LIQUID PENETRANT TESTING REPORT

Report No.: 23-PT1131/PP Date: 28 Sept, 2023


Procedure No: Owner: DAIDO TOSO Co.Ltd
AMI-QHSE-PT
Description: VPA-13/TE34D3
Acceptance Criteria: Production: EGR PIPE
ASME B31.3 Drawing No: 3Y-42216
Date of examination: Base material: Welding process:
28 Sept, 2023 STAINLESS STEEL SS316L GTAW
State of examination: Lighting condition: Surface preparation:
As welded 1756 lux Solvent clean

TESTING MATERIALS INFORMATION


PT Consumables Brand Batch No. Dwell Time (min.) Type
Penetrant NABAKEM 220516/7 10 MCP-2010
Remover/ Treatment NABAKEM 220608/1B - MCC-1010
Developer NABAKEM 230703/7 10 MCD-3010
Surface Temperature: 30oC Location: A.M.I’s Workshop
Result
No. ID No./ Item name Tested location Noted findings Remark
ACC/REJ
Non-relevant Both Side
1 1 Surface of weld ACC
indication
Non-relevant Both Side
2 2 Surface of weld ACC
indication
Non-relevant Both Side
3 3 Surface of weld ACC
indication
Non-relevant Both Side
4 4 Surface of weld ACC
indication
SKETCH: See next page.
Legends: ACC: ACCEPTED REJ: REJECTED
Welding defects: C: Crack U: Undercut IF: Incomplete Fusion
CP: Cluster Porosity SI: Slag inclusion P: Porosity
Forging/ Casting material: L: Linear Indication R: Round Indication
NDT LV II INSPECTOR REVIEWED BY: REVIEWED BY:

Lần ban hành: 02 (11/2022) BM-PT-01


SKETCH: 3Y-42216

Lần ban hành: 02 (11/2022) BM-PT-01