You are on page 1of 13

Saudi Aramco 2616-ENG (10/2002)

OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG'G CERT

MWK
HCK
SBK

SBK

JFGP 2
Jafurah Utilities, Sulfur and Interconnecting Systems
(Package 3)
DESCRIPTION

10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

Contract No. OOK (6600050506) & IK (6600050503)


BI No. 10-14329
JO/EWO

Location JAFURAH, SAUDI ARABIA


21-DEC-16

18-FEB-22
DATE

MECHANICAL DATA SHEET


REV
NO.
A

DISCIPLINE
ENGINEER FOR
HYPOCHLORITE DOSING PACKAGE
SBK
DATE
18-FEB-22
ENGINEERING
MANAGER

DATE
JHK

18-FEB-22
(862-U-2902)
CERTIFIED

MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY

DATE
OPERATIONS

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 1
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS

SAUDI ARABIAN OIL COMPANY


PMT
ENG'G CERT

MWK
HCK

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SBK

SBK

CONTENTS

SECTION DESCRIPTION Page No.

1 Introduction 3
DESCRIPTION

2 Process Duty 4
3 Mechanical Design 5-6
4 Control, Safeguarding and Instrumentation 7
5 8
10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

Electrical
6 Utilities 8
7 Package Data 9
8 Dosing Pump 10-11
9 Dosing Pump Motor Data Sheet 12-13
JO/EWO

21-DEC-16

18-FEB-22
DATE
REV
NO.
A

DISCIPLINE
ENGINEER

SBK
DATE
18-FEB-22
ENGINEERING
MANAGER

JHK
DATE
18-FEB-22
CERTIFIED

MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY

DATE
OPERATIONS

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 2
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS

SAUDI ARABIAN OIL COMPANY


1.0 INTRODUCTION

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

This Data Sheet covers the requirements for Hypochlorite Dosing Package, 862-U-2902, for the Potable Water
ENG'G CERT

MWK
HCK

System for the Jafurah Project.The hypochlorite is intermittently dosed into the pump return line to the potable
water tanks for disinfecting water used for showers and eye wash stations.
SBK

SBK

The hypochlorite dosing package shall consist of, but not be limited to, the following:

- 1 x 100% hypochlorite tank, sized for a minimum of 30 shock dosing volumes at maximum dosing rate.
Tank to be fitted with necessary level gauges & instruments.

- 2 x 100% electrical dosing pumps for hypochlorite, One operation and One stand-by. (Normal Operation)
- 2 x 100% eletrical dosing pumps for hypochlorite, One operation and One stand-by. (Shock Dosing)
DESCRIPTION

- 1 off portable hypochlorite transfer pump for storage tank filling.

- All pumps shall be provided with automatic stroke adjustment.


10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

- All interconnecting piping and instrumentation within the package boundary, including all solation,
control and relief valves; strainers; calibration pots; pulsation dampers; pressure gauges, flow meter on
pump discharge etc.
- All instrumentation wired to skid edge junction box for wiring to the DCS (wiring from junction box to
DCS by others) .

- Junction box located


. at skid edge . .
JO/EWO

. . .

- Necessary sample and drain connections.

- All other mechanical and electrical equipment, instrumentation and controls necessary for safe and
21-DEC-16

18-FEB-22

reliable operation.
DATE

- Structural steel base frame with sun shades (VTC for sun shades).
REV NO.

- Ladders and platforms as necessary


A

DISCIPLINE
ENGINEER
- First fill and supply of chemical containers (TBC). Deleted.
SBK
DATE 1.3 Abbreviations
18-FEB-22
ENGINEERING
MANAGER
The following acronyms and abbreviations are used in this document:
JHK
DATE
Bbl US Barrels
18-FEB-22 BEDD Basic Engineering Design Data
CERTIFIED MBCD Thousand Barrels per Calendar Day
MBD Thousand Barrels per Operating Day
MWK NPS Nominal Pipe Size
DATE
18-FEB-22
P&ID Process and Instrumentation Diagram
PFD Process Flow Diagram
CONSTRUCTION
AGENCY
PSV Process Safety Valve
RTU Remote Terminal Unit
SCADA Supervisory Control & Data Acquisition
TBC To Be Confirmed
DATE VTA VENDOR to advise
OPERATIONS VTC VENDOR to confirm
TBA To Be Advised

DATE 1.4 Reference Documents


CONTROL NUMBER
VERIFICATION

This document shall be read in conjunction with the following related project documents:
EDSD

TD-204409 PFD – Potable Water System


TD-234409 MSD – Potable Water System
TD-254462 P&ID –Potable Water Tank and Pumps
DATE:

TD-821950 Basic Engineering Design Data (BEDD)


BY:

TD-821403 Electrical Basis of Design


TD-821310 C&I Basis of Design
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______

