You are on page 1of 2

4/10/23, 18:47 SIS 2.

Boom (SENR7133-00)

SMCS - 6301

Remove And Install Boom


PIP
-
1. Lower the boom to the ground. Remove pins (1) that hold sheave blocks (2) and (4) to the

202 1095
boom. Hang the sheave blocks (2) and (4) on the pipelayer frame.

3 / 1 0 930
2. Remove pins (5) and boom (3). Weight of the boom is 2000 lb. (907 kg).
23:
4 0 / 0
SEN :43- 4
7
3. Put the boom in position on the pipelayer frame. Install pins (5).

© 2 R713 05:00
4. Put the sheave blocks (2) and (4) in position on the boom. Install pins (1).

023 3
Cat
erp
illa
rI nc.

PIP-10950930
2023/10/04
23:47:15-05:00
https://sis2.cat.com/#/print-preview/service/24ba0398-a320-4a46-bc00-5a7a95ca7f9f 1/2
4/10/23, 18:47 SIS 2.0

SENR71330010
© 2023 Caterpillar Inc.

https://sis2.cat.com/#/print-preview/service/24ba0398-a320-4a46-bc00-5a7a95ca7f9f 2/2