THE PROJECT LIFE CYCLE
(OF CONSTRUCTED FACILITY)
MARKET DEMANDS OR PERCEIVED NEEDS
Definition of Project
Objectives and Scope
CONCEPTUAL PLANNING AND
FEASIBILITY STUDY
Conceptual Plans or Preliminary
DESIGN & ENGINEERING Design
Construction Plans & Specification
PROCUREMENT & CONSTRUCTION
Completion of Construction
START UP FOR OCCUPANCY
Acceptance of Facility
OPERATION & MAINTENANCE
Fulfilment of Useful life
DISPOSAL OF FACILITY
CONSTRUCTION MANAGEMENT
• Planning
• Execution Management (Admin & Contract administration)
• Handing Over Technique of planning and Control
Construction Technology
Information Technology
Value Engineering
TIME Managing Quality
QUALITY

COST Project Financing


Market Planning & Business Development

Human Resource Management


Communication Management
Risk Management
Procurement etc….



Project Quality Plan
Set up organization structure
Set up Master Program
Budget & Cash Flow
Monitoring & Control (Include
QA&QC)




Stabilise your supply chain






MANAGING QUALITY
Establish The Project Quality Plan


Project Brief
(PQP)  Project Summary
 Scope of work
or IMS  Organization Chart & Outline of
responsibility
• PROCEDURE  List of Approved Suppliers and
• MANUAL Sub Contractors
IN ACCORDANCE WITH WHAT Project Schedule
 Master program, Work


STANDARDS ?
Eg : ISO 14000, OSHA 18000 etc… schedules
 Procurement Plan
What is QA?
 Cash Flow & Cost Control
What is QC?
Project Document Control
 Contract Document
Quality Assurance
 Drawing Register
Quality Control
 List of Quality record
 List of variation record
Code of Ethic  Claims
Rules of Practice (1)  Operational QA /QC procedures
Engineers shall hold paramount the Safety, or Plans
Health and welfare of the public.  Inspection Procedures
 Safety (HSE) management
Beware of Client’s Special
amid so much uncertainty,
clearly requires reviewing capital
and corporate cost budgets as well as
options for raising funds









INDUSTRY 4.0 IN CONSTRUCTION

Keeping your workforce safe, engaged and


skilled is another challenge

Today’s drones are used for rapidly mapping


large areas over long distances, producing
valuable aerial heat maps and thermal images.
The advancing drone software provides real-time,
actionable data that can be used for rapid
decision making, further streamlining the entire
construction process










• Advanced construction technology
• Computer aided software assistance
• BIM (Building Information Modeling)
• Sustainable Development and Related Engineering fields











During Construction / Active Contract

.

LAW
• Construction law builds upon general legal principles and
methodologies and incorporates the regulatory framework (including
security of payment, planning, environmental and building
regulations
Construction Law
• Tendering & Contracting ( )
• Dispute resolution
• Employment Law (
• Environmental Protection ( )
• OHS law











1. OHS 2. Environmental Impact 3. End user safety

Work Place / Project Site Assessment Quality Assurance


Preventive/Mitigation Measures Quality Control
Safety & Health
Protection
Management