TD-821303 C&I Package Equipment Specification


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 3
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS

SAUDI ARABIAN OIL COMPANY

1.5 Codes and Standards


PMT

All Saudi Aramco standards and procedures shall be followed. EPC Contractor attention is drawn to the

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENG'G CERT

following specific best practices:


MWK
HCK

SABP-A-015 Chemical Injection Systems


17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment
SBK

SBK

17-SAMSS-503 Severe-Duty, Totally Enclosed, Squirrel Cage Induction Motors to 500 HP


31-SAMSS-009 Positive Displacement Pumps - controlled volume.
32-SAMSS-030 Manufacture of Small Metallic Atmospheric Storage Tanks
32-SAMSS-038 Shop - Fabricated skid mounted units.
34-SAMSS-831 Instrumentation for Packaged Units
SAES-P-111 Grounding
SAES-L-310 Design of Plant Piping
DESCRIPTION

17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment


AD-036821-001 Material Guide for Centrifugal Pumps
SAES-A-206 Positive Material Identification
10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

2.0 PROCESS DUTY


2.1 Design Parameters
The package is to provide sufficient dosing for normal operation.
The package will be available 24 hours/day, 365 days/year.
Dosing will be fully automatic with minimum operator intervention during normal operation.
The Hypochlorite Dosing Package shall have 1 hypochlorite storage tank with a dedicated unloading
JO/EWO

pump.

2.2 Discharge Conditions


Dosing rate shall be proportional to main stream flow rate. Dosing pump start / stop shall be
21-DEC-16

18-FEB-22

controlled by measurement of level of free chlorine. The dosing pump discharge pressure shall be
DATE

adequate for supplying the chemical into the inlet line which has a normal injection pressure of
27 psig and a maximum injection pressure of 35 psig.
38
REV
NO.

2.3 Type and Properties of Chemicals


DISCIPLINE
ENGINEER Hypochlorite - max dosing rate = TBA 0.132 (HOLD) Bbl/hr 0.006 USGPM
SBK - min dosing rate = TBA 0.022 (HOLD) Bbl/hr 0.001 USGPM
DATE 18-FEB-22 - Specific Gravity = TBA 1.190 - 1.215 residual chlorine leval at 1.0 ppm
ENGINEERING
MANAGER - pH = TBA 12
JHK Potable Water - potable water tank nominal capacity = 1679 Bbl (TBC)
DATE 18-FEB-22 - temperature = 100°F
CERTIFIED
- presure = Atmospheric
MWK - specific gravity = 0.99 at 100°F
DATE 18-FEB-22 - viscosity = 0.68 cP
628.57 Bbl/hr
CONSTRUCTION
AGENCY - pumping flowrate into potable water tank = 315 BBl/hr (TBC)

DATE 2.4 Equipment Design Requirements


OPERATIONS The design life time for the Hypochlorite dosing package 862-U-2902 shall be 20 years.
The Package shall include controlled volume pumps, tanks, level gauges, strainer, filter, pressure
DATE relief valves, sight glasses and flow metering/monitoring devices, check valves, hand valves, a power
source for the pump and instrumentation to control the injection and to monitor its effectiveness.
CONTROL NUMBER
VERIFICATION

Electrical dosing diaphragm pumps shall be used. Dosing pumps hall be provided with appropriate
alarms and automated controls to provide immediate switchover from running to standby pump, in
EDSD

case of pump failure or the need for maintenance.


DATE:

Each pump shall have an adjustable stroke legth to achieve turndown ratio from maximum flow.
BY:

Alteration of the stroke length shall be possible without shutting the pump down.
Stroke legth to be adjustable, both locally and by a control signal from the remote control room.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ___B______
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________

Mechanical lost motion capacity adjustment is not permitted. Hydraulic lost motion capacity is not
REVISION CERTIFICATE

permitted for duties with motor rating > 1 HP.


Dosing will be fully automatic with minium operator intervention during normal operation.

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 4
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

3.0 MECHANICAL DESIGN


PMT

3.1 Design Conditions


ENG'G CERT

MWK
HCK

While the design conditions of the equipment within the package shall be determined by the Vendor, following criteria
shall be followed:
SBK

SBK

a) Design temperature shall be set at 50ºF above the maximum operating temperature. The minimum upper

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
design temperature shall be 185ºF (for solar gain).
b) The maximum operating temperature is defined as the highest material balance temperature.
Consideration shall also be given to other conditions such as start-up, shut-down etc. Such
temperatures should be considered on a case by case basis to establish if they should be taken as the
maximum operating temperature.
c) The minimum design (metal) temperature for this equipment is 41°F.
DESCRIPTION

d) Design Pressure for pumped systems: process piping and equipment which form part of a pumped
hydraulic system, and which may operate liquid full, shall be designed for the maximum pressure that can
be developed by the pump.
10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

e) A pressure relief valve must be installed on the pump discharge to vent fluid back into the chemical tank
or suction line if pressure builds up. The actual pump internal relief valve setting shall be between 110% and
120% of the rated discharge pressure.

