strength.

COMPARISION OF HYDRAULIC LIFT &TRACTION LIFT. (FEATURES)


LORVEN HOMES PVT. LTD.
Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627
LORVEN
ELEVATORS
There is no need for a Machine room over the shaft. (Less construction Coast &
Earthquake Safety) Single Time 3 phase power used in Up Direction Only.
(Permanent half Power saving). Installed the power unit nearest to the shaft on the
Ground floor. (Minimum space Requirement.) Hand pump installed built with our
main valve for manually up in Emergency. (Safety side) Manual lowering valve
built in our main valve for manual emergency down.3side opening arrangement as
per customer requirement. Minimum service maintenance, with comparison traction
lift.

SAFETY FEATURES & EQUIPMENT:

Slack cables mainline disconnect switch, car gate & landing door interlocks
(Mechanical & Electrical Safety) broken cable instantaneous safety, overrun Switch
Both Terminal floor Sensing switch.

CONTROL PANEL

Microprocessor-based controller with the full collective system, phase failure


Detection, and in-built voltage monitoring unit, overpower protection, bipolar Led
indicator, high reliability, gold flashed contacts, and high dielectric strength.

DELIVERY SCHEDULE AND COMPLETION OF WORK:


LORVEN HOMES PVT. LTD.
Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627
LORVEN
ELEVATORS
The material will be delivered to the site within three weeks from the date of receipt
of the final layout drawing duly approved by you. If in any case, the handing over of
the site duly complying with the requirements as specified in the annexure is
delayed from your side for any reason, whatsoever, the work of installation and
handing over shall also be suitably, deferred from the date of handing over the site,
complete in all respect. Accordingly, necessary extension to the completion period
shall be granted, without any preconditions. We do not accept any responsibility,
whatsoever, for any delay, in the delivery and installation of the lift in the event of
the customer.
 Not strictly complaining about the terms of payment
 Not completing, in time, the preparatory works enumerated in the annexure
hereto.
 Not furnishing, in time the necessary technical details / finally approved
layout drawing, without prejudice to our claims under this contract.

The above-mentioned delivery and erection period are given in good faith based on
prevailing working conditions and are subject to extensions to cover any delays
resulting, directly, or indirectly from any force major conditions such as acts of
government, strikes, lockouts, fire, accidents, thefts, floods, riots,
Civil commotion, war, energy crisis acts of God or any other force major conditions,
etc., and thereby you shall not be entitled to claim any damages for any loss
incurred, directly or indirectly, due to such delays. All materials supplied by us shall
remain our property until payment is received in full or until the lift is handed over.
We reserve the right to remove any equipment supplied by us at your cost in case of
default of any payments by you, irrespective of the manner of attachment to the real
sale, mortgage, or lease of premises.

ERECTION:

The erection of the lift will take 6 weeks for each lift after the lift well-constructed
by you is ready in all respects with scaffolding etc., as detailed in the annexure with
the necessary power supply to enable our staff to work without any hindrance.

HANDING OVER LIFTS


LORVEN HOMES PVT. LTD.
Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627
LORVEN
ELEVATORS
To minimize inconvenience to both parties, the client shall agree to take over the lift
as soon as the installation is completed. Our erection supervisor will test and adjust
the lift and will give you about a week’s prior notice to take over the lift. Please note
that our erectors have standing instructions not to allow customers’ usage of the lift
until they are officially taken over.

WARRANTY

12 months free maintenance will be given from the date of handing over the lift to
the customer as per company’s rules and the buyer agrees that no third party will be
allowed to interfere with the installation or its parts, in any manner, whatsoever,
during the staid period.

We guarantee our materials and workmanship for a period of one year except for
electrical accessories of cabin-like fan, tube, switch, etc., after the lift is put in
operation but any damages to our materials during the storage period at your site is
not governed by the guarantee clause. Any defects/faults arising out of our materials
and workmanship during normal operations and proper use will be rectified/made
good or the complete replacement of the damaged part(s) will be done free of cost.
Repair/replacement of component(s) will be done as per our option.

SURPLUS MATERIALS

All surplus materials, consumable goods, packing cases, tools, wiring materials,
etc., used during the execution of the contract are our sole property and will be
removed by us at our discretion as and when necessary/completion of work.

FREE SERVICE
Free service, once in every quarter, for the first 12 months will be carried out after
the lift has been handled over or offered for inspection. The date of free service will
remain unchanged irrespective of any delay in building completion, availability of
permanent power supply, inspection, taking over, or commencing the use of the lift.

ARBITRATION
In the event of any difference(s) or dispute(s) in connection with this contract
agreement over the rights or obligations of the parties hereto, the disputes shall
be settled by arbitration in Hyderabad, and courts in Hyderabad City shall have
exclusive jurisdiction.

CANCELLATION
LORVEN OF CONTRACT
HOMES PVT. LTD.
Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627
LORVEN
ELEVATORS
In the event of cancellation of the contract, we shall be charging you as follows.
 20% of the contract value, if the order is cancelled with in 30days from the
date of signing the contract.
 50% of the contract value after 30 days and commencement of work.

INTEREST
The rate of 24% per annum will be payable to us on all amounts remaining
unpaid after 15 days from the date of completion of work.
CONCLUSION OF CONTRACT
This draft contract or offer is valid up to 90 days from the date of the offer for
acceptance by the customer. The contract, however, shall be deemed concluded
and have come into force only on confirmation by the authorized signatory of the
company after the assignment of lift work.

SIGNATURE OF THE CUSTOMER WITH SEAL For Lorven Elevators

Authorized Signatory

CUSTOMERS CONTRACT OBLIGATIONS


LORVEN HOMES PVT. LTD.
Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627
LORVEN
ELEVATORS
The tender excludes, the following items and it shall be responsibility of the
customers to provide these to meet our requirements.

1. The lift well should be reasonable plumb and completed in all aspects.
2. The lift pit should be waterproof with necessary concreting done and its
depth should be as per our drawing.
3. Suitable weatherproof storage room with locking arrangement, preferable at
the ground floor level near lift well for safe custody of our materials.
4. To do all cuttings of walls, floors, or partition together with any
repairs made necessary thereby.
5. You must complete your necessary work and running of mains and
obtaining power so as not to cause any delay in the completion of our
work.
6. Scaffolding in the lift well as per our drawing.
7. Carrying out all minor builder works as per requirements of our site
engineer/ erector inclusive of grouting, making pockets for landing
boxes, etc.,
8. You should provide a 3-phase and single-phase power supply with suitable
earthling and lighting arrangements with suitable switches & starters as per
requirements in the machine room. All conductors should be copper four
cores – armored cable (for 3 phase power supply).
9. Lift shaft should be 3 – a pin plug point and bulb at every second landing.

We confirm the above FOR Lorven Elevators

SIGNATURE OF THE CUSTOMER WITH SEAL

LORVEN HOMES PVT. LTD.


Plot No. 10, 4th Floor, +919100098900
Patwari Enclave, Above ICICI ATM, Opp. IDPL Colony, +919100098901
Balanagar, Hyderabad - 500 037. 04049546627