East India Udyog Limited: Village Electrification Works Under RE-DDUGJY-New Project in State Jharkhand
East India Udyog Limited: Village Electrification Works Under RE-DDUGJY-New Project in State Jharkhand
Of
RE-DDUGJY-New Project
In State Jharkhand
Location:
S. No.
Description of Defects Picture Location as per Remarks
No. SLD
Distribution Transformer
1. Substation numbering not done Photo 1 DTR 1 Rectification Done
2. Stay found lose Photo 1 DTR 1 Rectification Done
3 Oil not found in breather cup Photo 1 DTR 1 Rectification Done
11 KV Line
4 Pole numbering not done Photo 2 HT-2 & all HT Pole Rectification Done
5 Stay angle and winding not proper Photo 3 HT 1 Rectification Done
LT line
6 Pole numbering not done Photo 4 All LT Pole Rectification Done
7 Stay found lose Photo 5 ELT 1 Rectification Done
BPL Connection
8 Wiring not dressed properly Photo 6 Meter no-736816 Rectification Done
Photo No. 1 Substation numbering not done, Stay found loose, oil not found in breather cup, glands not provided.
3
Compliance: After rectification of Photo No 1DTR numbering done, Arcing horn aligned,
breather replaced. (Remarks: Ther is no extra place is available to install Gland)
4
SOR: HT Line (Before)
Photo No. 2 Pole numbering not done and stay lose at H-2.
Compliance: After Rectification of Photo No 2, Pole numbering Done, stay tightening done.
5
SOR: LT Line before
Photo No. 3 Stay angle and winding not proper and thimble not use at H-1.
Compliance: After rectification of Photo No3 Stay angle and winding done properly,thimble used.
.
6
SOR: LT line Before
7
SOR: LT Line before
Photo No. 6 Wiring not dressed properly, LED bulb not found, meter cover not found, PVC pipe not found
at Meter no-736816.
Compliance: In mentioned SOR Photo No. 6 all observation points were not match with SOR (already
rectified), apart from led bulb which is rectified and placed inside the house.
9
10