3.2 Materials of Construction


Materials of construction shall be selected by Vendor in line with Company and Project standards. Materials shall be
JO/EWO

appropriate for process design, compatible with all intended process fluids, and suitable for intended application.
Minimum material grade shall be SS316L. Wetted faces of instrumentation shall be compatible with process fluid
without coating or lining. Vendor shall ensure material selections and coatings are suitable for external environment
in accordance with BEDD requirements. PMI is required as per SAES-A-206.
21-DEC-16

18-FEB-22
DATE

3.3 Noise
REV
NO.

The Package shall be limited to a maximum noise level of 85dB(A) at 1m.


DISCIPLINE
ENGINEER
3.4 Piping
SBK
DATE
18-FEB-22 Piping to be adequately supported to avoid vibration. Pipes to be anchored at skid edge. Refer to SAES-L-310
ENGINEERING
MANAGER Section 17.
JHK
DATE Y-Type strainers shall be installed on the suction to each pump.
18-FEB-22

CERTIFIED
Each pump shall have an external PSV with independent discharge line piped back to the tank above the high high
MWK liquid level.
DATE
18-FEB-22
CONSTRUCTION Check valves shall be external type; not integral to any other inline fitting.
AGENCY

Nozzle loads permitted at all terminal points shall be agreed with BUYER. ‘Zero Load’ condition shall not be
DATE accepted.
OPERATIONS

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 5
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF
B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13

DOC CLASS: 2 DSN:


Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

3.5 Tanks
PMT

The storage tanks shall be sized for 30 shock dosing volumes at maximum dosing rate.
ENG'G CERT

MWK
HCK

Storage tank may be free standing if sizing prohibits skid mounting.


SBK

SBK

Tanks shall be manufactured in accordance with 32-SAMSS-030 by an approved Saudi Aramco fabricator.

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Vendor may propose a non-metallic tank as an alternative design for approval by Saudi Aramco. The
Package VENDOR shall complete tank data sheet Form SA-2696 for review by BUYER.
Chemical storage tanks shall, as a minimum, be equipped with fill nozzle, utility nozzle, vent, pressure relief,
overflow, discharge, low point drain, level and temperature instrumentation.
Manways for vertical tanks shall be specified as follows:
1) One 600 mm (24 in) NPS shell manway.
DESCRIPTION

2) One 750 mm (30 in) NPS roof manway for tanks larger than 10,000 gallons capacity.
Anti-swirl baffles (vortex breakers) shall be provided on liquid outlet nozzles upstream of a pump suction side.

Block valves shall be installed directly at the tank nozzles. If more than one line connects to the same nozzle,
10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

valves shall be installed in each line, in addition to the nozzle block valve.

3.6 Calibration Tube


A clearly graduated calibration tube, vented back to tank above the high high liquid level, shall be provided.
Calibration tube may be common or per-pump and shall be provided with all necessary valves and fittings so
the injection rate can be checked during operation.
JO/EWO

Calibration pot shall be robust design with calibrated toughened glass enclosed in steel guard.
Main line chemical feed and calibration tube shut-off valves shall be ¼ turn ball valves and shall be positioned
such that the operator can easily and simultaneously operate both valves during calibration.
21-DEC-16

18-FEB-22
DATE

3.7 Pumps
Chemical Injection Pumps
REV
NO.

Dosing pumps shall be API 675, controlled volume positive displacement type. Pumps shall be provided from
DISCIPLINE Saudi Aramco approved manufacturer and meet the requirements of 31-SAMSS-009.
ENGINEER

SBK Pump shall be double diaphragm type with a diaphragm failure signalling system.
DATE
18-FEB-22
ENGINEERING
Pump shall have an electronic automatic adjustable stroke length controller, capable of remote and local
MANAGER control without stopping the pump.
JHK
DATE
Each pump shall have a minimum operating capacity of 30 - 110% of the recommended dosing rate.
18-FEB-22
CERTIFIED
Chemical transfer pumps
MWK
DATE
18-FEB-22
Transfer pump is typically an air operated, vertical orientation pump. It will be used to pump (transfer) chemical
CONSTRUCTION from barrel / portable drum into the chemical storage tank.
AGENCY

The pump should be complete with:


DATE

OPERATIONS
• Filter / regulator / lubricator for the air line

• Exhaust muffler
DATE
• Earthing cable on a reel with clamp for attachment to a suitable local earthing / grounding point.
CONTROL NUMBER
VERIFICATION

