JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 2
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
JOB CARD PACKAGE TITLE: ABQ -
Installation of the NLG Wheel AMM Tail Number - MSN -
FSN
ALL
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 2
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
WARNING: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING
NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR
NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO
PERSONS AND/OR DAMAGE TO EQUIPMENT.
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
B. Consumable Materials
REFERENCE DESIGNATION
03GBB1 Synthetic Oil base Grease-General Purpose
Clay Thickened -
03GCB1 Synthetic Oil base Grease-Landing Gear
Wheel Bearing Lithium Thickened -
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
REFERENCE DESIGNATION
D. Expendable Parts
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
REFERENCE DESIGNATION
Ref. Jacking of the Nose Landing Gear
07-12-00-582-001-A
Ref. Nitrogen Filling of the Tires
12-14-32-614-001-A
Ref. Removal of the Safety Devices from the
32-00-00-081-001-A Landing Gears
Ref. Installation of the Safety Devices on the
32-00-00-481-001-A Landing Gears
Ref. Functional Check of Tire Pressures
32-41-00-210-003-A
Ref. Tire Mixability Precautions
32-41-00-910-001-A
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
REFERENCE DESIGNATION
Ref. ACMM 32-41-31
(97153)
Ref. 12-22-00-00 LUBRICATION - DESCRIPTION AND
OPERATION
SUBTASK 32-41-12-865-051-A
A. Make sure that the circuit breaker(s) that follow(s) is (are) open,
safetied and tagged. Use the SAFETY CLIP - CIRCUIT BREAKER as
necessary.
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 6 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
4. Procedure
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 7 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
NOTE: If the NLG wheel has a pressure-sensor seal cap, make sure that
the seal cap is correctly installed and safetied with a nut and a cotter
pin.
NOTE: If the NLG wheel has a Tire Pressure Indicating System (TPIS), the
tie-bolt balance weight must be installed 180 degrees from the TPIS
sensor holder.
NOTE: If the aircraft has the TPIS, install the TPIS balance weight, refer to
the applicable NLG wheel Component Maintenance Manual (CMM).
If the aircraft has no TPIS, no TPIS balance weight is necessary.
SUBTASK 32-41-12-210-054-A
A. Tires of different type
(1) Obey the tire mixability precautions Ref. AMM TASK
32-41-00-910-001.
SUBTASK 32-41-12-210-056-A
B. Tire Pressure Indicating System (TPIS) Configuration
- If the NLG wheel has a pressure-sensor seal cap, make sure
that the seal cap is correctly installed and safetied with a nut
and a cotter pin.
- If the NLG wheel has a SAFRAN TPIS, the tie-bolt balance
weight must be installed 180 degrees from the TPIS sensor
holder.
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 8 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
(b) Clean the axle sleeve (1) with the Non Aqueous
Cleaner-- Petroleum Based - (Material Ref. 08BBB1)
and dry it with AIR SOURCE FILTERED, DRY.
(c) Make sure that the axle sleeve (1) is in the correct
condition.
(e) Make sure that the retaining ring (11) is in its housing.
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 9 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 10 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
(g) Tighten the axle nut (10) until one hole is aligned with
the first subsequent hole in the axle.
(h) Turn the NLG wheel and make sure that the NLG wheel
is installed correctly.
(k) TORQUE the nuts (3) to between 0.4 and 0.45 m.daN
(35.40 and 39.82 lbf.in).
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 11 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
(b) Clean the axle sleeve (1) and the drive dog (13) with
the Non Aqueous Cleaner-- Petroleum Based -
(Material Ref. 08BBB1). Dry them with AIR SOURCE
FILTERED, DRY.
(c) Make sure that the axle sleeve (1) is in the correct
condition.
(e) Make sure that the retaining ring (19) is in its housing.
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 12 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
(d) Turn the NLG wheel in the same direction of the axle
nut (17), and:
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 13 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
(f) Turn the NLG wheel in the same direction of the axle
nut (17), and:
- TORQUE the axle nut (17) to between 10.26
and 11.34 m.daN (75.66 and 83.63 lbf.ft) with
the ADAPTOR NLG (J47549).
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 14 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
(h) TORQUE the nuts (8) to between 0.4 and 0.45 m.daN
(35.40 and 39.82 lbf.in).
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 15 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 16 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
SUBTASK 32-41-12-865-052-A
F. Remove the SAFETY CLIP - CIRCUIT BREAKER and the tag(s) and
close this (these) circuit breaker(s):
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 17 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
SUBTASK 32-41-12-720-050-A
G. Test(s)
(1) Do the functional check of the tire-pressure indicating system
Ref. AMM TASK 32-49-00-720-001.
SUBTASK 32-41-12-440-050-A
DELETED
SUBTASK 32-41-12-942-051-A
A. Removal of the Equipment
(1) Remove the safety devices from the landing gears Ref. AMM
TASK 32-00-00-081-001.
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 18 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
(2) Make sure that the work area is clean and clear of tools and
other items.
(3) Remove the WARNING NOTICE(S).
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 19 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
A
1
2
3
4 A
A
6
4
3
2
8
7
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 20 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
A
1
2
9
3 A
4 8
6
7
5
A
9
8
7
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 21 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Aug
JOB CARD
01/2023
AMM - ABQ - A318/A319/A320/A321 TASK:
32-41-12-400-001-A
32-41-12-04 CONF 00
Tail Number - MSN - TITLE:
MPD TASK:
FSN:
32-41-12-400-001-A - Installation of the NLG Wheel NONE
ALL
MECH. INSP.
EMB SB 32-1392 for A/C 202-202
JCP Title: Installation of the NLG CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 22 of 22
Wheel AMM PRINT DATE: Aug 21/2023
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE