You are on page 1of 2

MEDHAJ TECHNO CONCEPT PVT. LTD.

Ref.: MTCPL/PuVVNL/PMA-ADB/2022-2023/GEN/12604 Dated:22-2-2023

To,
The Superintending Engineer,
EDC Deoria
Purvanchal Vidyut Vitaran Nigam Limited,
Uttar Pradesh.

Sub: Project Management Agency (PMA) for implementation of Uttar Pradesh Distribution Rehabilitation
Project under PuVVNL: Non-conformities observed during inspection-Reg.

Ref: 1. LOI No. 6528/PuVVNL/ADB/LT AB Cable/PMA/LOI dated 19.11.2020


2. Agreement dated 18.12.2020

Dear Sir,
This is to inform that during inspection of execution works of Stambh Power System Ltd in Deoria Block of
Deoria District, it was observed that at some locations execution has not been done as per the scope of
work and technical specifications of project. Details of non-conformities are tabulated below.

Sr_No Village Habitation Observation/Variation NC Type Reference

1 Pipra Pipra 1: LTDB earthing not installed at Critical Image:- 1


chandrabhan chandrabhan DTR.
2. Bi metallic clamp not used at DTR Critical

2 3: Pole numbering not done. Minor Image:- 2


4: Earthing of LT pole not done. Critical

3 5: One span AB cable stringing not Major Image:- 3


done.
The site representative of TKC has been advised to set right the non-conformities. The TKC may kindly be directed
from your end also to take the corrective action at the earliest.

Assuring you the best of our services at all points of time.

Thanking you,
Yours faithfully

Santosh Kumar
Field Supervisor(EDC Deoria)
MTCPL
CC: 1: Chief Engineer Distribution, Gorakhpur Zone, PuVVNL
2. Chief Engineer ADB, PuVVNL Varanasi.
3. M/s Stambh Power System Pvt. Ltd. Deoria.
Image: 1 Image: 2

Image: 3