• Flexible Suction and Discharge hoses, lengths to be confirmed by CONTRACTOR


EDSD

Tank transfer/loading pump shall be capable of filling the chemical storage tank within 20 mins.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

JFGP UTILITIES DAT 6


862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
PMT

3.8 Pulsation Damper


Pulsation damper, to ensure an even chemical application, shall be provided in each pump discharge line and
ENG'G CERT

MWK
HCK

sized to provide sufficient degree of damping. Any fitting required for charging the pulsation dampers shall be
provided. Suppression devices shall be furnished as necessary to meet the following criteria.
SBK

SBK

Unfiltered peak to peak pulsation levels shall not exceed 3% of:

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Rated suction pressure or 100 kPa gauge (15 psig) whichever is less;

• Rated discharge pressure or 100 kPa gauge (15 psig) whichever is less.

The following situations shall be avoided:


DESCRIPTION

• Cavitation in the suction or discharge of the pump;

• Over delivery due to suction losses or uncontrolled delivery;


10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

• Exceeding maximum allowable working pressure of pressure containing parts.


Any fittings required for charging the pulsation dampers shall be securely connected to the discharge piping
and accessible from grade/skid. Pulsation dampers shall be designed so that no solids settle in the interior of
these devices.
JO/EWO

4.0 CONTROL, SAFEGUARDING AND INSTRUMENTATION


The package / equipment shall be controlled by SCADA. Safeguarding shall be incorporated in the Wellsite
Emergency Shutdown system (ESD). VENDOR shall provide the functional specification for the control, and
21-DEC-16

18-FEB-22

logic diagrams or similar for the safeguarding. The incorporation of the control in PCS and safeguarding in the
DATE

ESD is by others.
Total flowrate signal (by Others) will be used to provide the ratio control to the dosing pump to adjust the dosing
rate accordingly. The PCS control system shall supply a flow demand signal to each package.
REV
NO.

DISCIPLINE The dosing package tank shall be provided with a local gauge and transmitter to provide remote level
ENGINEER indication, including high and low level alarms.
SBK
DATE A temperature gauge shall be supplied on the tank for indication of fluid temperature.
18-FEB-22
ENGINEERING
MANAGER The pumps shall be provided with a local panel with start/stop facility, emergency stop, selector switch and
JHK
running indication. Remote running indication, pump selection and pump start/stop/trip shall also be provided.
DATE
18-FEB-22

CERTIFIED A pressure gauge shall be supplied on each pump discharge.


MWK
Pressure and flow transmitters shall be supplied on a common service discharge line.
DATE
18-FEB-22
CONSTRUCTION
AGENCY
Double diaphragm pumps shall be provided with a diaphragm failure signal system.
The package shall interface with the Client's Project site Distributed Control System (DCS) and be operated
DATE from there. The incorporation of the control in the DCS is by Others.
OPERATIONS
Instrumentation shall be wired to skid edge junction boxes. Wiring to the DCS will be by Others.
Ref.: 34-SAMSS-831 and TD-821310.

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 7
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
5.0 ELECTRICAL
PMT

Hypochlorite Injection package is installed in a non-Hazardous area.


ENG'G CERT

MWK
HCK

Electrical installation shall be in accordance with 'Auxiliary Electrical Systems for Skid -Mounted Equipment'
17-SAMSS-515, and all applicable referenced specifications and standards.
SBK

SBK

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
All electrical equipment shall meet ambient conditions as stated in Electrical Design Basis TD -821403.
All equipment installed in hazardous (classified) areas, electrical equipment/component meeting the
requirement of IEC 60079 shall be labelled, listed, or certified by any of the agencies in the Approved IECEx
Certification Bodies (ExCBs) under the IECEx Certified Equipment Scheme. Method of protection must be
marked and must correspond with NEC Article 505 requirements for suitable protection method(s) for the
hazardous area where the equipment is applied.
DESCRIPTION

Power cablings to motors will be provided by CONTRACTOR directly to the motor terminal boxes.

VENDOR shall provide on-skid supporting cable tray for the incoming power cables.
10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

All on-skid grounding and bonding connection shall be wired to skid-edge earth busbars. CONTRACTOR shall
provide cabling up to these earth busbars. The grounding and bounding shall be as per SAES -P-111.
Electrical control cabling on skid shall be wired to skid-edge junction boxes by VENDOR. CONTRACTOR shall
provide control cabling up to these junction boxes.
JO/EWO

6.0 UTILITIES
Following utilities are envisaged to be required for the package. VENDOR to indicate requirement of any other
utilities.
21-DEC-16

18-FEB-22
DATE

- Electrical Power 460V / 3Phase / 60Hz (at Users)

- Control Power 230V / 1Phase / 60Hz


REV
NO.

