You are on page 1of 10

East India Udyog Limited

(Discrepancy report of First stage RQM)

Of

Village Electrification works under

RE-DDUGJY-New Project

In State Jharkhand

Location:

Name of Village : BARA GORO

Census Code No. : 370289

Name of Block : Ramgarh

Name of District : Dumka

Rural Electrification Corporation Limited


A Government of India Enterprise
Page 1
Annexure-II
Quality of Installation (workmanship) Showing type of defect, category, their location
in photograph & SLD

S. No.
Description of Defects Picture Location as per Remarks
No. SLD
Distribution Transformer
1. Substation numbering not done Photo 1 DTR 1 Rectification Done
2. Stay found lose Photo 1 DTR 1 Rectification Done
3 Oil not found in breather cup Photo 1 DTR 1 Rectification Done
11 KV Line
4 Pole numbering not done Photo 2 HT-2 & all HT Pole Rectification Done
5 Stay angle and winding not proper Photo 3 HT 1 Rectification Done
LT line
6 Pole numbering not done Photo 4 All LT Pole Rectification Done
7 Stay found lose Photo 5 ELT 1 Rectification Done
BPL Connection
8 Wiring not dressed properly Photo 6 Meter no-736816 Rectification Done

9 LED bulb not found Photo 6 Meter no-736816 Rectification Done


10 PVC pipe not found Photo 6 Meter no-736816 Rectification Done
Total 10

Rural Electrification Corporation Limited


A Government of India Enterprise
Page 2
Photographs (with good resolution and zoom) with underlying
text describing defects
SOR: DTR (Before)

Photo No. 1 Substation numbering not done, Stay found loose, oil not found in breather cup, glands not provided.

3
Compliance: After rectification of Photo No 1DTR numbering done, Arcing horn aligned,
breather replaced. (Remarks: Ther is no extra place is available to install Gland)

4
SOR: HT Line (Before)

Photo No. 2 Pole numbering not done and stay lose at H-2.

Compliance: After Rectification of Photo No 2, Pole numbering Done, stay tightening done.

5
SOR: LT Line before

Photo No. 3 Stay angle and winding not proper and thimble not use at H-1.

Compliance: After rectification of Photo No3 Stay angle and winding done properly,thimble used.

.
6
SOR: LT line Before

Photo No. 4 Pole numbering not done.

Compliance: Remarks: In Photo No 4 depict location not found in


the mentioned village.

7
SOR: LT Line before

Photo No. 5 Stay found loose at ELT-1

Compliance: After rectification Photo No-5 Stay tightening has done.


8
SOR: Meter No 736816 (Before)

Photo No. 6 Wiring not dressed properly, LED bulb not found, meter cover not found, PVC pipe not found
at Meter no-736816.

Compliance: In mentioned SOR Photo No. 6 all observation points were not match with SOR (already
rectified), apart from led bulb which is rectified and placed inside the house.
9
10