This Supplemental Bulletin No. S23-C7-030 is issued to to amend provisions in the Bidding
Documents (BDs) for hereunder projects as follows:
This Supplemental Bulletin shall form an integral part of the said Bidding Documents.
ALTIUS A. ENRIQUEZ
Chief, Quality Assurance Section
BAC Chairman
A.1.4 (1)
In Figures: Php In Figures: Php
PART B OTHER GENERAL REQUIREMENTS
Miscellaneous Survey and Staking L.S. 1.00 In Words: Pesos In Words: Pesos
B.4(10)
In Figures: Php In Figures: Php
Project Billboard/Signboard each 2.00 In Words: Pesos In Words: Pesos
B.5(1)
In Figures: Php In Figures: Php
Occupational Safety and Health mos. 8.53 In Words: Pesos In Words: Pesos
Program
B.7(1)
In Figures: Php In Figures: Php
Mobilization / Demobilization L.S. 1.00 In Words: Pesos In Words: Pesos
B.9(1)
In Figures: Php In Figures: Php
Craneway L.S. 1.00 In Words: Pesos In Words: Pesos
B.18(2)
In Figures: Php In Figures: Php
PART C EARTHWORKS
Subgrade Preparation, Common sq.m. 522.50 In Words: Pesos In Words: Pesos
Material
105(1)a
In Figures: Php In Figures: Php
PART E SURFACE COURSES
Portland Cement Concrete Pavement sq.m. 522.50 In Words: Pesos In Words: Pesos
(Unreinforced) - 0.20 m thick, 14 days
311(1)b1
In Figures: Php In Figures: Php
PART L FLOOD AND RIVER CONTROL AND DRAINAGE
L-A EARTHWORKS
Clearing and Grubbing sq.m. 1,359.00 In Words: Pesos In Words: Pesos
1700(1)
In Figures: Php In Figures: Php
Individual Removal of Trees, 150 - each 2.00 In Words: Pesos In Words: Pesos
300 mm dia.
1700(3)a1
In Figures: Php In Figures: Php
Structure Excavation, Common Soil cu.m. 1,616.00 In Words: Pesos In Words: Pesos
1702(1)a
In Figures: Php In Figures: Php
Embankment, From borrow cu.m. 773.00 In Words: Pesos In Words: Pesos
1704(1)b
In Figures: Php In Figures: Php
Aggregate Subbase Course cu.m. 104.50 In Words: Pesos In Words: Pesos
1707(1)
In Figures: Php In Figures: Php
L-B BANK AND SLOPE PROTECTION WORKS
Stone Masonry cu.m. 1,917.00 In Words: Pesos In Words: Pesos
1711(1)
In Figures: Php In Figures: Php
Crushed Aggregate Base Course cu.m. 9.00 In Words: Pesos In Words: Pesos
1709(1)
In Figures: Php In Figures: Php
Concrete, Slope Protection cu.m. 264.00 In Words: Pesos In Words: Pesos
1712(1)
In Figures: Php In Figures: Php
Structural Steel Sheet Piles, m. 3,144.00 In Words: Pesos In Words: Pesos
Furnished
1716(6)
In Figures: Php In Figures: Php
Structural Steel Sheet Piles, Driven m. 3,144.00 In Words: Pesos In Words: Pesos
1716(12)
In Figures: Php In Figures: Php
Sheet Piles, Steel, Cofferdamming m. 1,638.00 In Words: Pesos In Words: Pesos
1717(2)a2
In Figures: Php In Figures: Php
Railings l.m. 209.00 In Words: Pesos In Words: Pesos
1722(3)
In Figures: Php In Figures: Php
In Words: Pesos In Figures: Php
TOTAL
Submitted by:
Position
Name of Bidder