- Demineralised water
DISCIPLINE
ENGINEER
- Nitrogen
SBK
DATE
18-FEB-22 - Instrument Air
ENGINEERING
MANAGER
For operating and design conditions of utilities, refer to the ‘Basic Engineering Design Data’ document
JHK
DATE
18-FEB-22

CERTIFIED

MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 8
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
Pump Tag No TBC TBC
PMT

No. of Pumps 2x100% 2X100%


1 1
CERT

No. of Heads/Pump
MWK
HCK

Service Hypochlorite Dosing Hypochlorite Dosing

Ref. section 2.3


ENG'G

Chemical Ref. section 2.3


SBK

SBK

Ref. section 2.3

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Flow per Head Usgph Ref. section 2.3
Discharge Pressure psig 35 38 38

Remove mixer requirement.


TANK TANK MIXER ACCESSORIES
Equip. No. TBC 12 Equipment No. TBC Pulsation Dampeners. Suction / Discharge
TBA 2.6 (HOLD) ft3
Working Vol. Manufacturer VTA Level Instruments: Gauge YES
(min. 30 doses)
Dia (ins) x Height (ins) VTA Model VTA High Alarm YES
DESCRIPTION

Thickness VTA Impeller Dia VTA Low Alarm YES

Design Pressure Atmos. + static head Shaft Dia VTA Pump Trip YES

Material VTA (NOTE 1) Shaft Length VTA Strainers: per System / Pump / Head YES
10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

Corrosion allowance NIL Shaft Seal arrangement VTA Calibration: Level Gauge / Calibration Gauge
Lid YES Material Wetted Parts (Note 1) VTA Relief Valve External to Pump YES
Access HINGED LID Mounting Arrangement VTA Pressure Gauges ON DISCHARGE

Atmospheric Vent / Purge System Motor 460 Volts 3 Ph 60Hz kW VTA Diaphragm failure signal system : YES
Dissolving Basket N/A Chemical Mixed Hypochlorite Solution 12.5%wt

Relief Valve N/A Mixing Time VTA


JO/EWO

SKID DETAILS TERMINAL POINTS


DIMENSIONS WEIGHTS No. DUTY FLANGE SIZE FLANGE RATING
LENGTH VTA ft DRY VTA lbs TP01 CHEMICAL INLET VTA 150# WNRF
WIDTH VTA ft OPERATING VTA lbs TP02 DRAIN VTA 150# WNRF
21-DEC-16

18-FEB-22

VTA VTA lbs TP03 VENT VTA 150# WNRF


DATE

HEIGHT ft SHIPPING
Sunshade VTA TP04 DISCHARGE TBC 150# WNRF
Lifting Lugs YES TP05 TANK UTILITY WATER TBC 150# WNRF

Earthing Bosses YES TP06 INSTRUMENT AIR TBC 150# WNRF


REV
NO.

Piping Spec: VTA (NOTE 1)

DISCIPLINE
Hazardous Area Classification: SAFE AREA
ENGINEER

SBK Weather Rating SEE BEDD DOCUMENT


DATE
18-FEB-22
NOTES
ENGINEERING
1) Materials of construction shall be suitable for the concentrated chemical solution.
MANAGER

JHK 2) Equipment Tag Nos shall be confirmed by EPC Contractor during Detailed Design phase. will be finalized later.
DATE
18-FEB-22
3) VTA = Vendor to advise. TBC = To be confirmed.

CERTIFIED

MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY

DATE
OPERATIONS

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

APPROVAL/CERTIFICATION

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REQUIREMENTS,

JFGP UTILITIES DAT 9


862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 8010-ENG(11/2010)

OPRNS
SAUDI ARABIAN OIL COMPANY
POSITIVE DISPLACEMENT PUMP DATA SHEET
NOTE: INDICATES INFORMATION TO BE COMPLETED BY THE PURCHASER; BY MANUFACTURER
PMT

DESIGN OPERATING DATA PERFORMANCE DATA


ENG'G CERT

A. SERVICE E PUMP CHARACTERISTICS


MWK
HCK

1. CONTINUOUS INTERMITTENT STAND BY 1. RATED CAPACITY USgal/hr

2. ATTENDED UNATTENDED 2. TURNDOWN RATIO


SBK

SBK

3. PUMP FUNCTION CHEMICAL INJECTION 3. LINEARITY %

4. STEADY STATE ACCURACY %

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. LIQUID CHARACTERISTICS 5. FLOW REPEATABILITY %

1. LIQUID PUMPED Hypochlorite 6. MAX./MIN. ALLOWABLE SPEED RPM -

2. FLOW TEMPERATURE °F AMB 7. MAX./MIN. ALLOWABLE TEMP. °F -

.1 MAX. FLOW TEMPERATURE °F 80 131 8. BHP CONS. AT MAX. CAPACITY (C.1)* BHP

3. SPECIFIC GRAVITY AT FLOW TEMP./ MAX. TEMP. 1.22 1.19 9. BHP CONS. AT MAX. CAP. AND 110% OF E.12* BHP
TBC TBC
4. VISCOS. AT FLOW TEMP./ MAX. TEMP. cP 10. MAX. DISCH. PRESSURE psig
2.5 2.5
5. VAPOR PRESSURE AT FLOW TEMP. psi(a) 0.34 0.6 11. MAX. RELIEF VALVE SETTING psig
DESCRIPTION

.1 V.P AT MAX. FLOW TEMP. psi(a) 1.93 12. ACTUAL RELIEF VALVE SETTING psig

6. PRINCIPAL CORROSIVES 13. PLUNGER DIAMETER in

14. STROKE LENGTH (MAX.) in

15. NPSHR AT MAXIMUM CAPACITY ft

.1 pH OR pH RANGE OF LIQUID PUMPED 12 16. MAX. ALLOW. WORKING PRESS.

C. RATED OPERATING CONDITIONS ( AT °F psig

MIN. MAX NORMAL 17. MINIMUM REQ. DIFFERENTIAL PRESS. psig


ISSUED FOR REVIEW

ISSUED FOR REVIEW

1. CAPACITY RANGE Usgph 0.92 5.56 1.01 *) E.8 AND E.9 TO INCLUDE GEAR AND COUPLING LOSSES

2. NPSH AVAILABLE AT SUCTION PORT ft VTA EQUIPMENT DATA

3. SUCTION PRESS. MIN/RATED psi(g) VTA VTA F. PUMP AND COUPLING MODEL,
4. TOTAL DIFFERENTIAL PRESSURE psi TBC VTA WEIGHTS, LUBRICATION
5. RATED DISCHARGE PRESSURE psi(g) 38 Normal
1. dosing, USGPH : 0.03 (Min.) / 0.089 (Normal) / 0.098 (Max.)
MANUFACTURER

Shock dosing, USGPH : 0.12 (Min.) / 0.385 (Normal) / 0.424 (Max.)


10-14329-0003

10-14329-0003

6. LOCATION .1 TYPE/SIZE
JO/EWO

OFFSHORE ONSHORE OUTDOOR .2 SERIAL NUMBER(S)

7. AREA CLASSIFICATION
21-DEC-16

18-FEB-22

VENDOR
CLASS SAFE ZONE GROUP TEMP. 2. PUMP EQUIPPED WITH : REQ'D
DATE

SUPPLY

8. SUCTION/DISCHARGE PIPE
.1 DRIVER ( INCL. COUPLING
TOTAL ACTUAL LENGTH ft / AND GUARD IF REQUIRED)
REV
NO.

INTERNAL DIAMETER in / .2 BASE PLATE

DISCIPLINE
.3 SUCTION STRAINER ( Y-TYPE )
ENGINEER

SBK D. PUMP/DRIVER/TRANSMISSION TYPE .4 SUCTION MANIFOLD


SUCTION PULSATION BOTTLE ( IF
DATE 18-FEB-22
1. PUMP TYPE .5
REQUIRED )
ENGINEERING
SIMPLEX
MANAGER .6 INTEGRAL ADJUSTABLE
SINGLE DIAPHRAGM DOUBLE DIAPHRAGM HYDRAULIC RELIEF VALVE
JHK
.7 DISCHARGE PULSATION BOTTLE ( IF
DATE 18-FEB-22
PLASTIC DIAPHRAGM (S) METAL DIAPHRAGM (S)
REQUIRED )
CERTIFIED .8 DISCHARGE MANIFOLD

.1 SPEED OR SPEED RANGE RPM 3. COUPLING MAKE TYPE MODEL


MWK
DATE 18-FEB-22
.2 DIRECTION OF ROTATION CW CCW 4. WEIGHTS

CONSTRUCTION
( LOOKING FROM DRIVING END ) 1. PUMP lbs
AGENCY
2. ELECTRIC MOTOR DRIVER CONST. SPEED 2. DRIVER ( INCL. COUPLING) TOTAL WEIGHT lbs

DATE VARIABLE SPEED 5. LUBRICANTS

OPERATIONS .1 SPEED/SPEED RANGE RPM .1 BEARING LUBRICANT ISO VG 46 (VTC)

.2 RATED BHP (EXCLUD. SERVICE FACTOR) BHP SAUDI ARAMCO EQUIV.

DATE .3 HORIZONTAL VERTICAL .2 LUBRICANT


EDSD VERIFICATION

.4 FLANGE MOUNTED FOOT MOUNTED SAUDI ARAMCO EQUIV.


CONTROL NUMBER

.5 SHAFT EXTENSION: STANDARD SPECIAL: .3 HYDRAULIC FLUID

3 INTERMEDIATE TRANSMISSION SAUDI ARAMCO EQUIV.


GEAR BOX RATIO :
DATE:

MAKE AGMA FACTOR UTILITY DATA


BY:

MODEL G. UTILITIES
APPROVAL/CERTIFICATION REQUIREMENTS,

4. INTEGRAL SPEED REDUCER, TYPE 1. ELECTRIC POWER AVAILABLE


THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________

AC PHASE
RATIO : AGMA FACTOR DC VOLTS HERTZ
REVISION CERTIFICATE

5. COUPLING .1 MAIN ELECTRIC DRIVER AC DC 460 3PH / 60Hz

FLEXIBLE .2 CONTROL AC 230 1PH / 60Hz

NONE (INTEGRALLY MOUNTED)

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 10
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 8010-ENG(11/2010)

OPRNS
SAUDI ARABIAN OIL COMPANY
POSITIVE DISPLACEMENT PUMP DATA SHEET
NOTE: INDICATES INFORMATION TO BE COMPLETED BY THE PURCHASER; BY MANUFACTURER
PMT

PUMP OPERATING DATA BUYER'S REFERENCE


ENG'G CERT

H. MATERIALS OF CONSTRUCTION
MWK
HCK

ASTM OR EQUIVILANT 1. DRIVER DATA SHEET Page 12-13

1. LIQUID END VTA 2.


SBK

SBK

2. PLUNGER VTA 3.

3. CONTOUR PLATE VTA

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. HYDRAULIC DIAPHRAGM VTA NOTES

5. PLUNGER DIAPHRAGM VTA 1) NPSHA>NPSHR by 3 ft.

6. PLUNGER PACKING VTA 2) Minimum pump differential pressure required to ensure guaranteed

7. FRAME VTA accuracy shall be specified by Supplier.

8. SUCTION PULSATION BOTTLE VTA 3) Pump stroke or speed are adjusted to control dosing based on From

9. DISCHARGE PULSATION BOTTLE VTA DCS.

10. CHECK VALVE/BALLS VTA


DESCRIPTION

11. RELIEF VALVE, SEAT AND TRIM VTA

12. BASEPLATE VTA

13. PIPEWORK VTA

J. PUMP CONSTRUCTION
1. PUMP NOZZLE

.1 SUCTION SIZE ASME RATING FACING POSITION


10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

THREADED IN. ASME B2.1 TAPERED

FLANGED IN.

.2 DISCHARGE SIZE ASME RATING FACING POSITION

THREADED IN. ASME B2.1 TAPERED

FLANGED IN.
JO/EWO

2 CAPACITY ADJUSTMENT

.1 MECHANICAL, TYPE

HYDRAULIC STROKE SPEED ADJUSTMENT


21-DEC-16

18-FEB-22
DATE

.2 ADJUST. WHILE RUNNING/AND DURING STAND STILL

.3 LOCAL MICROMETER REMOTE BOTH NOTE 3


REV
NO.

.4 MANUAL INCL. LOCKING DEVICE AUTOMATIC


DISCIPLINE
.5 MANUAL TO AUTO SWITCH
ENGINEER
.6 4 20mA INPUT SIGNAL & 4 20mA REMOTE SIGNAL
SBK
DATE 3. PULSATION BOTTLES, TYPE NOTE 2
18-FEB-22
ENGINEERING
.1 SUCT.-VOL./CHARG. PRESS. cu.ft./psi(g)
MANAGER
.2 DISCH.-VOL./CHARG. PRESS. cu.ft./psi(g)
JHK
DATE 18-FEB-22
.3 CHARGING MEDIUM:

CERTIFIED 4. VALVES

.1 SUCTION VALVES SINGLE DOUBLE


MWK
DATE 18-FEB-22
SIZE BALL OTHER
CONSTRUCTION
.2 DISCHARGE VALVES SINGLE DOUBLE
AGENCY
SIZE BALL OTHER

DATE .3 BRINELL HARDNESS: VALVE SEAT

OPERATIONS 5. LUBRICATION

.1 PUMP, GEAR, BEARINGS

DATE SPLASH SUBMERGED FORCED - FEED


EDSD VERIFICATION

.2 DRIVER
CONTROL NUMBER

SPLASH SUBMERGED

6. TYPE OF DOUBLE DIAPHRAGM PUMPS OF THE SAME TYPE & SIZE IN OPERATION

7. TYPE OF DOUBLE DIAPHR. RUPTURE SIGNALING PUMPS MARK NO. INQ./ORDER NO. DATA SHEET NO.
DATE:

-G-
BY:

8. VOLUMETRIC VENTING VALVE REQUIRED

THIS DATA SHEET COVERS XX PUMP(S)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________

K. SPECIAL REQUIREMENTS PUMPS MARK NO(S).


REVISION CERTIFICATE

PUMP TO COMPLY WITH 31-SAMSS-009

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 11
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 17-SAMSS-503 (04/00)

OPRNS
SAUDI ARABIAN OIL COMPANY
17-SAMSS-503, SEVERE DUTY TOTALLY ENCLOSED SQUIRREL CAGE INDUCTION MOTORS
APPLICABLE TO: Inquiry Proposal Purchase As Built
PMT

Plant: Plant No. Driven Equipment:


CHEMICAL INJECTION PUMP
ENG'G CERT

MWK
HCK

Purchaser’s Data to Be Supplied With Inquiry:


SBK

SBK

BASIC DATA
Volts: 460 Phase: 3 Hertz: 60 Nameplate: kW hp

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Full Load RPM: Speed Range for Variable Speed Drive:
Rotation When Facing Motor Opposite Drive End:
Clockwise Counter-Clockwise Bi-Directional
Motor Thrust Loads: None Other
Type Load: Direct Coupled Belt Driven Other
NEMA Torque Design: “B” (normal) Other (specify)
DESCRIPTION

SITE DATA

Area Classification: Non-Hazardous


Hazardous (Classified) Class: Zone Group:
Temperature Class:
Elevation (Specify if Above 3000 ft.): ft

STARTING
10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

Full Voltage Reduced Voltage % and Type


Variable Frequency Drive Unit Type
VFD Details Attached (If motor purchased separately from drive unit.)

MOUNTING
Horizontal Vertical Shaft Up Vertical Shaft Down
JO/EWO

Foot Mounted Flange Mounted, NEMA Type


21-DEC-16

18-FEB-22

ENCLOSURE
DATE

TEFC TENV Explosion Proof Other


Main Terminal Box Conduit Hub Size: in.
REV
NO.
A

DISCIPLINE
ENGINEER Space Heaters

SBK Space Heater Required for motors rated less than 75kW (100HP); Operating Voltage: 120 V, 1 ph
DATE 18-FEB-22 Other Voltage Max. Surface Temp. at Operating Volts ºC
ENGINEERING
MANAGER Heater Leads: Main Terminal Box Separate Heater Terminal Box
JHK
DATE 18-FEB-22
CERTIFIED

MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY

DATE
OPERATIONS

DATE
EDSD VERIFICATION

CONTROL NUMBER

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 12
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 17-SAMSS-503 (04/00)

OPRNS SAUDI ARABIAN OIL COMPANY


17-SAMSS-503, SEVERE DUTY TOTALLY ENCLOSED SQUIRREL CAGE INDUCTION MOTORS
PMT

Vendor Data:
ENG'G CERT

CHEMICAL INJECTION PUMP


MWK
HCK

GENERAL INFORMATION
SBK

SBK

Manufacturer Model Serial No.

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MOTOR DATA
Rating Data at 1.0 Service Factor:
Nameplate Power kW (hp) Voltage 460 Phase 3 Hertz 60
Full Load Speed RPM Enclosure Type Frame Size
Rotation When Facing Motor Opposite Drive End:
Clockwise Counter-Clockwise Bi-Directional
DESCRIPTION

Torque:
Speed-Torque Curve No. Speed-Current Curve No.

Design Data at 1.0 Service Factor and Rated Voltage


No Load Current Amps
Load 25% 50% 75% Full
Amperes
10-14329-0003 ISSUED FOR REVIEW

10-14329-0003 ISSUED FOR REVIEW

Power Factor
Nominal Efficiency
Guaranteed Efficiency

Locked Rotor Amps at Rated Voltage


JO/EWO

Insulation System
Class Temperature Class ºC above ºC ambient at 1.0 SF
21-DEC-16

18-FEB-22
DATE

Bearing Information

Coupling End Bearing: Manufacturer’s Type Part No.


REV
NO.
A

Outboard End Bearing: Manufacturer’s Type Part No.


DISCIPLINE
ENGINEER

SBK Certification: Class Group Division Agency


DATE 18-FEB-22
ENGINEERING
MANAGER Weights/Dimensions

JHK Net Weight lb Rotor Weight lb


DATE 18-FEB-22
CERTIFIED Space Heaters: (Operating Conditions)
MWK Voltage V Wattage kW hp Max. Surface Temp. ºC
DATE 18-FEB-22
CONSTRUCTION
AGENCY

DATE
OPERATIONS

DATE
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. ___________________________
REVISION CERTIFICATE

MECHANICAL DATA SHEET FOR HYPOCHLORITE DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP UTILITIES DAT 13
862 U TE-419893-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN: